COMMENT SHEET
Current PlanninLj
RfC. D
DATE: April 20, 2004 TO: Technical Services
PROJECT: #6-96N Harmony Centre PUD, Goodwill PDP -
Type II (LUC)
All comments must be received by Ted Shepard no later than the staff
review meeting:
May 12, 2004
Note - PLEASE identify your redlines for future reference
iDUNDRQS� C U S £ 5 G£GftL Da ES A✓oT, j30rlr� PMOYf AA(l, no "Lfa-r1n,
TNI S 1�&
�T / 9 �--�' 2 �✓dz q c5
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_Plat _Site _Drainage Report
_Utility _Redline Utility _Landscape
_Other
Number: 53 Created: 5/14/2004
[5/14/04] The street width of Pavilion Lane proposed needs to be widened to our
standard commercial local street cross section of a 50' roadway width within 72' of
right-of-way. This widening should occur past the driveway that connects to Pavilion
through the current cul-de-sac as redlined. It is suggested that the widening occurs
somewhat abruptly to clearly define the parking areas created by the widening (as
redlined).
Done.
Topic: Landscaping
Number: 24 Created: 5/11 /2004
[5/11/041 Correct the scale on the landscaping plan.
The scale has been corrected.
Topic: Plat
Number: 14 Created: 5/10/2004
[5/10/04] The plat language has some outdated language in sections. Please
update to the latest version as attached. This language can be emailed if desired.
The plat language has been updated.
Number: 15 Created: 5/10/2004
[5/10/041 Please indicate on the plat the right-of-way to be vacated and dedicated,
both onsite and offsite, in order to accommodate the extension of Pavilion Lane.
Done.
Department: Light & Power Issue Contact: Doug Martine
Topic: Landscaping
Number: 3 Created: 4/26/2004
[4/26/041 Two street trees along Pavilion Lane need to be adjusted to provide 40
feet clearance to planned streetlight. A street lighting plan is included with the
comments. Ornamental trees may be placed within 15 feet of the proposed
streetlight so there does not have to be a significant gap on either side of the
streetlight.
Street trees have been replaced with ornamental trees at the 15' spacing.
Topic: Light & Power
Number: 1 Created: 4/26/2004
[4/26/04] Relocation of existing electric utility facilities, including streetlights, to
extend Pavilion Lane will be at developer expense.
The developer will cover this expense.
Number: 2 Created: 4/26/2004
[4/26/04] Developer will need to coordinate electric utility facilities, including a
location for a transformer and electric development fees with Light & Power
Page 4
Engineering (970) 221-6700. Be sure to include the location of the electrical
transformer on the revised site and landscape plans. The transformer must be
within ten feet of hard surface for emergency change -out, and, at the same time,
must be screened from view from the public streets by landscaping or an enclosure
that meets clearance specifications.
The electrical transformer has been located and shown on the plans. The
developer will coordinate with Light & Power Engineering concerning electric
developments fees.
Department: PFA
Issue Contact: Michael Chavez
Topic: General
Number: 45 Created: 5/12/2004
[5/12/04] REQUIRED ACCESS:
A fire lane is required. The fire lane shall be visible by painting and signage, and
maintained unobstructed. 1997 UFC 901.2.2.1; 901.3; 901.4.2; 902.2.1; FCLUC
A fire lane has been added to the plans.
Number: 46 Created: 5/12/2004
[5/12/04] PREMISES IDENTIFICATION: Approved numerals or addresses shall be
provided for all new and existing building in such a position as to be plainly visible
and legible from the street or road fronting the property. 1997 UFC 901.4.4
Premises identification is shown on the elevation of the building facing JFK
Parkway.
Number: 47 Created: 5/12/2004
[5/12/041 WATER SUPPLY: Commercial
No commercial building can be greater then 300 feet from a fire hydrant. Fire
hydrants are required with a maximum spacing of 600 feet along an approved
roadway. Each hydrant must be capable of delivering 1500 gallons of water per
minute at a residual pressure of 20 psi. 1997 UFC 901.2.2.2
The building is within 300 ft. of two separate fire hydrants.
Number: 48 Created: 5/12/2004
[5/12/04] SPRINKLER REQUIREMENTS:
This proposed building shall be equipped with an automatic fire sprinkler system.
The building will be equipped with an automatic fire sprinkler system.
Number: 50 Created: 5/12/2004
[5/12/04] FIRE LINE REQUIREMENT:
Buildings that are required to be fire-sprinklered shall have a minimum 6-inch fire
line unless hydraulic calculations can support a smaller fire line.
The building will have a 6" fire line.
Page 5
Department: Stormwater Utility Issue Contact: Basil Hamdan
Topic: Detention Requirements
Number: 35 Created: 5/11/2004
[5/11/04] This site is in a part of the McClelland's drainage basin where the detention
release requirement is 0.23 cfs/Acre not 0.5 cfs/Acre as currently designed. Please
revise the calculations for the pond sizing to meet this release rate.
The detention release requirement has been revised (i.e., from 0.50 cfs/ac to
0.23 cfs/ac).
Topic: Erosion Control
Number: 36 Created: 5/11 /2004
[5/11/04]
May 5, 2004
Please delete note number 15, and notes 17 through 28 of the "Standard Erosion
and Sediment Control Construction Plan Notes" on plan sheet CV02.
Notes deleted as requested.
Please provide a narrative in your report that indicates where, when, and how the
BMP's (Best Management Practices) you have listed will be utilized.
A more detailed narrative will be provided with the Final Drainage and Erosion
Control Study.
Please provide PS, EFF, and surety calculations per City of Fort Collins
specifications.
The PS, EFF, and surety calculations per City of Fort Collins specifications will
be provided with the Final Drainage and Erosion Control Study.
The detention pond in the southeast corner of the site should be utilized as a
sediment trap during construction.
Comment acknowledged.
What is the plan to protect downstream/downslope areas from the box culvert
extension and construction of Pavilion Lane?
The proposed improvement will extend the upstream portion of the existing
box culvert. The down stream/downslope areas from the existing box culvert
will not be disturbed.
Topic: Off -site flows
Number: 39 Created: 5/11 /2004
[5/11/04] The design currently routes off -site flows from developed areas to the west
through the detention pond. This makes the pond work in a less efficient manner, it
is suggested that off -site flows be put in a separate system that would bypass the
proposed detention pond.
We considered the idea of using a parallel storm drain system to route the
offsite flows around the proposed detention pond.
