HomeMy WebLinkAboutAUTUMN CREEK CONSERVATION DEVELOPMENT SECOND - Filed DCP-DEV. CONSTRUCTION PERMIT - 2008-02-13City of Fort Collins
Transportation Services
Engineering Department
City of Fort Collins, Colorado
DEVELOPMENTCONSTRUCTION PERMIT
Permit Number: Issuance Date: _/ I
Project Nanw: Autumn Creek (for work yyiyhin Carpenter Road, SH-392 and-sidc_+lialk along
die roadw_avenly)
Project Locution: Carpenter Road(Stl 39".i lhelween I,emay Ave and CR 9 at Golden Prairie
Dr
Permittee.: l cc Barker LR 33arkcarl3nilde1_ [nc_t9701420_ 788
City and developer contacts: See attached Exhibit "A "for names and phone numbers of all
contact persons for this project.
Nees: Permit App ication Fee (S400.00) Pc -id
Construction Inspection Fee (paid prior to issuance of this permit) $ _ i,923.00
Total S 1,923,00
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shovri on the approved plans for the development.
$ 22,73ft_which is 25% of $90,950.00 �thc full amount which shall be_lreld tiv_t:_the
warranty period
Form of security deposited with the City: �e #EX
PERFORMANCE REQUIREMENTS O? THIS PERMIT:
1. The Permittee shall be responsible to require their Project Engineer to incorporate into all
design drawings and specifications the certification of all materials testing by an Engineer. The
Permittee shall have an Engineer prepare revised design drawings and secure City approval for
all revisions to the tJtility Plans and related documents. The Permittee shall have an Engineer
represent, as required by the City in the Development Agreement, that the improvements are
constructed in conformance with the approved Ctility Plans and the standards and specifications
of the City. The Po:rmhtee shall provide "as -constructed" plans prepared by an Engineer prior to
the City' s acceptance of the constructed public improvements. (All references above to the
terms "Project Engineet" and "Engineer" shall nican a Professional Engineer Lcens(,d in
Colorado.)
1 of 5
281 North College Avenue • PO. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605 • FAX (970) 221-6378
www.fcgov.com
2. All contractors who perform work on this project must be bonded and licensed in
conformance with City requirements.
3. Construction time
4. The applicant understands that additional permits may be required for this development
project and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this project
(utility plans, site plan, landscape plan, development agreement, soils report, pavement design,
traffic study, drainage report, plat easements and any other official documents), shall be kept on
the development site available for use by City staff doing inspections.
6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use
Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shall expire and the applicant will forfeit the permit fee paid for this
permit, whereupon the applicant must re -apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The applicant
may apply for an extension by reapplication at least two weeks prior to the expiration
date. Such application shall contain information sufficient to justify the granting of the
extension. An extension may be granted for up to six months.
7. Building permits and certificates of occupancy will only be issued when all conditions
contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or
Sections 29-678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable,
are met. If the Development Agreement does not specify times for completion of public
improvements, or if there is no Development Agreement, then the improvement requirements
specified in Section 24-95 of the City Code shall apply, which provides that construction of all
improvements shall be required prior to the time of issuance of the first building permit.
8. Acceptance by the City of the public improvements shall be after (1) final inspection has
been conducted by the City; (2) punch list items from the final inspection are completed and
accepted by the City; (3) required certifications from the licensed professional engineer that
improvements are completed to City standards, specifications and approved Utility Plans; and (4)
the "as -constructed" plans have been received and accepted by the City.
9. The warranty on street improvements is for five (5) years from the date of acceptance by the
City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the
Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of
the Land Use Code, as applicable.
2 of 5
10. The City Erosion Control Inspector must be notified at least twenty four (24) hours prior to
any planned construction on this project. All required perimeter silt fencing and other
erosion/sediment control best management practices (BMP's) that can be installed prior to
construction must be in place and inspected by the City Erosion Control Inspector before any
land disturbing activity begins.
11. Other conditions: None
Permittee's acknowledgment signature:
By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of
the owners of the property (including all owners having legal or equitable interest in the real property, as
defined in Section 1-2 of the City Code; and including common areas legally connected to or associated
with the property which is the subject of this application) without whose consent and authority the
requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City
officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such
property to perform work required of the applicant if the applicant were to fail to perform the required
work. I also acknowledge that I have read this permit document with all its requirements and
conditions, and I agree to all of the terms and conditions so stated in this permit.
