Loading...
HomeMy WebLinkAboutDELLENBACH CHEVROLET PARKING LOT EXPANSION - Filed GC-GENERAL CORRESPONDENCE - 2008-06-03*40 RESOURCE RCE A KLH Engi eering Group CompanyNEE September 27, 1993 Ms. Kerry Ashbeck City of Fort Collins Planning Department 281 North College Avenue Fort Collins, Colorado 80524 Re: Dellenbach Chevrolet Parking Lot Expansion (RCE Job Number 93-150) Dear Kerry: INC. As you requested, I have investigated the grading of the parking lot in regards to the construction of the future sidewalk along McCAelland Drive. Enclosed is a figure showing a typical cross section of the area from the street to the expansion parking lot. On this drawing I have shown 4 alternative sidewalk locations, an attached 6-foot wide sidewalk, and detached 4-foot sidewalks located at offsets of 4.5-, 8-, and 9.5-feet from the back of curb. The slope of the fill will be at a maximum of 3 to 1. As you will notice, each of the sidewalks can be constructed without regrading the expansion parking lot. If you need additional information or have questions, please call. Sincerely, RESOURCE CONSU & GINEERS, INC. 067"-Wa- Paul R. Barker, P.E. Vice President PRB:sp cc: Mike Dellenbach CADATA\WP51\ASHBECK.LTR 3665 JFK Parkway, Building 2, Suite 300 • P.O. Box 270460 • Fort Collins, CO 80527 (303) 223-5556 • Denver Metro (303) 572-1806 • FAX (303) 223-5578 Fort Collins, CO • Davis, CA • Laramie, WY 4VOJ N O 0 ti O u- O in o in 4 ao of X Y 1 S? N N N 0 N V D V 3 3 3 t U U U U v $ Y � ¢ 0 Cl 0 6 0 a S O O N O (M QO r� ro N N N O O O O O LO LO LO LO LO O O N • • • .. O O is u O O N • %W `40 DELLENBACH CHEVROLET • Gee P.O. Box 271065 Fort Collins, CO 80527 3111 S. College Ave. (303) 226-2438 Denver (3o3) 671.5768 Greeley (303) 686-9258 CITY OF FT. COLLINS MARCH 29,1994 ENGINEERING DEPARTMENT 281 N. COLLEGE AVENUE FT. COLLINS, CO. 80522-0580 ATTN: KERRY ASHBECK DEAR KERRY, ENCLOSED PLEASE FIND ROUGH DRAFT OF THE SITE PLAN FOR THE FUTURE EXPANSION AND THE NEED FOR THE CURB CUTS. THE #1 CURB CUT WILL BE USED TO GIVE OUR CUSTOMERS ANOTHER WAY OF ENTRY AND EXIT TO OUR SITE SO THEY DO NOT HAVE TO DEAL WITH THE FRONTAGE ROAD. THE #2 AND #3 CURB CUTS WOULD BE FOR A NEW BODY SHOP AND CAR WASH THAT WE ARE CONSIDERING FOR THE SOUTHWEST SIDE OF THE BUILDING. THESE PROJECTS COULD BE FROM TWO TO FIVE YEARS AWAY, AND WE DO NOT WANT THE ADDED EXPENSE OF REMOVING THE CURB CUTS AND THEN PUTTING THEM BACK IN SEVERAL YEARS LATER. IF YOU HAVE ANY ADDITIONAL QUESTIONS PLEASE CALL ME. SINCERELY, DELLENBACH CHEVROLET-GEO, INC. MIKE DELLENBACH GENERAL MANAGER