Page 6
Topic: Plat
Number: 52 Created: 5/14/2004
[5/14/04] The utility easement on Lot 1 Block 2 should be called a utility and
drainage easement.
Done.
Please extend a utility and drainage easement onto Lot 1 Block 1 where the storm
sewer stub out of the inlet on Pavilion Lane is to be extended.
Done.
Topic: Utility Plans
Number: 37 Created: 5/11 /2004
[5/11/04] Please provide a profile for all proposed storm sewers, this can be done
with a future final compliance submittal.
Comment acknowledged. We will provide the storm drain profiles with the
final compliance submittal.
The drainage plan should show a detention summary table, the 100 year water
surface elevation for the detention pond should be called out, pond should have a
spillway location designated on the plan and a design for that spillway should be
provided.
A detention summary table and the 100-year water surface elevation are
shown on the plans. The emergency spillway is shown on the plan and a
design for the spillway will be provided with the final compliance submittal.
At final, water quality outlet details should be provided, rip -rap should be designed
and placed at all pipe outlet locations.
We will provide a water quality outlet structure with the final compliance
submittal.
Department: Transportation Planning Issue Contact: David Averill
Topic: Construction Plans
Number: 31 Created: 5/11 /2004
[5/11/04] There appears to be a tree located in the middle of the ramp that leads
from the sidewalk fronting on JFK to the "plaza" area of the proposed building
entrance. See landscape plan for redline.
The tree has been relocated.
Number: 32 Created: 5111 /2004
[5/11/04] Please provide a sidewalk access ramp aligned to cross JFK to the NE at
the northernmost point of this proposed development. This will facilitate a
pedestrian crossing of JFK to those parcels east of JFK that are currently vacant.
Upon further consideration, the City has directed us not to show the sidewalk
access ramp aligned to cross JFK Parkway.
Page 7
Number: 38 Created: 5/11/2004
[5/11/04] A 4' detached walk will need to be constructed along the edge of the "open
space" at the western end of the property. This walk needs to include a sidewalk
ramp for pedestrians to access the main walkway that currently exists to the west of
King Soopers.
This sidewalk has been added.
Topic: General
Number: 41 Created: 5/12/2004
[5/12/04] Transportation Planning requests that this development build a sidewalk
along the southern edge of the parcel. This drive aisle does not currently have a
continuous sidewalk on either its north or south side. A sidewalk on the southern
edge of this project would provide a more safe and direct route for pedestrians who
wish to reach the main walkway to the west of King Soopers from JFK. IF
constructed this sidewalk should also have an access ramp to provide a crossing to
the front (west) of King Soopers.
This sidewalk has been added.
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: General
Number: 17 Created: 5/11/2004
[5/11/04] Coordinate site and landscape plans with the civil plans.
All plans have been coordinated.
Number: 18 Created: 5/11/2004
[5111/04] Show all water and sewer lines on the landscape plans and maintain the
required separation distances from trees and shrubs. Include the standard general
notes on the landscape plans pertaining to landscape/utility separation distances
and locating utilities prior to planting.
All water and sewer lines have been shown on the landscape plans and
required separations have been maintained. Standard general landscaping
notes have been added to the plans.
Number: 19 Created: 5/11/2004
[5/11/04] Provide profiles of all proposed sanitary sewer and storm sewer lines.
Include all water, sanitary and storm sewer crossings in the profiles. Maintain 18-
inches of vertical separation between water lines and sewer lines.
The requested profiles will be provided with the final compliance submittal.
Number: 20 Created: 5/11/2004
[5/11/04] Show and label concrete encasement of sewer lines which cross above or
with in 18-inches vertically of water lines.
Done.
Page 8
4a i
Project Comments Sheet
CityofFort Collins Selected Departments
Department: Engineering
Date: July 12, 2004
Project: HARMONY CENTRE PUD, GOODWILL PDP, TYPE II, #6-96N
All comments must be received by Ted Shepard in Current Planning, no later than
the staff review meeting:
July 07, 2004
Note - Please identify your redlines for future reference
Issue Contact: Marc Virata
Topic: Construction Plans
Number: 30 Created: 5/11/2004
[7/9/04] Left as unresolved for reference at the time further design is made.
[5/11/04] Provided the existing Pavilion Lane is shown as commented in #28 and widened
as commented in #53, the level of detail required for this project (prior to a hearing) is
considered satisfactory. After a public hearing the following items will need to be
addressed:
- A profile for the centerline of Pavilion Lane is needed.
- Because centerline stationing was not used, please provide cross -sections of the roadway
at the start and end point of all horizontal curves.
- Label additional existing and proposed elevations of Pavilion out to JFK as redlined (and
as specified in Figure 7-27 of LCUASS).
- The southern flowline profile has a grade break just outside of the curb return and exceeds
.4%, which is not allowed in LCUASS 7.4.1.13.3.
- The length of the sag vertical curve on the south flowline profile appears to be
counterintuitive with the coinciding vertical curve on the north flowline profile. With the south
vertical curve being on the outside of the horizontal curve, shouldn't this length of vertical
curve be longer? (In general the vertical design will be reviewed in greater detail after
hearing when the additional information is provided).
Number: 54 Created: 5/14/2004
[7/9/04] Left as unresolved for future reference.
[5/14/04] Please add a signing and striping plan sheet for bikelane delineation. (The City
will stripe bikelanes out to College Avenue west of the proposed Pavilion Lane extension).
Signature Date
,,.CHECK HEREJF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat ✓Site Drainage Report Other
—7�Utility Redline Utility = Landscape
Page 1
Topic: General
Number: 11 Created: 5/10/2004
[7/9/04] Carried forward as it is not resolved.
(5/10/04] Prior to any agreement towards Current Planning's scheduling of a public hearing
for the project, letters of intent are required to be obtained from all the owners affected by
the Pavilion Lane road alignment. This includes Larimer County Canal Ditch No. 2 and FC
Timberline Development LLC for the odd shaped parcel southwest of the current cul-de-sac.
In addition the property owner(s) directly south and directly west consisting of shopping
centers need to provide letters of intent. The parcel map information shows multiple
ownership for both of these shopping centers. The property owner(s) to the south will also
need to express no objection for the driveway connection onto the private drive which is on
their property.
Number. 64 Created: 7/9/2004
[7/9/04] In general, provided letters of intent are received, the project is set for scheduling a
hearing. The thoroughness and detail in which the previous comments were addressed is
appreciated. As is standard, please note that additional comments may arise when further
vertical design is incorporated into the submittal.
