Mr. Robert Smith l
Storm Drainage Engineer GypU'
City Engineers Office
P.O. Box 580
Fort Collins, Colorado 80522
Dear Mr. Smith:
The purpose of this letter is to request a waiver of storm drainage
detention requirements for the Helmshire House P.U.D. located at 1204 So.
College Avenue. The 25,000 square foot site presently contains an abandoned
service station complex which includes a service station structure, asphalt
parking areas, and some landscapping. The proposed P.U.D. would in general
reduce the impervious areas.
Based upon no overall change in storm drainage conditions incidental
to the P.U.D., a waiver of storm drainage detention requirements is hereby
requested.
Since
r!*i ^ Y F. P1cCABE, P.E.
n
CITY OF FORT COLLINS
COMMUNITY DEVELOPMENT DEPARTMENT, PLANNING DIVISION
October 28, 1985
MEMORANDUM
TO: Jim Harmon, Finance Director
John Huisjen, City Attorney
Bonnie Tripoli, Development Coordinator
Joe Frank, Acting Planning Director
FROM: Linda Hopkins, Acting Director of Community
RE: Helmshire Inn
9
Devel opmenti�___:
The Planning staff recently received the attached request from Mr. Douglas
Konkel regarding the Helmshire Inn. As the letter notes, the City is
currently reviewing a development proposal to expand the Inn. As part of
the financing agreements for that addition, Mr. Konkel is requesting, on
behalf of the lender, United Bank, copies of the development agreements
related to the project and confirmation that the owner/developer has
properly complied with all provisions of those agreements and other
"requirements of the City of Fort Collins with respect to the development
of the EXISTING Helmshire House Inns project as well as the proposed
addition".
As you are aware, the full amount of required use tax was not collected on
the building permit for this property. Does this request by United Bank and
the request for confirmation on compliance with the City's necessary
requirements give us the opportunity to collect additional use tax
retroactively? I realize it was an error on our part and not a conscious
act of Mr. McCabe's, so my intent is not to penalize him but to make the
correction, if possible. I would appreciate your help with this request. I
have called Mr. Konkel to advise him that we are preparing a response this
week. Please forward your information to me as soon as possible. Thank you.
CC: Felix Lee, Chief Building Official
Peter Barnes, Zoning Administrator
oou - run � u"rns, uoioraao MOZZ • )3U3)221-6750
DEVELOPMENT. PLANNING DIVISION
f
MEMORANDUM
TO Linda Hopkins, Acting Director, Comunity Development
FROM: Bonnie Tripoli, Development Coordinator
DATE: 10-30-85
RE: Helmshire House P.U.D. Phase 2
I had Dave Stringer check Helmshire House for any public improvements left
incomplete with Phase I. The only item left incomplete was that the alley
was paved deleting a required pan down the center. Harry had given Dave a
letter stating that it would be constructed by June 15, 1985. This was
required as a condition of the CO and has not been complied with. As a
result we will require it prior to the issuance of the building permit on
any future phase.
The original Phase two had no public improvements and there was no
development agreement, but with the new Phase 2 and required improvements
we will require one.
CONCEULIAL REVIEW,.,
STAF = COMMENTS
MEETING DATE: November 4, 1985
ITEM : Helmshire
House Amended
PUD
30-83C
APPLICANT:
Harry McCabe
19
Canyon Suite 200 Fort Collins
LAND USE DATA:
COMMENTS:
Co. P0521
Amended plan to delete permanent residence and renlacinq it with
5 additional rooms. Located on the east side of College Ave., south
of Edwards Ave.
1. A concrete pan down the center of the alley is required before further
work is done.
2. Traffic had a concern over employee parking. An additional four spaces
may be needed. Staff resolved that an agreement could be reached between
the City and the applicant, which would require the applicant to provide
the parking spaces at a future date, if it is determined at that time
that the spaces are needed to avoid offsite (on -street) parking
conflicts.
3. CDBG should be contacted to see if they want to move the house which is
on site.
