Loading...
HomeMy WebLinkAboutSIDEHILL THREE - Filed DCP-DEV. CONSTRUCTION PERMIT - 2007-11-27Transportation Development Review Fee Date Received/ Paid �i -- Or9_d City of Fort Collins Total Amount Paid Project Name: s;lc�//F�;.,G r.�i�,�, Project Location. IP 4Wet r� & 7t ��e��"" � nrl�0 Date: Type of Submittal Please indicate the type of application submitted by checking the box preceding the appropriate request(s). Fee snucture amount due ❑ Overall Development Plan (ODP) $500 each _ Final Development Plan (FDP) This fee includes 2 rounds of review $1000 each 7 ❑ Additional round of review $ 500 each ❑ Annexation $20 x _ acres = + $250 = _ I Minor Amendment $250 each _ ❑ Major Amendment $2,500 each _ Re -zone $200 each C Modification to Land Use Code $200 each _ ❑ Wireless Telecommunication Equipment (WTE) $65 each Road Projects _ acres (of roadway) X S250= _ ❑ Vacation of Easement(s) * *" # of vacations _ X $400 = _ D Vacation of Right(s)-of-Way *,• # of vacations_ X.$800= Ll Dedication of Easement(s) and/or Right(s)-of Way *** # of dedications _ X $250 = _ *** This fee does not include the cost of filing fees. Filing fees shall be determined at the time of final document submittal and will be required prior to filing. ❑ Project Development Plan (PDP) or Basic Development Review Project requiring Transportation Services Review and/or utility plan review. This fee includes 3 rounds of review. Detached Single Family $160 per unit _#of units X$160= _ Multifamily or other residential units $115per unit _#of units X$115= _ Commercial, Industrial, Retail, and/or Non residential building square footage $0.25 per square foot _sq IfX$0.25= _ Size of the development (area being platted or if not being platted size of parcel accompanying all development improvements) $250 per acre _ acres X $ 250 = Project fee $2,000 each Total of above amounts If this fee amount exceeds $30,000 then the fee amount shall be adjusted with the following formula: $30,000 + V. (the amount over 30,000 The maximum fee for any residential ONLY project shall be $500 per residential unit. This check should be used to verify the fee amount (does not apply to mixed -use developments). PDP fee shall be the lesser of this amount or the above calculated amount. # of residential units X $500 = Reduction for affordable housing — a copy of the Ciry letter certifying/ authorizing the affordable housing shall be provided with this application. Amount of reduction to be applied Total owed for PDP $ Land Use Information: Total number of single family detached units: Total number of multifamily/other residential units: _ Total number of certified affordable dwelling units (a copy of the letter/ authorization is required): Non residential buitding square footage: sq ft Gross Acreage: acres General Information: Owners Name(s): Street address: City/State/Zip: Telephone: Fax: Applicants/ Consultants Firm Name: Contact: Street address: City/State,'Zip: Telephone: Fax: Certification: By signing this permit I acknowledge that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for Purposes of inspection. Name (please print): O.-_ Signature: G Telephone: ZV'9 —%'P'JF� cc: Christie White, Engineering 6 —(2--v Development Review E gineering m d b Transportation Development Review Fee Date Received/ Paid Project Name: Sidehill Filing 3 Total Amount Paid Project Location: _Block 1, Sideh-- Ftltng 2 'NE corner of Timberline & Katandin Date: 3/13/07 Type of Submittal Please indicate the type of application submitted by checking the box preceding the appropriate requests). C Overall Development Plan (ODP) Fee srructure amount due 5500 each _ ❑ Final Development Plan (FDP) This fee includes 2 rounds of review $1000 each _ ❑ Additional round of review $ 500 each ❑ Annexation $20 x_acres =_+S250 = _ ❑ Minor Amendment $250 each _ ❑ Major Amendment $2,500 each _ ❑ Re -zone $200 each _ ❑ Modification to Land Use Code $200 each _ ❑ Wireless Telecommunication Equipment (WTE) $65 each _ ❑ Road Projects _ acres (of roadway) X $250 = _ ❑ Vacation of Easement(s) ••' # of vacations _ X $400 = _ ❑ Vacation of Right(s).of--Way '•" # of vacations _ X $800 = _ ❑ Dedication of Easement(s) and/or Right(s)-of-Way ••• # of dedications _ X S250 = _ ""• This fee does not include the cost of filing fees. Filing fees shall be determined at the time of final document submittal and will be required prior to filing. X Project Development Plan (PDP) or Basic Development Review Project requiring Transportation Services Review and/or utility plan review. This fee includes 3 rounds of review. Detached Single Family $160 per unit _0 new_ # of units X $160 = 0 Multifamily or other residential units $115 per unit _0_ # of units X $115 = 0 Commercial, Industrial, Retail, and/or Non residential building square footage $0.25 per square foot _0_sq It X $0.25 = Size of the development (area being platted or if not being planed size of parcel accompanying all development improvements) $250 per acre _2.65_ acres X $ 250 = $662.50 Project fee $2,000 each Total of above amounts $2,662.50 If this fee amount exceeds $30,000 then the fee amount shall be adjusted with the following formula: $30,000 + /, (the amount