Number: 65 Created: 7/9/2004
[7/9/04] Technical Services comments are redlined on the plat. Please ensure this copy is
returned with the next resubmittal.
Page 2
FINAL PLAN
COMMENT SHEET
Current
DATE: September 14, 2004 TO: Technical Services
PROJECT: #6-96P Harmony Center P.U.D. — Goodwill PDP -
Final Plans
All comments must be received by Ted Shepard no later than the staff
review meeting:
October 13, 2004
Note --Please identify your redlines for future reference
/. 307"N7 &,e 4 4 t_E(�/+L C4.056_
�y�
�N4p"d �� L —Ttie $646-9 is Part of i6e irnale Z1a4%
t4,e vicihi�j w,aP. vJe can nod rewove {he A,aditi9.
�• •Yo Tom- mot/ L✓/Vc5 u2 f/�lTcti�s. �4r1►s�
Cownmen4 etc6ow1edged . Refer fa tt,e revised Han.
.
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _Site _Drainage Report _Other
_Utility _Redline Utility _Landscape
yh*
A
City of Fort Collins
FINAL PLAN
COMMENT SHEET
City of Fort Callins
Current Planning
DATE: September 14, 2004 TO: Engineering
PROJECT: #6-96P Harmony Center P.U.D. — Goodwill PDP -
Final Plans
All comments must be received by Ted Shepard no later than the staff
review meeting:
October 13, 2004
Note --Please identify your redlines for future reference
— 4n -?"- e ��c- vT c s -- -
/n!:7 rCijrS2c-
q
�l
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_Plat _Site _Drainage Report _Other
_Utility _Redline Utility _Landscape city of r u
Project Comments Sheet
City of Fort Collins Selected Departments
Date: October 18, 2004
Project:
HARMONY CENTRE PLID, GOODWILL PDP, TYPE II AND FINAL PLANS
All comments must be received by Ted Shepard in Current Planning, no later than
the staff review meeting:
October 13, 2004
Note - Please identify your redlines for future reference
Issue Contact: Marc Virata
Topic: General
Number: 86 Created: 10/15/2004
[10/15/04] The City was given a draft copy of the agreement required by the ditch company.
A copy of this is provided for the Developer's reference. As advance notice, the City will be
assigning much of the responsibilities to the Developer in the development agreement.
Number: 87 Created: 10/15/2004
[10/15/04] Please provide legal descriptions of the various offsite easements and right-of-
way dedications and vacations necessary for the realignment and extension of Pavilion
Lane. There may be concerns regarding the information once presented. Actual signatures
of the deeds will be required prior to sign off of construction plan mylars.
Number: 93 Created: 10/18/2004
[10/18/04] With the depth of pavement on top of the box culvert extension being less than
the standard and there perhaps being a cover issue for the storm drain lines crossing
Pavilion Lane (of which an alternative design is still needed), the geotechnical report should
be revised to include discussion of this, in conjunction with Comment #90. (Final pavement
design will again be specified at the time of the pavement design report).
Topic: Plat
Number: 91 Created: 10/18/2004
[10/18/04) The right-of-way for Pavilion Lane will need to encompass all of the box
culvert/wingwall section (along with the 9' utility easement).
Dad
�IECK HERE Ii YOU WISH TO RECEIVE COPIES OF REVISIONS
[/_ Plat- L/Site Drainage Report Other
C�(jtility �ine Utility L�andscape
Page 1
PROJECT
COMMENT SHEET
City of Foil Collins
Current Planning
REC. D
DATE: April 20, 2004 TO: Engineering Pavement
PROJECT: #6-96N Harmony Centre PUD, Goodwill PDP -
Type II (LUC)
All comments must be received by Ted Shepard no later than the staff
review meeting:
May 12, 2004
Note - PLEAsE identify your redlines for future reference
No G,p%�
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_Plat _Site _Drainage Report _Other
_Utility _Redline Utility _Landscape
Topic: Utility Plans
Number: 75 Created: 10/15/2004
[10/15/041 For the two storm sewers crossing Pavilion Lane, there is insufficient clearance
from the top of the pipe to the road surface, which compromises the pavement subgrade.
Number: 77 Created: 10/15/2004
[10/15/04] Add signature blocks for the two shopping centers on both side of Pavilion Lane
that are affected by the realigning of Pavilion Lane (FC Timberline? & Pavilion Ltd?)
Number: 78 Created: 10/15/2004
[10/15/04] Remove all indications regarding the pavement section for Pavilion Lane being in
accordance with the previously submitted soils report. The pavement section will be per the
pavement design report which is required after construction starts.
Number: 79 Created: 10/15/2004
[10/15/04] The plan set indicates that an existing electrical line west of the site will be
relocated by others. In checking with City Light and Power, they will relocate this line
though at the expense of the Developer.
Number: 80 Created: 10/15/2004
[10/15/041 The street design for the north side of Pavilion Lane approaching JFK has a
considerable transition length to remove the crown, why was this designed? Considering
the flowline design is at the minimum .5%, I'm concerned that the roadway will be close to
flat for a considerable distance and areas of ponding will occur.
Number: 81 Created: 10/15/2004
[10/15/041 The centerline profile for Pavilion Lane uses the stationing along the north
flowline instead of the stationing shown on the plan view.
Number. 83 Created: 10/15/2004
[10/15/041 Engineering has adopted construction standards effective immediately for
access ramps/truncated domes, a copy of which is attached and should be incorporated into
the plan set. An electronic version of this can be emailed if desired.
Number: 85 Created: 10/15/2004
[10/15/04] Please provide a couple of cross sections at the neckdown where the parking is
removed both at the points of both the expanded and reduced sections. With the flowline
grades remaining the same around the neckdowns, there is a general concern that the cross
slope will steepen through the neckdown or the crown of the street will rise abruptly.
Number: 88 Created: 10/15/2004
[10/15/041 Please provide more clarity as to the area on the north side of Pavilion Lane
between the westernmost driveway on the north side of Pavilion and the point where
Pavilion Lane expands. Is sidewalk being shown here?
Number: 89 Created: 10/15/2004
[10/15/04] Shop drawings and structural calcs for the box culvert extension will be required
prior to the issuance of a development construction permit. Specify on the utility plans that
the box culvert design is to comply with 11.5 of LCUASS and specifically note that the box
culvert shall be designed for vehicular loadings of HS-20 or higher.
Page 2
Number: 90 Created: 10/15/2004
[10/15/04] Please provide more detail regarding the wingwalls in how the grading ties into
them, TOW and BOW elevations, etc. The soils report did not appear to address the
extension of the box culvert, has there been evaluation as to how deep the wingwalls need
to be, thickness, etc?
Number: 92 Created: 10/18/2004
[10/18/04] Please see the marked up information in green on the plans, which was
reviewed by the Engineering Design section of Engineering. In general more questions and
concerns regarding the design of the box culvert extension.
Page 3
I
■
pm
IN
O
o
Marc Virata - Goodwill Industries of Denver - J.F.K.Parkway Project Site Page 1
From: "Feissner, Herman" <Herman.Feissner@Nolte.com>
To: "Marc Virata" <MVIRATA@fcgov.com>
Date: 1112104 10:37AM
Subject: Goodwill Industries of Denver - J.F.K.Parkway Project Site
Marc,
Regarding Comment No. 89: "Shop drawings and structural calcs for the
box culvert extension will be required prior to the issuance of a
development construction permit. . . "
With this project, we propose to extend the box culvert that was
designed by Drexel Barrell & Co. The approved plans for this project are
dated 01/09/98. To what extent are you requiring structural
calculations? Also, can I provide the shop drawings for the box culvert
during construction? It seems premature to request that they be provided
prior to issuance of the development construction permit.
Here is some history on the box culvert section and reinforcement
details.
I talked with Michael Middleton at Drexel Barrell & Co. prior to my last
submittal. During our conversation, I asked Mr. Middleton if we could
use the box culvert section and reinforcement information from sheet 18
of 75 of the plans that he stamped and signed. He agreed to allow us to
use the section and reinforcement details as long as I was willing to
sign off on the design. I agreed.
Since we are proposing to extend an existing box culvert with no
proposed change in the loading requirements or hydraulics. I felt it was
best to use the existing design without proposing modifications. Can I
reference the structural calcs that were completed for the box culvert
by Drexel Barrell?
With regards to comment No. 93: "With the depth of pavement on top of
the box culvert extension ..." I am working with Terracon on this
matter to update the geotechnical report. Prior to the most recent
submittal we revised our design to maximize the cover that we provide
over the existing and the extended box culvert section. In fact, our
proposed design increases the cover over the existing box culvert
section.
Sincerely,
Herman Feissner, P.E.
Associate Engineer
Nolte Associates, Inc.
Fort Collins, Colorado
Direct: (970) 419-1340
Office: (970) 221-2400
FAX: (970) 221-2415
E-mail: herman.feissner@nolte.com
Number 86: Comment acknowledged
Number 87: Comment acknowledged
Number 93: Comment acknowledged. Refer to Terracon's response to this comment
(See attached response).
Number 91: Comment acknowledged.
Number 75: The two (2)-storm sewers that cross Pavilion Lane were revised. The
24" CLIII RCP (i.e., SDA) was replaced with a 19" x 30" HEIII and the 18" CLIII RCP
(i.e., SDC) was replaced with a 14" x 23" HEIII. Listed below is the cover over each
pipe at the flowline (FL) and edge of pavement (EOP) on the north and south sides of
Pavilion Lane:
** All distances are measured to the outside top of pipe.
FL EOP
SDA-IST-100: 1.38' 1.55'
SDA-IST-101: 1.63' 1.80'
SDC-IST-102: 1.41' 1.59'
SDC-IST-103: 1.54' 1.70'
In all cases, at least 18" of cover is provided at the EOP. At the FL, the cover drops
below 18" in front of SDA-IST-100 and SDC-IST-102 by 0.12' and 0.09'. Is it
necessary to request a variance?
Number 77: Comment acknowledged. Signature blocks for both parties have been
added to the cover sheet.
Number 78: Comment acknowledged.
Number 79: The note on sheet EX01 was revised. The note reads Existing electrical
line to be relocated away from reset fire hydrant (BY CITY OF FORT COLLINS)".
Number 80: Comment acknowledged. The street design along the north side of
Pavilion Lane was revised.
Number 81: Comment acknowledged. The centerline profile for Pavilion Lane uses
the stationing shown in the plan view.
Number 83: Comment acknowledged. The construction standards for access
ramps/truncated domes were incorporated into the plan set.
Number 85: Comment acknowledged. Please refer to the attachment that illustrates
the cross -slope at three different locations along the neck -down. The cross -slopes at
each cross-section are not excessively steep.
Number 88: Yes, we are proposing sidewalk on the north side of Pavilion Lane
between the westernmost driveway on the north side of Pavilion Lane and the point
where Pavilion Lane expands. Additionally, we are proposing a standard driveway
approach for the ditch rider to use to access the ditch road.
Number 89: The structural calculations for the box culvert extension are included
with this submittal. The shop drawings will be provided prior to the issuance of the
development construction permit.
Number 90: Comment acknowledged. Refer to sheet FG01 for TOW and BOW
elevations. Refer to sheet DT01 for more information about the box culvert and how
it ties to the existing irrigation baox culvert. Terracon prepared a response to this
comment that addresses the singwall support and soil preparation. (See attached
response).
Number 92: Comment acknowledged.
Number 82: The reinforcement detail for the water quality box outlet structure is
shown on sheet DR03 as Standard Plan No. M-604-11: Inlet, Type D.
Number 67: Comment acknowledged.
Number 69: Comment acknowledged. Refer to sheet DR02 for the retaining wall
construction detail.
Number 84: Comment acknowledged. See response and/or revised plan from the
Landscape Architect.
Number 70: Comment acknowledged. The construction plans call for Oakum Chord
to be used on the elliptical pipes that are surcharged.
Number 76: See response to comment Number 75.
Number 72: We moved the storm drain (i.e., SDC) to the west side of the sidewalk
along J.F.K. Parkway for a couple of reasons. This move created more distance
between the existing fire hydrant and the proposed storm drain, but not a full 10'.
The access hole for the proposed storm drain manhole must stay out of the sidewalk;
the east side of the sidewalk allowed us to design it that way. There is not room for
the manhole on the west side of the sidewalk.
The distance between the existing fire hydrant and the proposed storm drain is f6'.
Can we use flow fill or some other fill material between the fire hydrant and the
storm drain? Can the fire hydrant be moved north on Pavilion Lane until there is 10'
of clearance between it and the storm drain?
Number 73: Comment acknowledged. See sheet UT01 for revisions.
Number 74: Comment acknowledged. The retaining wall on the south side of the
proposed detention pond was moved out of the utility easement.