Applicant/Project Manager's Signature:
Approval for issuance:
City Engineer App val:_
3 i�ofi�5
�/o 7-
Issuance Date)
EXHIBIT "A"
DEVELOPMENT PROJECT CONTACT PERSONS
Project Name: Autumn Creek (for work within Camenter Road SH 392 and sidewalk alone the
roadway only)
Project A.K.A.:
Name, address and numbers
City Staff Contact Persons:
Development Engineer: Sheri Langenberger
281 N. College Avenue, Fort Collins, Co 80524
(970)221-6750 0140
Construction Inspector:
281 N. College Avenue, Fort Collins, Co 80524
(970) 221-6605
Cell (970) 222-
Water Utilities Engineer: Terry Farrill
4700 S. College Ave, Fort Collins, Co 80525
(970)226-3104
Traffic Operations: Eric Bracke
625 Ninth Street, Fort Collins, Co 80524
(970) 224-6062
Street closures: Syl Mireles
625 Ninth Street, Fort Collins, Co 80524
(970)221-6815
Transportation Planning: Kathleen Reavis
210 E. Olive, Fort Collins, Co 80524
(970)224-6140
Forestry: Tim Buchanan
281 N. College, Fort Collins, Co 80524
(970)221-6361
Light and Power: Janet Mctag
700 Wood Street, Fort Collins, Co 80521
(970)221-6700
4of5
Developer's Contact Persons:
Project Manager:
Developer/Owner:
Lee Barker, LR Barker Builder, Inc.
601 Brewer Dr, Fort Collins, Co 80524
(970) 420-8788
Cell (same)
Fax (970)416-8788
lee czlrbarkerbuilder com
William & Alesa Locklear
718 Milan Terrace, Fort Collins, Co 8052
(970)282-0313
Cell (970) 988-6506
Fax (970)282-0899
b.lock Iear(@comcast net
Project Engineer: Kimberly Dail, Northern Engineering
200 S. College Ave, Suite 100
(970) 221-4158
Fax (970) 221-4159
General Contractor: David Peugh, Schmitt Earth Builders
7250 Green Ridge Road, Windsor, Co 80550
(970)962-9091
Cell (970) 566-5642
Fax (970) 962-9081
davidpLt�sebihome.com
Landscape Contractor: Tim Carver, Carver Landscape
P.O. Box 459 Windsor, Co 80550
(970)834-1530
Cell (970) 567-0344
tcarver(a)what-wire com
5of5
�
MPlIXi5 ROC8T UMVE
S
a p r�GJgng"JJG:P.r �c y
{ a! a o e
� 4
5
Ia
x ° o YR
F
�S
S
AUTUMN CR SERVATION DEVELOPMENT
CARPENTER RO
CARPEAD
STRIPING PLAN
NORTHERN
ENGINEERING
..a
--
000000
0 0 0 0 0 0
O O O O O O O O O O
0 0 0 0 0 0 0 0 0 0
O O O O O O
O O G O O (
p
O 0*O 0* 0' O
w w w w w w
606660000 0
w w w w w w w w w w
tC. 0 b ci O G o
w o w w w-
y�
0
W
M
at
l7
z
w
N
O
v
z
J
w
m
ONw
I?a
J
O
Z
=ZQY
OOo t-i
ra wu»00
`»is�p, Uwvw
o
n-r�n i.-d0s 0»
07W
w Gos Uus
w
N
wap�
a
W
IL
w
ZU. wMM
Z
O
o o 0 o o o
o 0 0 o O o
0000000000
0 0 0 0 0 0 0 0 0 0
0000000
0 0 0 0 0 0 o
F
V p
p
w
C
7
o o 0 o o o
wwwwww
o O o O O O o o o o
wwwwwwwwww
0000000
o0es www
W
r
w
U
o a n
d
LL
wx
"'4e w
Z
i
ay
z
i � H
�
OW°'O
ZU
p
>
F-W
H
LU
W
x
o00000
000000
0000000000
0000000000
ooOO000
OW00000
r
N
0
LU
O
W
j z�
U Q Z
W F
Q}
0 0 0 0 0 0
w w w w w w
0 00 00000 00
w w w w w w w w w w
0 N o 0 000
Oo Nw w 0 w w w
W
x
O
W
t0
w
Ir
O
I w W N
in I.- IL�
Lu
W>
>
V
J
2 N �
0
z
WOOLLOa-
Z UUOVQU
a�
m
0000000000
�oo�000
Q
O
Wo00000
W z
2
W
�O
z
U
°
m F
m
J
Inn
� �oU-i
3
a
to
z
w
zz ce
J
O
yzxa
~
UZ
F-
Q
W Q a
w O
W
a
N 0
a W
�,0
Nw
cilii}UU
U.LL iUUUUUUU
fA}LLlici}>-
}Zm
>
LLit
I
�1 u1
W W W W W W W
JN JJ J(/j [/j
w
��
UO
U.
OE-
C
2 N
S
J
� U
m0
U
W
j
H
dy
4T
NU
N
d �-
Q=
Ztl
in
I- =
u
w�
QW
�- N
m J `o
WQNg
w
JO
j
�'
wa
mco
02
az
lz
cc
aON
d
N ~o
yw
a�
om�
�o
—0
a
~ J W
a d c 3 c .rr N C
W
j N C
W O
KQQ
Nc �L yU~
ad Z'�L SSNII �,� dm�
N rndOa c c
10CLL)aVa¢U
Qw
N y
C G c r c
.$ d o ::Sty y y
e >—
`�:o d °� m m c
e
2
w- K
s'y dpm-0
cam' m
mNN0 MWdV
>£..a
�°m3menoL
aZ
Cr.a
Nd'F-UZi¢�
3UJ�jI��IL�>�LL�m
• _
b
q
q p