over 30,000 The maximum fee for any residential ONLY project shall be $500 per residential unit. This check should be used to verify the fee amount (does not apply to mixed -use developments). PDP fee shall be the lesser of this amount or the above calculated amount. _19_ # of residential units X $500 = _$9,500 Reduction for affordable housing — a copy of the City letter certifying/ authorizing the affordable housing shall be provided with this application. Amount of reduction to be applied Total owed for PDP $2,662.50 Land Use Information: Total number of single family detached units: 19 (no change) Total number of multifamily/other residential units: Total number of certified affordable dwelling units (a copy of the letter/ authorization is required): _0_ Non residential building square footage: _N/A_ sq ft Gross Acreage: _2.65 acres General Information: Owners Name(s): _Postle Development Company Street address: _2919 Valmont Rd, Suite 209 City/State/Zip: _Boulder, CO 80301 Telephone:_303-443-9644 Fax: Applicants/ Consultants Firm Name: _JR Engineering Contact: _Mike Malvey. Street address: _2620 E Prospect Rd, Suite 190 City/State/ Zip: _Fort Collins, CO 80525 Telephone:_970-491-9888_ Fax:_970-491-9984 Certification: By signing this permit I acknowledge that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby Permit City officials to enter upon the property for purposes of inspection. Name (ple t): l �� Signature: Telephone: 4 43 -104 cc: Christie White, Engineering Development Review Engineering ✓� Transportation Development Review Fee Date Received/ PaidlJc'7 �_•.�.rt,�,, Total Amount Paid T A-7 e -7 Citvof Fort Collins Project Name: t ij {"h PAIN wwnffiw� Project Location: Date: Type of Submittal C' 7 01 C S C! Please indicate the type of application submitted by checking the box Land Use Information: preceding the appropriate request(s). Total number of single family detached units: �. Fee structure amount due ❑ Overall Development Plan (ODP) $500 each Total number of multifamily/other residential units: (4—. _ ❑ Final Development Plan (FDP) Total number of certified affordable dwelling units (a copy This fee includes 2 rounds of review $]000 each of the letter/ authorization is required): '( ❑ Additional round of review $ 500 each Nonresidential building square f iotage:4 , , sq R Annexation $20 x acres _ + $250 _= = Gross Acreage: bti acres _ ❑ Minor Amendment $250 each General Information: �( Major Amendment $2,500 each c4 �_ Owners Name(s): C1 Re -zone $200 each Street address: /6-11^- ca,4,21 s „'.ae, 500 _ ❑ Modification to Land Use Code $200 each ❑ Wireless Telecommunication Equipment (WTE) $65 each _ ❑ Road Projects _ acres (of roadway) X $250 = _ City/State/Zip: t f t I P d Q K r C G Vacation of Easement(s) "• # of vacations _ X $400 = ❑ Vacation of Right(s)-of-Way«•• #ofvacations _X$800= Telephone:(/e3)�E�,Fax:(YL'3� �d-r3.7 :J ❑ Dedication of Easement(s) and/or Right(s)-of--Way `•* # of dedications _ X $250 = Applicants/ Consultants Firm Name: «•` This fee does not include the cost of filing fees. Filing fees shall be determined at the time of final document submittal and will be required prior r Contact: to filing. Street address: ❑ Project Development Plan (PDP) or Basic Development Review Project requiring Transportation Services Review and/or utility plan review. This fee includes 3 rounds of review. Detached Single Family $160 per unit units XS160= pp City/State/ Zip: r d i _#of Multifamily or other residential units $115 per unit _ # ofunits X S115 = Telephone: Er'76) q-&-8454 Fax:N 76)y-'I2 A 459 Commercial, Industrial, Retail, and/or Non residential Certification: building square footage $0.25 per square foot _sq ft X $0.25 = By signing this permit I acknowledge that I am acting — Size of the development (area being platted or if not being with the knowledge, consent, and authority of the platted size of parcel accompanying all development owners of the property (including all owners having improvements) $250 per acre acres X $ 250 = legal or equitable interest in the real roe as P P rtY, — Project fee $2,000 each uma defined in Section 1-2 of the City Code; and including common areas legally connected to or Total of above amounts associated with the property which is the subject of If this fee amount exceeds $30,000 then the fee amount shall be adjusted with this application) without whose consent and authority the following formula: the requested action could not lawfully be $30,000 + /, (the amount over 30,000 ) = accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for The maximum fee for any residential ONLY project shall be $500 per purposes of inspection. residential unit. This check should be used to verify the fee amount (does not apply to mixed -use developments). PDP fee shall be the lesser of this amount Name (please or the above calculated amount. Signature: — # of residential units X $500 = Telephone: Reduction for affordable housing- a copy of the City letter certifying/ authorizing the affordable housing shall be provided with this application. Amount of reduction to be applied cc: CIVistie White, Engineering VA'evelopment Review Engineering Total owed for PDP $