HomeMy WebLinkAboutDELLENBACH SUBARU - Filed DCP-DEV. CONSTRUCTION PERMIT - 2008-05-29� V
CITY
City of Fort Collins, Colorado
FORT
COLLINS
DEVELOPMENT CONSTRUCTION PERMIT
E`GIPEERINC
CLEPARTMENT
281 NORTH COLLE
303i 221-660`
Permit Number: 99-33 Issuance Date: 17 y
09-20-99 #1
Project Name: Dellenbach Subaru
0061123 L60.'s
Project Location: This project is located at the northeast comer of Swallow Road & Colle
LA329Uz Z.
L P332,9u2
Avenue
Permittee: Dellenbach Motors
VOIIPM.22903
3_
City and developer contacts: See attached Exhibit 'A "for names and phone numbers o,
PM322903 390.E
contact persons for this project
aJBT 1075.-
#8421
Fees: Permit Application Fee (paid at the time of application) ($150.00-Paid
TOTA L 10i_�.1075.-
Erosion Control Deposit (receipt) ($1000-Paid)
CHECK
Construction Inspection Fee (paid prior to issuance of this permit) 1660.40
CHAM6E 0..
Excavation Permit Fee (paid prior to issuance of this permit) 4$ 15.00
Total $1075.
CLERKM 1827
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shown on the approved plans for the development.
$8053.00
Form of security deposited with the City: Cash
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Permittee shall be responsible to require their Project Engineer to incorporate into all
design drawings and specifications the certification of all materials testing by an Engineer. The
Permittee shall have an Engineer prepare revised design drawings and secure City approval for
all revisions to the Utility Plans and related documents. The Pemuttee shall have an Engineer
represent, as required by the City in the Development Agreement, that the improvements are
constructed in conformance with the approved Utility Plans and the standards and specifications
of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to
the City's acceptance of the constructed public improvements. (All references above to the terms
"Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.)
2. All contractors who perform work on this project must be bonded and licensed in
conformance with City requirements.
3. Construction time restrictions: Normal Business Day
tow %40
4. The applicant understands that additional permits may be required for this development
Project and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this project
(utility plans, site plan, landscape plan, development agreement, soils report, pavement design,
traffic study, drainage report, plat easements and any other official documents), shall be kept on
the development site available for use by City staff doing inspections.
6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use
Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shall expire and the applicant will forfeit the permit fee paid for this
permit, Whereupon the applicant must re -apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The applicant
may apply for an extension by reapplication at least two weeks prior to the expiration
date. Such application shall contain information sufficient to justify the granting of the
extension. An extension may be granted for up to six months.
7. Building permits and certificates of occupancies will only be issued when all conditions
contained in the Development Agreement and Sections 3.3.2(C) and (D)of the Land Use Code or
Sections 29-678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable,
are met. If the Development Agreement does not specify times for completion of public
improvements, or if there is no Development Agreement, then the improvement requirements
specified in Section 24-95 of the City Code shall apply, which provides that construction of all
improvements shall be required prior to the time of issuance of the first building permit.
8. Acceptance by the City of the public improvements shall be after (1) final inspection has
been conducted by the City; (2) punch list items from the final inspection are completed and
accepted by the City; and (3) required certifications from the licensed professional engineer that
improvements are completed to City standards, specifications and approved Utility Plans and the
"as -constructed" plans have been received and accepted by the City.
9. The warranty on street improvements is for five (5) years from the date of acceptance by the
City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the
Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of
the Land Use Code, as applicable.
10. The City Erosion Control Inspector must be notified at least twenty four (24) hours prior to
any planned construction on this project. All required perimeter silt fencing and other
erosion/sediment control best management practices (BMP's) that can be installed prior to
construction must be in place and inspected by the City Erosion Control Inspector before any
land disturbing activity begins.
11. No work (including grading) shall be started in State Highway right-of-way until a permit is
2
*400
issued by the Colorado Department of Transportation to allow such work to begin.
Permittee's acknowledgment signature:
By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of
the owners of the property (including all owners having legal or equitable interest in the real property,
as defined in Section 1-2 of the City Code; and including common areas legally connected to or
associated with the property which is the subject of this application) without whose consent and
authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby
permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter
upon such property to perform work required of the applicant if the applicant were to fail to perform
the required work. I also acknowledge that I have read this permit document with all its requirements
and conditions, and I agree to all of the terms and conditions so stated in this permit.
