Loading...
HomeMy WebLinkAboutTIMBERLINE CENTER REPLAT LOT 14 - Filed CS-COMMENT SHEETS - 2008-02-20V I lPi ey"ac Cucnas INC Landscape Architecture Urban Design Planning April 24, 2007 City of Fort Collins Zoning Department 281 North College Avenue Fort Collins, CO 80522 Re: Minor Amendment for Timberline Center Timberline Center is located on the west side of Timberline Drive between Prospect Road and Nancy Gray Drive. The Minor Amendment is for the following changes to the storage unit parcel only: A) Site and Landscape Plans: 1) Number of total buildings has been reduced from 16 buildings to 12 buildings. 2) The area of the individual buildings has changed. 3) Turf in the detention pond and along the perimeter of the site, except along Joseph Allen Drive, has been replaced with a native seed mix. 4) Shrub planting around the perimeter of the site has been revised. 5) Added a CMU screen wall at the office/residence for privacy. B) Civil Plans: 1) Minor re -grading within the parcel. 2) Removed the storm sewer within the site. 3) Revised the emergency access easement. C) Photometrics: 4) Photometric plan has been revised. Phone 970.224.5828 Fax 970.224.1662 401 West Mountain Ave. Suite 201 Fort Collins, CO 80521-2604 vfiipley.com D) Elevations: 1) Roof pitch on perimeter buildings and interior buildings has changed. 2) Modifications of the water service line detail, underground drainage system and drainage pans. 3) Added additional perimeter elevations and office/residence elevations. Thank you for your consideration. Please call if you have any questions. Yours Sincerely Sandy McFeron VF Ripley Associates PROJECT COMMENT SHEET Current Planning DATE: April 25, 2007 TO: Engineering PROJECT PLANNER: Ted Shepard # 41-05C TIMBERLINE CENTER REPLAT Please return all comments to the project planner no later than the staff review meeting: May 16, 2007 Note -.Please identify your redlines for future reference No Problems ❑ Problems or Concerns (see below, attached, or DMS) Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat _Site _Drainage Report _Other _Utility _Redline Utility _Landscape �,w ty, I'MI k- onu,s Current Planning DATE: April 25, 2007 PROJECT COMMENT SHEET TO: Technical Services PROJECT PLANNER: Ted Shepard # 41-05C TIMBERLINE CENTER REPLAT Please return all comments to the project planner no later than the staff review meeting: May 16, 2007 Note - Please identify your redlines for future reference 0 No Problems ❑ Problems or goncerns (see below, attached, or DMS) 7_WC- 14ofSTr1 vo J121y�jr/c,^ Name ('please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat _Site _Drainage Report _Other _Utility _Redline Utility _Landscape City of Fort c�� pffl Selected Issues Report City of PortCollins 2/7/2008 Date: TIMBERLINE CENTER, LOT 14 REPLAT - TYPE I SELECTION CRITERIA: Status = All Department: Engineering Issue Contact: Randy Maizland Topic: Engineering Number:2 Created:5/8/2007 Pending [5/8107] Please add a note to the Plat cover sheet that references the terms and conditions of the original Timberline Center development agreement shall apply to this replat. See redlines for actual note language. Page 1