Loading...
HomeMy WebLinkAboutPOUDRE VALLEY HEALTH SYSTEM HARMONY CAMPUS MEDICAL CENTER FOURTH - Filed GC-GENERAL CORRESPONDENCE - 2008-02-21POUDRE VALLEY HEALTH SYSTEM MEMORANDUM TO: The Neenan Company FROM: Linda Gesick, Vice Presiden[ System Development Poudre Valley Health System DATE: August 28, 2006 RE: Granting permission to work on off site items We, Poudre Valley Hospital, grant The Neenan Company, the liberty to excavate, transition, and use areas outside of the designated future building site of the Redstone PVH facility. Work referenced above will include, but not be limited to, the extension of the sanitary sewer from the Redstone POB to a predetermined point at Snow Mesa that resides within the existing utility easement; the extension of the water main line service to a predetermined termination point outside the Redstone PUB LLC property description; and the eastern section of the new parking lot area that will extend beyond the property boundaries. Other improvements may affect the areas outside the building site; these will be accomplished on a case by case basis, such as the relocation of the pump house transformer, irrigation lines and controllers, and other sub -surface and unexposed items that may be discovered during the site development. All areas outside the excavation site will be reclaimed to the existing condition or to a comparable and agreed upon state of acceptance by both parties. CDN #1998-010 2809 East Harmony Road, Suite 200 • Fort Collins, Colorado 80528 • Phone: (970) 297-6700 • Fax: (970) 297-6751 • v .pvhs.org POUDRE VALLEY HEALTH SYSTEM MEMORANDUM TO: City of Fort Collins FROM: Linda Gesick, Vice President System Development Poudre Valley Health System DATE: August 28, 2006 RE: Response to FCP review comments made by the City of Fort Collins regarding the future development of the Harmony Campus sidewalk network and extensions. We, the Poudre Valley Hospital System (PVHS), will comply with the request by the City of Fort Collins, for the future extension of the sidewalk on the north side of the "Private Drive" that provides the interconnectivity between the existing sidewalk, extending to a point, and adjoining to, Snow Mesa Drive. This extension will be an integral part of the "Development Agreement," generated by the City of Fort Collins, and will facilitate the compliance to, as well as the development of, the future building development of the northeast quadrant of the Harmony Campus (PVHS). CDN #1998-010 2809 East Harmony Road, Suite 200 • Fort Collins, Colorado 80528 • Phone: (970) 297-6700 6 Fax: (970) 297-6751 0 vvww.pvhs,org