NOV-02-2004 TUE 11:25 AN NOLTE ASSOCIATES FAX NO. 9702212415 P. 02
STAFF PROJECT REVIEW
GOODWILL INDUSTRIES OF DENVER Date: 10/19/2004
ALLER LINGLE ARCHITECTS, SHAUN MOSCRIP
712 WHALERS WAY, SUITE B-100
FORT COLLINS, CO 80525
Staff has reviewed your submittal for HARMONY CENTRE PUD, GOODWILL PDP,
TYPE II AND FINAL PLANS, and we offer the following comments:
ISSUES:
Department: Engineering Issue Contact: Marc Virata
Topic: General
Number: 86 Created: 10/15/2004
[10115/04] The City was given a draft copy of the agreement required by the ditch
company, A copy of this is provided for the Developer's reference. As advance
notice, the City will be assigning much of the responsibilities to the Developer in the
development agreement.
Number: 87 Created: 10/15/2004
110/15/04] Please provide legal descriptions of the various offsite easements and
right-of-way dedications and vacations necessary for the realignment and extension
of Pavilion Lane. There may be concerns regarding the information once presented.
Actual signatures of the deeds will be required prior to sign off of construction plan
mylars.
Number:93 ' Created:10/18/2004�
110/18/041 With the depth of pavement on top of the box culvert extension being
less than the standard and there perhaps being a cover issue for the storm drain
lines crossing Pavilion Lane (of which an alternative design is still needed), the
geotechnical report should be revised to include discussion of this, in conjunction
with Comment #90. (Final pavement design will again be specified at the time of the
pavement design report).
Topic: Plat
Number: 91 Created: 10/18/2004
[10/16/04] The right-of-way for Pavilion Lane will need to encompass all of the box
culvert/wingwall section (along with the 9' utility easement)_
Topic: Utility Plans
Number: 75 Created: 10/15/2004
(10/15/041 For the two storm sewers crossing Pavilion Lane, there is insufficient
clearance from the top of the pipe to the road surface, which compromises the
pavement subgrade.
Page 1
NOV-02-2004 TUE 11:25 AM NOLTE ASSOCIATES FAX NO. 9702212415
P. 03
Number: 77 Created: 10/15/2004
[10/15/04] Add signature blocks for the two shopping centers on both side of
Pavilion Lane that are affected by the realigning of Pavilion Lane (FC Timberline? &
Pavilion Ltd?)
Number. 78 Created: 10/15/2004
[10/15/041 Remove all indications regarding the pavement section for Pavilion Lane
being in accordance with the previously submitted soils report. The pavement
section will be per the pavement design report which is required after construction
starts.
Number; 79 Created: 1011512004
[10115/041 The plan set indicates that an existing electrical line west of the site will
be relocated by others. In checking with City Light and Power, they will relocate this
line though at the expense of the Developer.
Number: 80 Created. 10/15/2004
[10/15/041 The street design for the north side of Pavilion Lane approaching JFK
has a considerable transition length to remove the crown, why was this designed?
Considering the flowline design is at the minimum .5%, I'm concerned that the
roadway will be close to flat for a considerable distance and areas of pond Ing will
occur.
Number: 81
Created: 10/15/2004
[10/15/041 The centerline profile for Pavilion Lane uses the stationing along the
north flowline instead of the stationing shown on the plan view,
Number: 83 Created: 10/15/2004
[10/15/04] Engineering has adopted construction standards effective immediately
for access ramps/truncated domes, a copy of which is attached and should be
incorporated into the plan set. An electronic version of this can be emailed if
desired.
Number: 85 Created; 10/15/2004
[10/15104] Please provide a couple of cross sections at the neckdown where the
parking is removed both-atthe points of both the expanded and reduced sections.
With the flowline grades remaiiiing.fhe same around the neckdowns, there is a
general concern that the cross slope will steepen through the neckdown or the
crown of the street will rise abruptly.
Number: 88 Created: 10115/2004
[10/15104] Please provide more clarity as to the area on the north side of Pavilion
Lane between the westernmost driveway on the north side of Pavilion and the point
where Pavilion Lane expands. Is sidewalk being shown here?
Number: 89 Created: 10/15/2004
Page 2
NOV-02-2004 TUE 11:25 AN NOLTE ASSOCIATES FAX NO, 9702212415
M
[10/15/04] Shop drawings and structural talcs for the box culvert extension will be
required prior to the issuance of a development construction permit, Specify on the
utility plans that the box culvert design is to comply with 11.5 of LCUASS and
specifically note that the box culvert shall be designed for vehicular loadings of HS-
20 or higher.
Number: 90 Created: 10/15/2004
[l D/15/04] Please provide more detail regarding the wingwalls in how the grading
ties into them, TOW and BOW elevations, etc. The soils report did not appear to
address the extention of the box culvert, has there been evaluation as to how deep
the wingwalls need to be, thickness, etc?
Number: 92 Created: 10/18/2004
[10/18/04] Please see the marked up information in green on the plans, which was
reviewed by the Engineering Design section of Engineering. In general more
questions and concerns regarding the design of the box culvert extension.
Department: 5tormwater Utility Issue Contact: Basil Hamdan
Topic: Details
Number: 82 Created: 10/15/2004
[10/15/041 Please provide a reinTorcement detail for the water quality box outlet
structure.
Topic: Erosion Control
Number: 67 Created: 7/12/2004
[10/121041
Third Review
O,-tober 8, 2004
1. Please schedule a short meeting at the Utilities office with Bob Zakely to
discuss this plan.
[7/12/04]
1, One or more of the previous comments has not been addressed. Please do so.
Topic: Grading Plan
Number: 69 Created: 10/12/2004
[10/12/041 Please provide a construction detail for the proposed retaining wall in the
detention pond. Please keep retaining wall outside of the existing utility easement.
Topic: Landscape Plan
Number: 84 Created: 10/15/2004
[1D/15/04] Please maintain 10 feet of horizontal separation between proposed storm
sewer along JFK (Storm Line C) and the street trees shown on landscape plan.