Applicant/Project Manager's Signature:4 Date:
Approval for issuance:
City Engineer
C"
EXHIBIT "A"
DEVELOPMENT PROJECT CONTACT PERSONS
Project Name: Dellenbach Motors
City Staff Contact Persons:
Development Engineer: Mark McCallum, City of Fort Collins, 281 N. College
Avenue, Fort Collins, CO 80522
970/221.6605 ext. 7656
Construction Inspector: Lance Newlin, City of Fort Collins, 281 N. College Avenue,
Fort Collins, CO 80522
970/221.6605
Current Planner: Steve Olt, City of Fort Collins, 281 N. College Avenue, Fort
Collins, CO 80522
970/221.6750 ext. 6341
Water Utilities Engineer: Roger Buffington, 700 Wood Street, Fort Collins, CO
80521
970/221.6854
Stormwater Engineer: Jay Barber, 700 Wood Street, City of Fort Collins, CO
80521
970/221.6063
Erosion Control Inspector: Bob Zakely, 700 Wood Street, City of Fort Collins, CO
80521
970/221.6063
Natural Resources: Kim Kreimeyer, City of Fort Collins, 281 N. College Avenue, Fort
Collins, CO 80522
970/221.6750 ext. 6641
Traffic Operations: Ward Stanford, 700 Wood Street, City of Fort Collins, CO
80521
970/221.6820
Street closures: N/A
Transportation Planning: Kathleen Reavis, 210 East Olive Street, City of Fort Collins,
CO 80524
970/224.6140
Forestry: Tim Buchanan, City of Fort Collins, 281 N. College Avenue,
Fort Collins, CO 80522
970/221.6361
%W IM0
Light and Power: Doug Martine, 700 Wood Street, City of Fort Collins, CO
80521
970/224.6152
Developer's Contact Persons:
Project Manager: Mike Dellenbach, Dellenbach Motors, 3111 S. College
Avenue, Fort Collins, CO 80525
Office: 970/226.2438
Developer:
Mike Dellenbach, Dellenbach Motors, 3111 S. College
Avenue, Fort Collins, CO 80525
Office: 970/226.2438
Owner(s):
Dellenbach Motors, 3111 S. College Avenue, Fort Collins,
CO 80525
Office: 970/226.2438
Project Engineer:
Phillip I. Robinson, James H. Stewart & Associates, Inc.,
P.O. Box 429, Fort Collins, CO 80522
Office: 970/482.9331
Fax: 970/482.9382
Professional License #: Colo #4502
General Contractor: Brian Baldwin, Baldwin Construction, & Development Co.,
P.O. Box 2443, Fort Collins, CO 80522
Office: 970/416.7875
Fax: 9701416.7952
Email: baldwingxerinet com
Outside Contact Persons:
U.S. West Joyce Takemoto, 124 W. Magnolia, Fort Collins, CO
80521
970/224.7473
TCI of Fort Collins Dennis Greenwalt, 1201 University Avenue, Fort Collins,
CO 80521
970/226.3104
Public Service Company Jim Slagle, 1901 East Horsetooth Road, Fort Collins, CO
80525
970/225.7843
Poudre Fire Authority Ron Gonzales, 102 Remington Street, Fort Collins, CO
80524
970/221.6570
2
City of Fort Collins
TO:
FROM:
DATE:
RE:
-tation Services
ing Department
MEMORANDUM
Dellenbach Subaru
Mark McCallum, Development Review Civil Engineer _4�-kf
September 20, 1999
Initiate Development Bond Account
CITY
F70RT
COLLINS
�!E.�'anTPfEN?
:?0.? i
M1T jl
r-
::nF;DiSE
p,;
This memo is to acknowledge the receipt of development bond funds in the amount of
$8,053.00 to guarantee the completion of all public improvements to be constructed as
shown on the approved plans for the development.
When improvements to the Right -of -Way are completed, please call our inspection
recorder at 221-6609 to request an inspection (please allow 24 hours for the
inspection to take place). Once the improvements have passed inspection, the funds
in development bond will be released to you.
Escrow funds have been received from:
Dellenbach Subaru
3111 S. College Ave.
PO Box 271065
Fort Collins, CO 80527-1065
(970) 226-2438
cc: Initiate Escrow file
Judi Vos, Accounts Payable Clerk Initiated by M. McCallum
Development Permit # 99-33
281 North College Avenue - P.O. Box 580 - Fort Collins, CO 80522-0580 - (970) 221-6605
DEVELOPMENT CONSTRUCTION PERMIT
APPLICATION
(2/16/99)
For City use only: Application Number Application Date: l=�
Permit application fee: $ 6,06crl"AY 2E4z�)
INSTRUCTIONS:
l . Complete this form (some questions may not apply to you) and attach all necessary
documents and submit to the Development Engineering Section of the City.
2. If you have any questions contact the Development Engineer
/Nnzk /14-64Lufi at 221-6750.
3. Submit the Application and pay the Application Fee at the fee at the Engineering
counter at 281 No. College Avenue.
PROJECT INFORMATION:
Project Name (as approved by the City):
Project A.K.A. (Marketing name if different from Project Name):
Project Location:
Property Owner(At the time of this permit issuance)
Individual Name:
Company Name
Address:APO
Phone number(s)7
Office: 7i�-&-v2y29
Cellphone: _
Fax number:
Email:
Applicant/Project Manager (The primary contact person for all matters regarding this project, and
the person responsible for all matters referencing "the Developer" in the Development Agreement
for this project):
Individual Name: VIA K-6
Company Name: i7FL- L FPA aA,I—t f 1, LA oTbK S
Address : -S UI 5- C oL-L6-c -E A—,,)
Phone number(s):
Office: 7_ (a _ N
Cellphone: