COMMENT
i�
DATE: April 14, 2001 DEPT: Engineering
PROJECT: #5-01 Summit View Pump Station PDP — Type I
(LUC)
All comments must be received by Ted Shepard no later than the -sue€€
-rfnl ienac naeet�:
`1otJOA t,' A?fit t_, W , ZuDl
❑ No Comment
11'Problems or Concerns (see below or attached)
a_,:�JhoJ� 1s -to be '�voc �jec�
AVk_�_ fir'
4� 4+ti
e�z yt is c fir' v�wC
Date: G�� Signature:
Please send copies
of marked revisions
_Plat _Site
_litility _Landscape I E NO=t BTS — SUBMIT MYLARS
City of Fort Collins
PROJECT
COMMENT SHEET
DATE: Jam>ary 17, 2001 TO: Engineering Pavement
PROJECT: #5-01 SUMMI-I' VIEW PUn1P STATION PDP —
TYPE I (LUC)
All comments must be received by Ted Shepard in Current Planning no
later than the staff review meeting:
February 14, 2001
Note- Please identify your redlines for fixture reference
r l
Sigrrtrture
CHECK Ill?KE 1F YOU WISH l'O RECEIVE COPIES OE REVISIONS
Plat Site Drainage Report Other
Utility Redline Utility Landscape city of Port Collins
Current Planning
DATE: January 17, 2001 TO: Engineering
PROJECT: #5-01 SUMMIT VIEW PUMP STATION PDP —
TYPE I (LUC)
All comments must be received by Ted Shepard in Current Planning no
later than the staff review meeting:
February 14, 2001
Note- Please identify your redlines for future reference
Summit View Pump Station sheet I of 2 February 20, 2001
1. Letter received stated that casement and row dedications were included with this submittal - these were not received.
2. '1 itle the plans - 1 itility Plans for Summit View Pump Station and Waterline"
Did not receive sheets C2, C3, C8, EFI and FFI. If they are listed on the cover sheet approved by the City they need to
be a part of that set.
A. Owners Certification and Director of Planning sienature blocks are not needed on the utility plan set. "They are to be
provided on the site and landscape plans, which are typically not a part of the utility plan set.
5. Provide City signature block on all utility plan sheets.
6. Provide the missing general notes - see attached for list of general notes.
7. Vicinity Map - Road adjacent to the site is considered Timberline Road not Summit View. What is black hollow
junction?
S. Need to show on all sheets the new row line and label all the easements as well as show the properly or easement
boundary for the canal.
9. It you are doing any work within the boundary of the canal property or easement you will need then to sign off on the
plans approving of the work.
to. Since the centerline of the built bridge aligns with the section line the amount of row needed needs to be measured
It oil) the section line. Yes the centerline of the existine roadway moves east but an acceptable design transition to this
centerline would be beyond the limits of this property (a 150 transition for 10 feet would be 500 feet). Need 57.5 from
the section line for row- This means that 27.5 feet need to be dedicated with a 15-foot easement behind it.
1 1 . Need to show that the future sidewalk will be located over the waterline running adjacent to the street.
(continued on neat page)
CIIECK IIIRE I l OC WISH t'0RECFIVI--' COPIES OF REVISIONS
y Plat Site Drainaue Report Other
"4Utility _Aedliile Utility _XLaudscape Cite of Fort Collins
Summit View Pump Station sheet 2 of 2 February 20, 2001
12_ What are the districts separation requirements from utilities - i.e. gas and electric and separation requirements from
trees. Typically elect is runs in the parkway (-5 foot separation) with trees located above. Gas runs in the easement
behind the sidewalk (-7 foot separation). We may need to have a utility coordination meeting to determine if
additional casement is necessary or if they can live with the standard easement with another utility in it.
I3. Grading plan shows a pipe going into the street. What does this tie to? Where does the line that runs parallel to the
street go? What do these lines tie into and where?
1-1 The driveway into the site needs to start a min of 6 feet from the end of the parapet wall for the bridge and needs to be
paved to the property line.
15. The curb location show" in incorrect. The curb line will move west not east from the bridge - or the bridge will be
widened in the future. As indicated above a proper transition would be needed for this. (50:1 transition for 6.5 foot
offset — 335 feet). Just show the flowllne in the ultimate location. As _you are not providing a street design you do not
need to provide the street x-sections as they do not reflect an approved design. This project will need to put up money
fix the design and construction of the Road adjacent to this parcel.
16_ Show a future median in the street across the bridge and in fi-ont of this property.
17- Showing a fire hydrant assembly detail - where is this to be located? I can not find it on the plan view.
18. Showing a Typical blowoff - where is this to be located? I can not find it on the plan view.
19. Street details - If none of this is getting built now, you do not need to provide these details. May want to show it
typical future cross section on one ofthe sheets though to have a record of what was intended.
20_ Sheet 1-1 - the street improvements are shown incorrectly.
1. Plcusc provide a legal description of the property. I will need this for the development agreement. Please fill in
information for development agreement sheet and return.