Page 3
NOV-02-2004 TUE 11:25 AM NOLTE ASSOCIATES FAX NO, 9702212415
wl
m
Ravi l;oH Leme
FE
I
elROPO ED CULVERT
CONLN E TE
B-OX
S TA..-- + 7 E
''VI ELEV = 502E
A. D. —4.02
K = 31.08
7 1 5.0 1 0��-T
-59
87
PROJECT
COMMENT SHEET
City of Fait Collins
Current Planning
DATE: April 20, 2004 TO: Engineering
PROJECT: #6-96N Harmony Centre PUD, Goodwill PDP -
Type II (LUC)
All comments must be received by Ted Shepard no later than the staff
review meeting:
May 12, 2004
Note - PLEASE identify your redlines for future reference
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_Plat _Site _Drainage Report _Other
_Utility _Redline Utility _Landscape
City of Fort Collins
NOV-02-2004 TUE 11:26 AN NOLTE ASSOCIATES
FAX NO. 9702212415 P. 07
PAvi lron Lune
5 a� �l► �
•J I
CN
O
Ln
W
U
m
—EXISTING CONCR
BOX CULVFF T
VI STA = 21 6E
PVI_4Lr V 302E-
A�D. _ —13.63
K — 3440
-- 1._��.0000L VC
NOV-02-2004 TUE 11:26 AN NOLTE ASSOCIATES FAX NO. 9702212415 P. 08
Pax; I i o m LAP%e
Cc;,4t-li he
f-
LY)
Ln
m I -
r-EXIST NG CONCRL\TU
aOX CULVERT \ \
PVI STA - 11-1- 79.17
PVI E-LEV 5027.37
A.D. �---3-80
K —. 32.09
125.0000' VC -- —
NOV-02-2004 TUE 11:25 AN NOLTE ASSOCIATES FAX NO. 9702212415 P. 05
0 0
1 00
Pavi lioh Lane
GA
scale: ,"c ZO.
---Proposed Box
C�Iver�
is+ion9
x Culvert
x+ Project Comments Sheet
S
City of Fort Collins Selected Departments
Date: August 31, 2005
Project:
HARMONY CENTRE PUD, GOODWILL PDP, TYPE 11 AND FINAL PLANS
All comments must be received by Ted Shepard in Current Planning, no later than
the staff review meeting:
August 24, 2005
Note - Please identify your redlines for future reference
Issue Contact: Marc Virata
Topic: Construction Plans
Number: 100 Created: 8/29/2005
[8129/05] On the striping plan for Pavilion Lane please change the right turn stripe at the
intersection to a combined right turn and through movement in order to accommodate the
alignment with the development of Settler's Creek east of the site.
Number: 101 Created: 8/30/2005
[8/30/05] The culvert extension detail should provide bedding material information and
compaction requirements in order to know how the culvert will be seated, as was redlined in
the previous plan set. This should typically be designed by the geotech engineer. Not
knowing the soil conditions underlying the culvert extension, shouldn't a note be added
specifying potential overexcavation until suitable soils are found?
Number: 102 Created: 8/30/2005
[8/30/05] The box culvert sections AI -Al and B1-B1 on sheet DT04 are not specified
anywhere on the actual plan set.
Number: 103 Created: 8/30/2005
[8/30/05] The standard CDOT detail M-601-20 included in the plan set does not have actual
dimensions specified to be specific to this culvert.
Number: 104 Created: 8/31/2005
[8/31/05] Based upon the comments, another formal round of review is not required.
However, before mylars can be submitted, paper copies of the plans are needed for
verification of the previous items being addressed.
i
3!
Date
/ CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat v- Site Drainage Report Other
k Utility >� Redline Utility �L Landscape
Page I
Topic: General
Number: 86 Created: 10/15/2004
[8/26/05] Carried over for reference.
[10/15/041 The City was given a draft copy of the agreement required by the ditch company.
A copy of this is provided for the Developer's reference. As advance notice, the City will be
assigning much of the responsibities to the Developer in the development agreement.
Number: 98 Created: 8/26/2005
[8/26/05] Thanks for the submittal of the offsite document drafts and legal descriptions. The
vacation process of Pavilion Drive will start after completion of the construction of the
realigned roadway.
Number: 99 Created: 8/29/2005
[8/29/05] Please add to the easement dedication document after the first sentence in the
second paragraph that: "it is understood by the undersigned that, by acceptance of this
dedication, the City of Fort Collins will not accept the duty of maintenance of such
easement."
Topic: Utility Plans
Number: 88 Created: 10/15/2004
[8/26/05] Please label the sidewalk width being proposed for this section.
[10/15/04] Please provide more clarity as to the area on the north side of Pavilion Lane
between the westernmost driveway on the north side of Pavilion and the point where
Pavilion Lane expands. Is sidewalk being shown here?
Page 2
FINAL PLAN
REVISION COMMENT
Current Planning
DATE: July 27, 2005
TO: Technical Services
SHEET
PROJECT PLANNER: Ted Shepard
#6-96P Harmony Center PUD, Goodwill PDP - Final Plans
Please return all comments to the project planner no later than the staff
review meeting: M
1 >00'
August 24, 2005
Note --Please identify your redlines for future reference
No Problems
Poblems or Concerns (see below or attached)
I •-ov,��A-e_y �- L_0e_A4_ G4.05E.
Z. lrrz: r
%/v(S D/t/� s Illy-- — /tea/i'� c �gN6c fI S {'9D•ya
r_410ncGvC-o�ui�5 Fi�ti 7—ecla LciTS .
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_Plat _Site _Drainage Report _Other
_Utility _Redline Utility _Landscape City of Fort Covina
I.Aorilem Project Comments Sheet
S
City of Fort Collins Selected Departments
Department: Transportation Planning
Date: May 12, 2004
Project: HARMONY CENTRE PUD, GOODWILL PDP, TYPE II, #6-96N
All comments must be received by Ted Shepard in Current Planning, no later than
the staff review meeting:
No Review Date
Note - Please identify your redlines for future reference
Issue Contact: David Averill
Tor; Construction Plans
Pr. 31 Created: 5/11/2004
[6' t' ;oai i here appears to be tree located in the middle of the ramp that leads from the sidwalk fronting on JFK to the
"plaza" area of the proposed building entrance. See landscape plan for redline.
Number: 32 Created: 5111 /2004
15/11/041 Please provide a sidewalk access ramp aligned to cross JFK to the NE at the northernmost point of this
proposed development. This will facilitate a pedestrian crossing of JFK to those parcels east of JFK that are currently
vac:a;
Number: 38 Created: 5/11 /2004
[5111104] A 4' detached walk will need to be constructed along the edge of the "open space" at the western end of the
property. This walk needs to include a sidewalk ramp for pedestrians to access the main walkway that currently exists
to the west of King Soopers.
