Loading...
HomeMy WebLinkAboutPENTHOUSE - Filed CS-COMMENT SHEETS - 2008-04-23DEVELOPMENT CENTER EXT.655 July 20, 1983 Mr. George Brelig ROBB & BRENNER, INC. 125 South Howes, Suite 1080 Fort Collins, Colorado 80521 Dear George: Staff has reviewed the Baystone Village, R-H site plan and has the following comments: I. It is staff's opinion that better access would be provided to the site by opening up the west parking area and providing an additional curb cut on Baystone Drive. This curb cut location will be acceptable even though it does not line up with the curb cut across the street. The maximum setback (suggest 40') from street flowline to the parking should be maintained. Bike/pedestrian access from Columbine Avenue into the site should be provided. 2. Pedestrian access to Baystone Drive and Blue Bell Avenue is to be provided. 3. Please verify that 6% of the interior parking lot is to be landscaped. 4. All curb cuts are to be designed to City standard. 5. How will the end of Daisy Street be treated? 6. Storm drainage problems are to be resolved before consideration of the project by the Planning and Zoning Board. 7. Work with Fire Department on the placement of fire hydrants. A revised site plan, addressing the above comments, is to be submitted no later than Monday, August 8, 1983. An 81" x 11" reduction of the site and landscape plan and colored rendering are to be submitted by Monday, August 15, 1983. Sincerely, Cathy Chivnese CC:ro cc: Bonnie Tripoli, Utility Plans Examiner -DEPART MF14T �,. J Q Z LL 0, ,o co CD O E E O 0 C Item -4 53 - 8--;5 Ut C �1el� �vcMa Comments 0