HomeMy WebLinkAboutTIMBERLINE CHURCH PUD EXPANSION - Filed DCP-DEV. CONSTRUCTION PERMIT - 2008-06-13City of Fort Collins
Services
Engineering Department
DEVELOPMENT CONSTRUCTION PERMIT
Permit Number: B 7� Issuance Date; 2(o O
Project Name: _Timberline Chur_ c�ansipn_—
Project Location: south nfr',H ,. n_._._
Permittee:
City and developer eontacPs: ,See attached BAhibit "A" for names and phone numbers of all
contact persons for this project.
Fees: Permit Application Fee (paid at the time of application)
Construction Inspection Fee (paid prior to issuance of this ermit) $ 4�0
P
Total R 3t3,4R.80
Development Bond or other approved security:
.Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shown on the approved plans for the devciopntent.
37 195.00 -._--
Form of security deposited with the City: c-yf=K____
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
l . The Permittee shall be responsible to require their Project Engineer to inco±porate into all design
drawings and specifications the certification of all materials testing by an Engineer. The Permittee
shall have an Engineer prepare revised design drawings and secure City approval for all revisions to
the Utility Plans and related documents. The Petmittee shall have an Engineer represent, as required
by the City in the Development Agreement, that the improvements are constructed in conformance
with the approved Utility Plans and the standards and specifications Of the City. The Pennitlee shall
provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the
constructed public improvements. (All references above to the terms -Project Engineer" and
"Engineer" shall mean a Professional Engineer licensed in Colorado.)
2. All contractors who perform work on this project must be bonded and licensed in ccnforrnance
with City requirements.
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605 • FAX (970) 221-6378
www.fcgov.com
Development Construction Permit, Page 2/5
3. Construction time restrictions:
4. The applicant understands that additional permits maybe required for this development project
and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this project
(utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic
study, drainage report, plat easements and any other official documents), shall be kept on the
development site available for use by City staff doing inspections.
6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or
Section 2.6.3(K) of the Land Use Code, whichever is applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shall expire and the applicant will forfeit the permit fee paid for this
permit, whereupon the applicant must re -apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The applicant
may apply for an extension by reapplication at least two weeks prior to the expiration date.
Such application shall contain information sufficient to justify the granting of the extension.
An extension may be granted for up to six months.
7. Building permits and certificates of occupancy will only be issued when all conditions contained
in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29-
678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the
Development Agreement does not specify times for completion of public improvements, or if there is
no Development Agreement, then the improvement requirements specified in Section 24-95 of the
City Code shall apply, which provides that construction of all improvements shall be required prior
to the time of issuance of the first building permit.
8. Acceptance by the City of the public improvements shall be after (1) final inspection has been
conducted by the City; (2) punch list items from the final inspection are completed and accepted by
the City; and (3) required certifications from the licensed professional engineer that improvements
are completed to City standards, specifications and approved Utility Plans; and the "as -constructed"
plans have been received and accepted by the City.
9. The warranty on street improvements is for five (5) years from the date of acceptance by the City
of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional
Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use
Code, as applicable.
10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any
planned construction on this project. All required perimeter silt fencing and other erosion/sediment
control best management practices (BMP's) that can be installed prior to construction must be in
Development Construction Permit, Page 3/5
place and inspected by the City Erosion Control Inspector before any land disturbing activity begins.
11. No work (including grading and construction access) shall be started in State Highway right-of-
way until a permit is issued by the Colorado Department of Transportation to allow such work to
begin.
12. Other conditions:
Permittee's acknowledgment signature:
By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of
the owners of the property (including all owners having legal or equitable interest in the real property, as
defined in Section 1-2 of the City Code; and including common areas legally connected to or associated
with the property which is the subject of this application) without whose consent and authority the
requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City
officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such
property to perform work required of the applicant if the applicant were to fail to perform the required
work. I also acknowledge that I have read this permit document with all its requirements and
conditions, and I agree to all of the terms and conditions so stated in this permit.