Topic: General
Number: 41 Created: 5/12/2004
[51121041 Transportation Planning requests that this development build a sidewalk along the southern edge of the
parcel. This drive aisle does not currenUy have a continuous sidewalk on either its north or south side. A sidewalk on
the southern edge of this project would provide a more safe and direct route for pedestrians who wish to reach the main
walkway to the west of King Soopers from JFK. IF constructed this sidewalk should also have an access ramp to
provide a crossing to the front (west) of King Soopers.
Signature Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other_
Utility Redline Utility Landscape
Page 1
Project Comments Sheet
City of Fort Collins Selected Departments
Date: May 14, 2004
Project: HARMONY CENTRE PUD, GOODWILL PDP, TYPE II, #6-96N
Issue Contact: Marc Virata
Topic: Construction Plans
Number: 28 Created: 5/11/2004
[5/11/04] Please show 150' of existing Pavilion Lane west of the new section of roadway on the plan and profile view of
the construction plan set. Indicate what the existing tangents/horizontal curves are that the plans tie into as well as the
existing flowline profiles.
Number: 29 Created: 5/11/2004
[5111104] Show concrete to the right-of-way line for all new driveways.
Number: 30 Created: 5/11/2004
[5/11/04] Provided the existing Pavilion Lane is shown as commented in #28 and widened as commented in #53, the
level of detail required for this project (prior to a hearing) is considered satisfactory. After a public hearing the following
items will need to be addressed:
- A profile for the centerline of Pavilion Lane is needed.
- Because centerline stationing was not used, please provide cross -sections of the roadway at the start and end point of
all horizontal curves.
- Label additional existing and proposed elevations of Pavilion out to JFK as redlined (and as specified in Figure 7-27 of
LCUASS).
- The southern flowline profile has a grade break just outside of the curb return and exceeds .4%, which is not allowed
in LCUASS 7.4.1.6.3.
- The length of the sag vertical curve on the south flowline profile appears to be counterintuitive with the coinciding
vertical curve on the north flowline profile. With the south vertical curve being on the outside of the horizontal curve,
shouldn't this length of vertical curve be longer? (In general the vertical design will be reviewed in greater detail after
hearing when the additional information is provided).
Number: 33 Created: 5/11/2004
[5111/04] Replace "Director of Engineering" with "City Engineer" in the utility plan approval block. Add'Traffic
Engineer" to the approval block.
Number: 54 Created: 5/14/2004
[5/14/04] Please add a signing and striping plan sheet for bikelane delineation. (The City will stripe bikelanes out to
College Avenue west of the proposed Pavilion Lane extension).
Topic: General
Number: 11 Created: 5/10/2004
[5/10/04] Prior to any agreement towards Current Planning's scheduling of a public hearing for the project, letters of
intent are required to be obtained from all the owners affected by the Pavilion Lane road alignment. This includes
Larimer County Canal Ditch No. 2 and FC Timberline Development LLC for the odd shaped parcel southwest of the
current cul-de-sac. a n the property owne s) directly south and directly west consisting of shopping enters
-.v c
Sig utare Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat ✓ Site Drainage Report Other
✓Utility —� Redline Utility `Landscape
Page I
need to provide letters of intent. The parcel map information shows multiple ownerships for both of these shopping
centers. The property owner(s) to the south will also need to express no objection for the driveway connection onto the
private drive which is on their property.
Number: 12 Created: 5/10/2004
15/10/041 With the area of land on the north side of Pavilion lane remaining as undeveloped, Engineering sees benefit
in not construction the sidewalk running parallel on the north side of Pavilion Lane (as well as any placement of street
tress, which isn't shown as proposed at this time). This may prevent future utility installation conflicts along this area in
the future.
Number: 13 Created: 5/10/2004
[5/10/041 Please use one consistent title for the project on all documents, including the plat. (Do not add "PDP", "FOP"
or any other suffix to the title).
Number: 16 Created: 5/10/2004
[5/10/04] From a process standpoint, it is preferred if the excess right-of-way is vacated after the new road is
constructed, not before. In this manner, a legal description of the right-of-way vacation is required at time of final
compliance with recordation fees collected at the time the right-of-way vacation goes to City Council (again after the
road has been constructed). If the applicant wishes to have the right-of-way vacated prior to the extension of Pavilion
Lane, an access easement will need to be retained at that time and subsequently vacated after the road is constructed.
The offsite right-of-way required to be dedicated for the road to be built must be received at the time of final compliance.
Number: 25 Created: 5/11/2004
15/11/041 Just a comment - the parkway strip between the sidewalk and curb on Pavilion Lane is shown at 13', this is
greater (twice the amount) than what our standards require, but can remain if desired by the applicant. (See Comment
#53, which results in the parkway reduced and roadway widened, but the right-of-way remains the same).
Number: 26 Created: 5/11/2004
[5/11/04) All the radii for the driveways out to Pavilion Lane are required to be a maximum of 16 in accordance with
LCUASS 8.2.9. The plans specify 25' radii in some locations.
Number: 27 Created: 5/11/2004
[51111041 Where the sidewalk is attached along Pavilion lane, it is required to be widened an additional foot from the
detached portion, provided Transportation Planning is comfortable with attaching the sidewalk.
Number. 34 Created: 5/11/2004
[5/11/041 With the undeveloped property to the north likely having to take driveway access to Pavilion Lane directly
across the street from this project to meet driveway separation requirements, wouldn't it be beneficial to build the
driveway cut at this time? Future development of the northern parcel will likely have to pay for street cut penalty fees in
constructing the driveway at that time.
Number: 53 Created: 5/14/2004
(5114/041 The street width of Pavilion Lane proposed needs to be widened to our standard commercial local street
cross section of a 50' roadway width within 72' of right-of-way. This widening should occur past the driveway that
connects to Pavilion through the current cultJe-sac as redlined. It is suggested that the widening occurs somewhat
abruptly to clearly define the parking areas created by the widening (as reclined).
Topic: Landscaping
Number: 24 Created: 5/11/2004
[5/11/04] Correct the scale on the landscaping plan.
Topic: Plat
Number: 14 Created: 5/10/2004
15/10104] The plat language has some outdated language in sections. Please update to the latest version as attached.
This language can be emailed if desired.
Number. 15 Created: 5/10/2004
[5/10/041 Please indicate on the plat the right-of-way to be vacated and dedicated, both onsite and offsite, in order to
accommodate the extension of Pavilion Lane.
Page 2
STAFF PROJECT REVIEW
City of Fort Collins
Goodwill Industries of Denver
Date: May 17, 2004 L . o.:r.