4. The variance to storm drainage detention needs to be amended.
5. More landscaping would be desirable in the area of the alley.
CITY OF FORT COLLINS
COMMUNITY DEVELOPMENT DEPARTMENT, PLANNING DIVISION
November 26, 1985
Eldon Ward
Cityscape Urban Design
Building 21 Old Town Square, Suite 242
Fort Collins, CO 80524
Dear Eldon:
The City staff has reviewed the application for Preliminary and
final approval for Helmshire House Phase II (#30-83c) and offers
the following comments:
1.Water services not abandoned with the first phase must be
abandoned with the second.
2. The 3/4" water line which is to remain is not adequate to
serve the building. No looping of service will be allowed.
3. The Fire protection systems in the existing building must be
extended to protect the proposed building.
4. A new Development Agreement is required.
5. Note #5 should be changed to delete section reading, "caused
by construction of the Helmshire House", and the word "repaired"
should be changed to "replaced".
6. The alley must be repaved to accomodate the drain pan, which
must be installed prior to the issuance of a building permit.
7. If it is determined that additional parking spaces are
needed at a future date, the applicant shall install
such spaces within three (3) months of being notified of such
need.
OFFICE OF COMMUNITY IV
DEVELOPMENT, PLANNING DIVISION
300 LaPorte Ave. • P.O. Box 580 • Fort Collins, Colorado 80522 • (303)221-6750
11
*rr
0
Eldon Ward
November 26,1985
Page 2
8. The State Division of Highways commented on the need for
closure of curb cuts on College Avenue, and the impact of highway
traffic noise. Proper safety measures must be provided during
curb reconstruction work. Noise insulation of the building walls,
including double -pane windows, should be provided to help reduce
the impact of traffic noise.
Please contact me if you have
revisions should be submitted
renderings and 10 full size
Monday, December 9th.
Sincerely,
Bob Wilkinson
City Planner
any questions or concerns. Plan
by Friday, November 29. PMT
copies are due no later than
CC: Bonnie Tripoli, Development Coordinator
%W
`Wi
CITY OF FORT COLLINS
COMMUNITY DEVELOPMENT DEPARTMENT, PLANNING DIVISION
MEMORANDUM
TO: Rich Shannon, Interim City Manager
THRU: Linda Hopkins, Acting Director, Community Development Department
FROM: Bonnie Tripoli, Development Coordinator
DATE: December 30, 1985
RE: Helmshire House Phase 2 Development Agreement
The two items (water lines and streets) under Special Conditions are items
that had not been taken care of with the first phase of this Development.
To assure that they will be completed with this phase, we are requiring
that they be completed prior to the issuance of the building permit.
The alley was not paved according to the plans on file with the first
phase. The City gave Mr. McCabe the date of June 15, 1985 by which to
complete said improvements. This was to allow him to proceed with the
opening of his business until the weather would permit the paving to be
corrected. Since it has not yet been completed to the City's satisfaction
using a deadline to require the improvements and because it will be the
only way for vehicles to access the property, we are requiring the alley be
completed prior to the issuance of the building permit. I have attached
all correspondence regarding this matter.
The abandonment of three water services at the main was requested at
preliminary stage for Phases One and Two but was not followed up on the
final for Phase One. As it turns out, abandoning all services at one time
(phases 1 & 2) makes more sense from both the City's point of view and
probably the Developer's. This way College will only have to be shut down
once for a short period of time rather than twice in a year. Also from the
Developer's point of view it would be more economical to do them all at
once. City Code requires that the water system be installed as required
prior to the issuance of any building permit, so we are just clarifying the
requirement of the Code in this particular case.
OFFICE OF COMMUNITY T
DEVELOPMENT, PLANNING DIVISION
300 LaPorte Ave. • P.O. Box 580 • Fort Collins, Colorado 80522 • (303)221-6750
E cm
Memorandum
To:
Paul
Eckman, Assistant City Attorney
From:
Dave
Stringer,
chief Construction Inspector -
Date:
July
15,1986
RE:
1204
South College
Ave, Helmshire House PUD
Please find attached rorrespnndance regarding the Helmshire
House PUD. These letters and memos concern the concrete alley
pan and other items which were not installed or corrected by
the developer in accordance with the development agreement or
Utility plans for this development.