Applicant/Project Manager' s Signature: lwz--tt�� Date: -7 'Zi�1 0Z
Approval for issuance:
City Engineer Approval: �' Date: "Z /2��
(Permit Issuance Date)
Development Construction Permit, Page 4/5
EXHIBIT "A"
DEVELOPMENT PROJECT CONTACT PERSONS
Project Name:
City Staff Contact Persons:
Development Engineer:
Construction Inspector:
Timberline Church Expansion
Marc Virata / City of Fort Collins Engineering
281 N. College Avenue / Fort Collins, CO 80524
970 221-6605
Tracy Dyer / City of Fort Collins Engineering
281 N. College Avenue / Fort Collins, CO 80524
970 221-6605 (Chief Inspector starting 7/30)
Current Planner: Ted Shepard / City of Fort Collins Current Planning
281 N. College Avenue / Fort Collins, CO 80524
970 221-6750
Sanitary Sewer Engineer: Roger Buffington /City of Fort Collins Utilities
700 Wood Street / Fort Collins, CO 80521
970 221-6854
Erosion Control Inspector: D.A. Black / City of Fort Collins, 700 Wood
Street, Fort Collins, CO 80521
970 221-6700
Natural Resources: Dana Leavitt / City of Fort Collins, 281 North
College Avenue, Fort Collins, CO 80522
970 224-6143
Traffic Operations: Eric Bracke / City of Fort Collins, 625 Linden
Street, Fort Collins, CO 80524
970 224-6062
Street closures: Syl Mireles / City of Fort Collins, 625 Linden
Street, Fort Collins, CO 80524
970 221-6815
Forestry: Tim Buchanan / City of Fort Collins, 281 North
College Avenue, Fort Collins, CO 80522
Light and Power: Doug Martine / City of Fort Collins, 700 Wood
Developer' Contact Persons:
Owner/Developer:
Project Engineer:
General Contractor:
Development Construction Permit, Page 515
Street, Fort Collins, CO 80521
970 224-6152
Timberline Church
c/o John Sailer
2908 S. Timberline Road
970 482-4387
970 482-1001 (fax)
970 412-9605 (cell)
cmassocna,frii.com
John Tufte
Northern Engineering
200 S. College Avenue, Suite 200
Fort Collins, CO 80524
970 221-4158
970 221-4159 (fax)
john@nor,themengincering.com
Gary Martinson
Schmidt Earthbuilders
965 S. Kipling Parkway
7250 Greenridge Road
Windsor, CO 80550
970 962-9091
970 962-9081 (fax)
Planner: Whitney Duval
BHA Design
1603 Oakridge Drive
Fort Collins, CO 80525
970 223-7577
o o 0 0 0 0
a v o 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
O p o p 0 0
0 0 0 0 0 0
N In O N n (O
N N
O O O O O O O O o 0
fA IA fA vi fA fA IA f9
0 0 0 0 0 0
f fA fA fA f U)
-�"�
0
w
f� r bn9
to vi Vf fA
N
rA f»
:Gf:
Z
J
O
U
F
=
J W
w
RI
a
N LU
F ? LL
Z
o N N o o
n 0 o 0 0 0 0 0 o
o 0 o v v
J
F
Z07
o OM Mt+1f7
ffl f9 fA fA O� O�
0000 Ci O NM M
di fA fA�� 0M� M� M�
a r.- D p
fRW (»ea fA fA
W U
��
co
F
w'a >
w
O
i!'
2
IL
y w a COLL
>
z U.
z
0°
w
o 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0
U
p,
a
0 0 0 0 0 0
mwu>000
0 0 o ui o 0 0 0 0 0
en»eno �(»�va rn (»
0 0 0 0 666
en»(»wen ea fn
H..
a
�...
H
07
w "��r,
w0�
F' F
a
J Us)
P'
6-,
(L
F
H
F
LL
w
OwZU
Q
w
w
2
O O O O O O
0 0 0 0 0 0
O O O O O p o 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 o
~
y
Z:
O
w
� Z F
F 0
W F
Q i
IH fA N NO
IPr u) fn M V M fA fR fA fR
fA fA fA Vi fA f9 (»
U
_
Z w
m
w
U:)K
»��
ww
ix
0
w
�ya�y�
=
z
zw
LLOOLLOa_
a�
Z
U
m
U U O
V Q U
Fes-'
N N O o N
o 0 o M N o 0 0 0 0
0 0 0 0 0 0 0'.
O
w
O O
O
wZ
��
Z
w
F c7
Z
U
mfw„
w W w
f,
�i>O
1
O
wOa
wp
Z
N
LL w
O
=
2 2
2 2 S 2 2 S 2
? m
U
HU)
LL LL i0U
LL LL LL UUUUUUU
co >- LL Y
a
J J U U W W
J J J
J w J J J (n w
N 0
7
w w w w w w w
U LL
C7 F'
Z 0
C
w
O
mE
w
U
Cw7 w
c
d
Mm
Q
d
E
y U
CL
U)
F
Ix
in W
41
d C N
W
a n
3 J Eo
W¢
U>
41
c
>Nm LL
.R
a
i
o
3 E
J
U
Oaf
o
(a
2Q
S
d N
O
dF
pU
CL
yaid(!d7
.
>
E
wmU
t
m
E
_FZ
wd
>U
o 0 —
m m
> 4)
m m m dmm
0� NE
NN
F
a
a
xFUQ
(n%
(DEL U0LLQU
Z
m