From: Sheri Wamhoff
To: Bob Barkeen
Date: Fri, Feb 15, 2002 4:43 PM
Subject: Liberty commons school
Bob
Just wanted to let you know the outcome of the discussion regarding the extension of March Court so you
can include it in your conceptual comments if they haven't been sent out yet.
We discussed March Court and the connection of March Court out to Midpoint Drive in Transportation
Coordination on Thursday. This connection is something that is highly desired and is needed in order to
help the traffic congestion associated with the school use and for general traffic circulation in the area.
The problems that this site experiences with the drop off and pick up of children will get worse once the
parking is eliminated off of Sharp Point Drive. From what I understand that is to happen once Sharp Point
is extended south.
We realize that with this site being a Charter School we may have difficulty obtaining this connection and
requiring them to make the connection, but we would like it known that it is still an important and desired
connection.
Thanks
Sheri
CC: Cameron Gloss; Dave Stringer; Eric Bracke; Tom ...
January 25, 2007
City of Fort Collins
Enginecring — Development Review
281 North College Avenue
Fort Collins, Colorado 80522
RE: Letter of Intent for Slope Easement
Lot 19, Prospect Industrial pack (Holsinger Drywall)
To Whom It May Concern:
Liberty Common School has been made aware that a certain amount of grading is needed
on our site (Lot 6, Prospect Industrial Park) for the development of the above project. It
appears that this construction will not adversely impact our property, and we feel that it
will be possible to negotiate and dedicate a 2' wide Slope Easement adjacent to the
Project prior to the approval of the Final Development Plans.
Sincerely,
uildmg' "Cor
Peter Kast, President
1725 Sharp Point Drive
Fort Collins, Colorado 90525
January 25, 2007
City of Fort Collins
Engineering — Development Review
281 North College Avenue
Fort Collins, Colorado 80522
RE: Letter of Intent for Slope Easement
Lot 19, Prospect Industrial Park (Holsinger Drywall)
To Whom It May Concern:
Liberty Common School has been made aware that a certain amount of grading is needed
on our site (Lot 6, Prospect Industrial Park) for the development of the above project. It
appears that this construction will not adversely impact our property, and we feel that it
will be possible to negotiate and dedicate a 2' wide Slope Easement adjacent to the
project prior to the approval of the Final Development Plans.
Sincerely,
kuild4 Comer -
Peter Kast, President
1725 Sharp Point Drive
Fort Collins, Colorado 80525