The building was issued a temporary Certificate of Occupancy
on March 7, 1985 based upon the developers written commitment
to complete and correct the public improvements, (T C O
was extended to September 15, 1985.) These improvements were
not corrected in the time frame specified and when the
Helmshire House Phase II was submitted for P&Z approval a new
Development Agreement was drawn up which required the
completion of the improvements from the original development.
I have recently been informed that Phase II will soon be sold
and will no longer be a part of the Helmshire PUD If this
happens the City will not have any leverage to require the
completion of the improvements other then the T CO"
Hopefully, this information will assist you in determining
what action we can take in order to force the developer to
complete these improvements, If I can be of any further
assistance Please contact me.
rt
STEWART$,�SSOCIATES Final Approved
Dateel ,
Consulting Engineers and Surveyors
September 3, 1991
Mr. Glen -Schlueter S'_iJ�v f/fife
Storm Drainage Utility
City of Fort Collins
P.O. Box 580
Fort Collins, Colorado 80522 /
Dear Glen:
the Helmshire Inn located at the Southeast corner of South College
Avenue and Edwards Street. It is an existing bed and breakfast establishment
that is adding 1000 square feet of asphalt parking. There is some interior
remodeling that is also being done.
The site drains from Southwest to Northeast. College Avenue has a high
point in this block and drains both North and South. There is a catch basin
in the College Avenue gutter at the Edwards Street corner. It accepts only
College Avenue runoff, and I believe the storm drain flows back South to
Pitkin Street. There does not appear to be any storm water overtopping of
College Avenue at this intersection.
Edwards Street drains East in the South gutter. The alley drains from
South to North in the inverted crown of the existing asphalt. The main parking
area has an inverted crown that drains from West to East and flows North
in the alley to the Edwards Street gutter. The existing asphalt parking
spaces on both sides of the alley drain to the center of the alley.
It is proposed to construct the six new parking spaces so that they
also drain to the centerline of the alley.
The existing site does not have any offsite drainage entering it other
than the alley flows entering from the South. The runoff from this site
does not flow onto any private property. The entire runoff flows to the
Edwards Street south gutter.
The existing site does not have onsite storm water detention. The
proposed additional asphalt parking develops 0.10 cubic feet per second of
runoff in a ten—year storm.
Because of the very small increase of runoff and no practical means
of detention, we are requesting a variance to the onsite detention
requirement. We are not proposing any erosion control devices for this small
James H. Stewart
and Associates, Inc.
214 N. Howes Street
P0. Box 429
Ft. Collins, CO80522
303/482-9331
1.r
Mr. Glen Schlueter
September 3, 1991
Page 2
construction project. When the 1000 square feet is stripped of topsoil,
it will be lower than the alley asphalt and, therefore, not cause silting
onto the alley. It is expected the base and asphalt will be placed in a
very short period of time so that no erosion will occur.
The runoff calculations and the drainage plan are enclosed as part of
this report. If you have any questions regarding this site, please call.
Sincerely,
Richard A. Rutherford, P.E. & L.S.
President
jrr
enclosures
Ax
�, �• •���sre;� ?F o
* 5028
.� �TF••• & .• Poo``,
Te,= 4MIN
SUBJECT Fi F/.M,f} �c�'NBy_ fi ��UA T E�„L
PROJECT NO._ _
A R EA
OF
P,2opg2Ty
z4,o00
Aae,4
OF
/4LL.Gy
•
3, o0o
s,F.
To -r4Lr
A
12.E-A
2-7, 000
S.F. _
Z MPeevioul
AeeA
13,005
PC,rl ,Io uj
,4
3945
S, F.
A e v. C=
� x• 852�� f �. Z k 0,
! 4-8� =
D, B 8
= 8 M,u.
U . 7 7 V}
O,GZ. A-,
85• Z
14.8%
DEv.Q X 0, 6 Z =
�FsV Q,�yti _ 0, 8� x 4.8 x o, 4z = z•�z G.F,J.