C/o Mr. Shaun Moscrip
Aller — Lingle Architects
712 Whalers Way, Suite B-100 �t-;o �
Fort Collins, CO 80525 rF_� �e>._
Staff has reviewed your submittal for HARMONY CENTRE PUD, GOODWILL PDP,
TYPE II, #6-96N, and we offer the following comments:
ISSUES:
Department: Engineering
Topic: Construction Plans
Issue Contact: Marc Virata
Number: 28 Created: 5/11 /2004
[5/11/04] Please show 150' of existing Pavilion Lane west of the new section of
roadway on the plan and profile view of the construction plan set. Indicate what the
existing tangents/horizontal curves are that the plans tie into as well as the existing
flowline profiles.
We added approximately 80 In. ft. of existing Pavilion Lane information. This
information represents the limits of the survey information that we have
available to us. Refer to Sheet RD01 for the existing tangents/horizontal
curves and the existing flowline profiles.
Number: 29 Created: 5/11 /2004
[5/11/04] Show concrete to the right-of-way line for all new driveways.
t Done.
Number: 30 Created: 5/11 /2004
[5/11/04] Provided the existing Pavilion Lane is shown as commented in #28 and
widened as commented in #53, the level of detail required for this project (prior to a
hearing) is considered satisfactory. After a public hearing the following items will
need to be addressed:
- A profile for the centerline of Pavilion Lane is needed.
- Because centerline stationing was not used, please provide cross -sections of the
roadway at the start and end point of all horizontal curves.
- Label additional existing and proposed elevations of Pavilion out to JFK as redlined
(and as specified in Figure 7-27 of LCUASS).
- The southern flowline profile has a grade break just outside of the curb return and
exceeds .4%, which is not allowed in LCUASS 7.4.1.B.3.
- The length of the sag vertical curve on the south flowline profile appears to be
counterintuitive with the coinciding vertical curve on the north flowline profile. With
the south vertical curve being on the outside of the horizontal curve, shouldn't this
length of vertical curve be longer? (In general the vertical design will be reviewed in
greater detail after hearing when the additional information is provided).
Page 1
Comment acknowledged. Is it necessary to provide a centerline profile? We
provided flowline profiles for the north and south flowlines of Pavilion Lane
and will provide cross -sections of the roadway at the start and end point of all
horizontal curves.
Number: 33 Created: 5/11 /2004
[5/11/04] Replace "Director of Engineering" with "City Engineer" in the utility plan
approval block. Add "Traffic Engineer" to the approval block.
Done.
Number: 54 Created: 5/14/2004
[5/14/04] Please add a signing and striping plan sheet for bikelane delineation.
(The City will stripe bikelanes out to College Avenue west of the proposed Pavilion
Lane extension).
Comment acknowledged. The Signing and Striping Plan will be included with
the final design documents.
Topic: General
Number: 11 Created: 5/10/2004
[5/10/04] Prior to any agreement towards Current Planning's scheduling of a public
hearing for the project, letters of intent are required to be obtained from all the
owners affected by the Pavilion Lane road alignment. This includes Larimer County
Canal Ditch No. 2 and FC Timberline Development LLC for the odd shaped parcel
southwest of the current cul-de-sac. In addition the property owner(s) directly south
and directly west consisting of shopping centers need to provide letters of intent.
The parcel map information shows multiple ownership for both of these shopping
centers. The property owner(s) to the south will also need to express no objection
for the driveway connection onto the private drive which is on their property.
Signed Letters of Intent are being obtained from FC Timberline Development
LLC, GS Pavilion Development LLC, and Larimer County No. 2 Ditch
concerning the new Pavilion Lane align and extension to JFK Parkway as well
as the new access to the King Soopers service drive. These letters will be
submitted prior to the Public Hearing.
Number: 12 Created: 5/10/2004
[5/10/04] With the area of land on the north side of Pavilion Lane remaining as
undeveloped, Engineering sees benefit in not construction the sidewalk running
parallel on the north side of Pavilion Lane (as well as any placement of street trees,
which isn't shown as proposed at this time). This may prevent future utility
installation conflicts along this area in the future.
The sidewalk along the north side of Pavilion Lane is not being installed with
this development.
Number: 13 Created: 5/10/2004
[5/10/04] Please use one consistent title for the project on all documents, including
the plat. (Do not add "PDP", "FDP" or any other suffix to the title).
Page 2
The title for all parts of the project have been coordinated to read:
Goodwill Industries of Denver
JFK Parkway
Fort Collins, Colorado
Number: 16 Created: 5/10/2004
[5/10/04] From a process standpoint, it is preferred if the excess right-of-way is
vacated after the new road is constructed, not before. In this manner, a legal
description of the right-of-way vacation is required at time of final compliance with
recordation fees collected at the time the right-of-way vacation goes to City Council
(again after the road has been constructed). If the applicant wishes to have the
right-of-way vacated prior to the extension of Pavilion Lane, an access easement will
need to be retained at that time and subsequently vacated after the road is
constructed. The offsite right-of-way required to be dedicated for the road to be built
must be received at the time of final compliance.
The excess right-of-way will be vacated after the new road is constructed.
Number: 25 Created: 5/11/2004
(5/11/04] Just a comment - the parkway strip between the sidewalk and curb on
Pavilion Lane is shown at 13', this is greater (twice the amount) than what our
standards require, but can remain if desired by the applicant. (See Comment #53,
which results in the parkway reduced and roadway widened, but the right-of-way
remains the same).
Comment acknowledged.
Number: 26 Created: 5/11/2004
(5/11/04] All the radii for the driveways out to Pavilion Lane are required to be a
maximum of 15' in accordance with LCUASS 8.2.9. The plans specify 25' radii in
some locations.
All radii were revised to 15'.
Number: 27 Created: 5/11/2004
[5/11/04] Where the sidewalk is attached along Pavilion Lane, it is required to be
widened an additional foot from the detached portion, provided Transportation
Planning is comfortable with attaching the sidewalk.
The sidewalk has not been widened by one (1) foot. The proposed walk was
designed to match the width of the existing sidewalk.
Number: 34 Created: 5/11/2004
[5/11/04] With the undeveloped property to the north likely having to take driveway
access to Pavilion Lane directly across the street from this project to meet driveway
separation requirements, wouldn't it be beneficial to build the driveway cut at this
time? Future development of the northern parcel will likely have to pay for street cut
penalty fees in constructing the driveway at that time.
The driveway cut for the undeveloped property to the north has been included
in this project.
Page 3