Loading...
HomeMy WebLinkAboutCENTRE AVENUE EXTENSION - Filed DCP-DEV. CONSTRUCTION PERMIT - 2008-04-17l DEVELOPMENT CONSTRUCTION PERMIT APPLICATION (1/7/99) For City use only: Application Number:. 014- 9 94pplicatl00 Dale: � _ permit applkatlon jeer S . -- iNSTRUCTIONS: 1. Complete this form (some questions may not apply to you) and attach all necessary documents and submit to the Development Engineering Section of the City. 2. Ifyou have any questions contact the Development Engineer. at 221-6750. 3. Submit the Application and pay the Application Fee at the fee at the Engineering counter at 281 No. College Avenue. PROJECT IIYFORMATION: Project Name (as approved by the City): Project AXA. (Marketing name if different from Project Name): Project Location: —North of Drake Road and South of Frnana^t Anarl_.. West of College Avenue �-- Property Owner(At the time of this permit issuance). Name: Colorado State -university Address: P.O. Box 483 Fort Coll> n� rn Rn522 Phone number(s): office: 4R9_7.9.J F JwrAik Fax number: 4 R 4- n 3 5 4 Etttail;TAi rr1aa11 r�a RFSTR. Pr)TJ Applicant/Project Manager (The primary contact person for all matters regarding this project, and the person responsible for all matters referencing "the Developer" in the Development Agree ndent for this project): Name: nvavno w llr r Fm�i ra fanartama * T Address: P.n. Anx 7447 T nvPl a (In an"I Phone number(s): Once: 484-91 99 Panar 6. q6Z,-1139 E'- faxnumber: Fi67-3198 Email: %W '.d Project Engineer (A Colorado licensed professional engineer who is the civil engineer the person responsible for the design of this project, responsible for certification that improvements are constructed in accordance with approved plans, responsible for making revisions to plans with City approval and for providing as -constructed plans): Name: Stan Me er - - Address: 209 South Meldrum Fort Collins CC) A-s Phone Office: 482-59 2 - Cellphone: Fax number: 482-6368 Email: Professional License Number:, Developer (The party or parties referenced in the Development Agreement who are responsible for the Developer's obligations contained in the Agreement -add additional names below): Name: Address: Phone number(s): Office: _ Cel(phone: _ Fax number: Email: General Contractor (The contractor in overall charge of the public infrastructure construction): Name: N/A SPR Project M."gar- Address: Phone number(s): Office: Cellphone: Fax number: Email: If you have no General Contractor, list all other contractors below. Grading contractor: Name: Address: 4305 East Harmony Fnrr r 9525 Phone number(s): Office: 223 3151 Cellphone: Fax number: 2 2 3 - 3191 Email: Utility contractor: err M Name: Connell Resourrea Tnr Address: 4305 East Harmony Fort Collins rn Ans')F Phone number(s): Office: 223-3151 Cellphone: _ Fax number: 2 2 3- 3 1 9 1 Email: Concrete contractor for flat work Name: Lawson Co gtruni-Jan Company Address: P.O. Box 1318 Longmont Co an5n2 Phone number(s): Office: 303-776-3456 Cellphone: 303-419-3181 (Ron Johnson) Fax number: 303-938-9955 Email: Concrete contractor for structures: Name: Concrete Address: 4325 Hilltnp nad Lonomont r7 an9DA Phone number(s): Office: Q7n =g_ nonq Cellphone: 970-591-0372 ( Wayne Schell) Fax number: 9 7 0- 5 3 5 -418 2 Email: paving contractor: Name: c 4305 East Harmony Fort Collin c'0 a0525 Address: Phone number(s): Office: 223-3151 Cellphone: Fax number: 223-31 21 Email: Landscape contractor: Name: Nnno Address: Phone number(s): Office: Cellphone: Fax number: Email: Other contractors and parties involved in the project: %W *0 SUBMIT THE FOLLOWING ITEMS (Required for all projects): 81/20Oxl 1,, copy of the Site Plan Proposed Project Schedule Project quantities and cost estimate for all of the public improvements to be constructed. In addition, include all private improvements that are required to be inspected by the City Construction Inspectors. This information must be submitted in the format shown on the attached form tided "Project Quantities and Cost Estimate Sheet." ADDITIONAL SUBMITTALS (Required if checked): ❑ Traffic control plan(s) for the project ❑ Proposed haul routes shown on a City map ❑ Shop drawings ❑ Other CONSTRUCTION COORDINATION MEETING: A construction coordination meeting to discuss plans and special requirements for your project, is required for all development projects. The people required to attend the meeting are the Project Manager, Project Engineer, Developer, people Architect/Land quire Planner and General Contractor (if no General Contractor, representatives for each of the contractors expected to work on this project) People to Attend: List the peoples names and titles for those who will attend the pre - construction meeting: Name Title v �W *ad ESTIMATED COST OF INFRASTRUCTURE IMPROVEMENTS: Provide the estimated value of all public infrastructure improvements that will be constructed and accepted by the City to own and maintain. In addition provide the value of all private infrastructure improvements that the City will inspect and require certification for. The estimate shall be in the same format as the attached sheet titled "Project Quantities and Cost Estimate Sheet." Public infrastructure, estimated cost: S 2 , 146,630 Private infrastructure, estimated cost: S 0 I certify that the information on this permit application along with the required additional submittals are true and correct to the best of my knowledge, and that in filing this application I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and includuig common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon su h property to perform work required of the applicant if the applicant were to fail to perform the requir work. cy Applicant Signature: CENTRE AVE Nm� UNITS OF TOTAL ESTIMATED INSPECTION INSPECTION MEASURE QUANTITY FEE FEE — — -- inforced Concrete Pipe L.F. 1,358 _ $0.60 $814.80 —_� L F.� 1 358 $0.60 $814.80 ncrete Headwall r;.y, _0 — - $3 00� _ iter QualityOutlet Structur C.Y. p — --- - $0.00 — Inlet Types EACH 4 — $3.00 $0.00 — — $90.00 — $360.00 nhole TEACH — — — bto , — 4 -- $90.00 $360.00 —— 1. ter &Sewer — -- iitary Sewer Mam L.F. 1 795 — —I ter Main— - $0.60 $1077.00 L.F. — 4 139 -- — — $0.60 $2 483.40 nch L.F. 5,934 — — - -- $0.60 $3 560.40 ler/Sewer Service Line Sty Fnr`N �-- � —1— -— nyuiani - — -- EACH-- 5 sole -- — 's — --- r— g ( Bend, Tee, Cross EACH 21 —— — EACH 22 r Mam Connection — _ EACH � — 4 — --- !tSystem — ---- ng & Erosion Control L.S. _ p ment , S.Y. 19,500 - & Gutter _ L F. 3 815 — ,had Sidewalk_ L F. 3,815 — strian Ramps — L F, 20 — -- - — — Pan S.F. 480 — 00, $0.00 $1 $0.30 $5,850.06 - $0.80 _ _ $3,072.00 $0.801 n7v5nn- - -- 216 $0.10 $76.60 Page 1