D6v. �Iouye /.ZSx 0,88x 7,2 X o•rei = 4•¢G
RuNOFr= TNGP.EASE Dve To J600 ,S',F, tiew AsPrI.aLT
Qzye = U. 88 x Z,7 k 0,O Z3 = 0, 0s- G. F, S.
(!k,oy,e = 0, 8$ X ¢.8 x 0.02.3 = = 0.10 c. r,S,
Q 100 ye_ _ /•LSx 0, 86X 7,Zx O. 07,3= 0,17 G•F,s.
STORM WATER UTILITY
Mr. Guy F. McCabe
James H. Stewart and Associates
214 North Howes Street
Fort Collins, CO 80521
Dear Mr. McCabe,
June 29, 1983
Regarding your request for a variance in the detention requirements for
the Helmshire House P.U.D. located at 1204 S. College Avenue I have the
following comments:
Because the proposed improvements will reduce the amount of exisiting
runoff from the site due to the P.U.D. landscaping requirements I see no
problems with your request.
Your request for a variance in the detention requirements for Helmshire
House P.U.D. is hereby approved provided that upon completion of the grading for
the site no points of concentration are created that will cause erosion to
adjacent property or the alley located on the east side of the site.
Sincerely, r
Philip G. Waite
Civil Engineer II, Storm Drainage Division
CC: Bob Smith
Mauri Rupel
-1-
STORM WATER UTILITY
Mr. Lloyd McLaughlin
RBD, Inc.
Drake Terrace, Suite 240
343 W. Drake Rd.
Fort Collins, CO 80526
Re: Helmshire House P.U.D.
Dear Lloyd,
October 4, 1983
Concerning your request for a variance in the detention requirements for the
above referenced project, I have the following comments:
Since the developed site will actually be increasing the amount of pervious area
thus reducing the peak flow and the routing of the runoff will be the same as
now exists I see no problem with your request.
A variance In the detention requirements for the Helmshire House P.U.D. is
hereby approved.
Sincerely,
Philip G. Waite
Civil Engineer 11, Storm Drainage Division
cc: Bonnie Tripoli, Planning Department V
�4✓
n
Harry L. McCabe
Attorney at Law
419 Canyon Suite 300
Fort Collins, Colorado 80501
Department of Engineering
City of Fort Collins Re
Post Office Box 580
Fort Collins, Colorado 80522
Gentlemen:
482-2400
Helmshire House P.U.D. II
Helmshire House Inns, Inc.
A variance from storm water detention is requested for Helmshire
House P.U.D. II. The basis therefore and supporting criteria are the
same as for the variance granted on Helmshire House P.U.D.
Thank you.
Very truly yours,
�1 7 1k
HARR L. NcCABE
�p HELMSHIRE INN
GRAND BED & BREAKFAST HOTEL
February 25, 1985
Mr. Dave Stringer
Engineering Department
City of Fort Collins
Fort Collins, Colorado 80521
Re: Helmshire Inn
1204 South College Avenue
Dear Dave:
Pursuant to your engineering inspection of the above,
please be advised:
1. The property owner agrees to provide perpetual
maintenance of the alley in its present condition,
unless or until an acceptable drain pan can be
installed.
2. Arrangement's have been made for the immediate clean-up
of the street curb area, etc.,and if any sidewalk -curb
damage, is found, the property owner will make necessary
repairs,
3. The property owner will forthwith execute the necessary
right-of-way agreement prepared by your office.
If you need anything further, please advise. Thank -you for
your kind attention and assistance in this matter.
Very truly yours,
HELMSHIRE ,iOUSE INNS, INC.
Helmshire Inn property owner
8
.arr . McCabe, Pres.
IM South College Avenue.
Fort coiline, CJolorado 80524
808.482-2400
►+` "d
CITY OF FORT COLLINS
ENGINEERING SERVICES
March 7, 1985
Helmshire House
Harry L. McCabe
1204 S. College
Fort Collins, CO 80524
Re: 1204 S. College Avenue
Dear Harry:
This letter is in response to your correspondence dated February 25, 1985.
As agreed the City Engineer's office will release for Certificate of
Occupancy 1204 S. College Avenue based upon the conditions as stated
in your letter. However, let it be understood that the City does require
the owners of this property to install the concrete "V" pan as shown
and approved on the Helmshire House utility plans. This pan is to be
installed by June 15, 1985.
During the interim, the owners associated with the Helmshire House Inns,
Incorporated property will be held responsible for the alley -way
maintenance.
Please find enclosed an encroachment permit. Fill out the appropriate
information regarding the fence installed within the public rights -of -way
adjacent to Edwards Street and College Avenue. This permit is to be
returned to the City Engineer's office for the necessary signature.
Sincerely,
David Stringer
Chief Construction Inspector
Enclosure
ENGINEERING SERVICES
• 300 LaPorte Ave . P.O. Box 580 . Fart Collins. CNorado 80522 . (303) 221-6605
r.r
In
CITY OF FORT COLLINS
ENGINEERING SERVICES
June 28, 1985
Helmshire House
c/o Harry McCabe .
1204 S. College
Fort Collins, CO 80524
Re: Helmshire House PUD
Dear Harry:
On March 7, 1985 the City Engineer's office agreed to release its hold on
1204 S. College provided that the conditions as stipulated in your letter
of February 25, 1985 were met, with the exception of the installation of
the alley pan; this was delayed until June 15, 1985. As of this date, the
installation of the concrete alley pan, the request for encroachment, or
the cleanup of the sidewalk, street, and gutter have not been completed.
Please be informed that until such time as the conditions we have discussed
per my letter to you dated March 7, 1985 have been met, the permanent
Certificate of Occupancy will not be issued. In my opinion, the City has
been more than patient in this matter. However, it is now time for the
necessary work to be completed in a timely manner.
Enclosed is an encroachment application form, a copy of my March letter,
and a copy of your letter from February 1985. The intent of this letter is
to clarify the City Engineer's position in this matter and to eliminate any
misunderstanding as to our intention of using the Certificate of Occupancy
process to ootain the public improvements as approved on the Helmshire
House PUD utility plans.
S'ncerely,
� - 1
David Stringer
Chief Construction Inspector
Enclosures
cc: Mike Herzig
Felix Lee
UUIDI'auu UuOee • UU J) ee 1 -bbUb
ftr
CITY OF FORT COLLINS
ENGICIJFFI3INII SLINICFS
August 30, 1985
Mr. Douglas D. Konkel
1405 South College Avenue
Fort Collins, CO 80524
,,4E: Helmshire House Inn P.U.D.
Dear Mr. Konkel:
I have reviewed the boundaries of the active and pending improvement
districts within the City of Fort Collins and, as of this date, I find
none that affect the Helmshire House inn.
Sincerely,
Mau ice E. Rupel, P.E.& L.S.
SID Coordinator
cc: Ms. Charion Greenstreet, Transamerica Title
Paul Eckman
I Nb NfF_I HINC P,CI?VICL6
3C1 ; LoPorce live • 110 1Inn :'iC!U • I of Cn16n.;, Eoh[ i to C30`5P;' f'303i 2'1 E'ti`li
CITY OF FORT COLLINS
ENGINEERING SERVICES
October 23, 1985
Mr. Douglas D. Konkel, Esq.
1405 S. College Avenue
Suite One
Fort Collins, CO 80524
Re: Helmshire House P.U.D. (D.B.A. Helmshire House Inns, Inc.)
Dear Mr. Konkel,
We have reviewed our records and find no special improvement
districts affecting the Helmshire House P.U.D., either active
or proposed.
In checking with our Construction Inspection Division, we find
that Helmshire House, P.U.D. has not completed a concrete drainage
pan in their alley. This is an obligation which must be completed
prior to any ownership changes.
If we can be of further help, please advise.
Sincerely,
Maurice E. Rupel, P.E. & L.S.
SID Coordinator