City of Fort Collins
9/13/2007 Date:
Plymouth Congregational Church phase one basic development
review
SELECTION CRITERIA: Status = All
ISSUES:
Department: Current Planning Issue Contact: Anne Aspen
Topic: Architectural Plans
Number:14 Created:1/30/2007 Resolved
[1/30/071 In the future, please submit plans at 24"x36" folded properly.
Number:15 Created:1/30/2007 Resolved
[1/30/07] You did a great job of presenting the proposed architectural elevations in a clear,
easy to understand manner. You get a gold star for your efforts!! And the design looks
good to boot!
Topic: General
Number:8 Created:1/30/2007 Resolved
[1/30/07] Minor comments on redlines. Please return redlines on resubmittal.
Number: 50
[4/19/07]bvb vghjukgilh
Created:4/19/2007 Resolved
Number:51 Created:4/19/2007 Resolved
[4/19/071 Aside from a couple of carried comments on the Lighting Plan, you have
addressed all of my concerns very well. The architecture, site and landscape plans all look
really great and the project will really enhance the church as well as the surrounding area.
Best of luck!
Topic: Landscape Plan
Number:20 Created:1/30/2007 Resolved
[1/30/07] The question I have about the grass pavers is not a deal breaker but I'd
appreciate more information on how well this product does in and climates like ours? Is
there any precedent along the Front Range for example? I appreciate that it is specified for
parking that is rarely used and that it will allow runoff to soak in. If successful, this could set
a good precedent for Fort Collins, assuming other departments like PFA don't have issues
with it. Thanks for proposing it.
Topic: Lighting Plan
Number:16 Created:1/30/2007 Resolved
[1/30/07] In the future, please submit plans at 24"06" folded properly.
Number:17 Created:1/30/2007 Resolved
Page 1
[1/30/07] The northeast corner of the site appears to be a natural drop off place. Is there
existing lighting? If so, please call out with a note on the lighting plan. I'll also need to see a
snapshot of the existing lighting to determine whether it meets the code. It may be
necessary to change out existing fixtures if they do not meet our lighting standards (fully
shielded, down directional.)
Number:18 Created:1/30/2007 Resolved
[4/19/07] Not shown on plan --nor is light on front fagade of building. Please add cutsheet(s)
to lighting plan. Feel free to email cutsheet to me first for review. aaspen@fcgov.com
[1/30/07] Do you intend to light the new sign or the relocated bell tower on Lake? If
anything other than an internally lit sign, I need to review that lighting as well. Keep in mind
that we do not allow exterior uplighting.
Number:19 Created:1/30/2007 Resolved
[4/19107] 1 know we talked about this on the phone but I don't see any note about it on the
plans or in the comment letter response.
[1/30/071 Even though they meet our standards for cutoff, the proposed pole fixtures
adjacent to the east property line may need to have house side shields affixed to them to
prevent glare on the neighboring residence.
Number:58 Created:4/24/2007 Resolved
[4/24/07] 1 received a revised lighting plan showing the uplight fixtures this morning. There
are now three uplights showing including one at the new sign on Lake, which the lighting
consultant had previously told me would not be lit. Lake Street is more residential in
character and therefore, the light needs to be a residential -scale spot light with a shield on it.
As I have mentioned previously, the fixture that uplights the tree in front is not acceptable.
The fixture on the front wall sign is acceptable since for basic development review, the
project must comply with the standards to the extent reasonably feasible, but the fixture
must be shielded, either with a fabricated shield or with a fixture that is designed to shield
uplight. No shield is shown on the cutsheet. I also have no information about the fixture
other than a photograph and a mounting detail. As I told the lighting consultant on the
phone, the uplights need not show on the photometric plot because they shine up not down,
but the information should still be included in the luminaire schedule.
Number:59 Created:4/24/2007 Resolved
[4/24/07]
Topic: Site Plan
Number:9 Created:1/30/2007 Resolved
[1/30/07] Under Land Use Statistics Parking analysis #2 please change "Provided" to "Total
Provided" and call out subcategories for number of asphalt spaces and number of grass
paver spaces.
Number:10 Created:1/30/2007 Resolved
[1/30/07] I'd like more info, probably in the form of a note on the site plan about the edge
treatments proposed for the grass paver section of the parking lot. I have some concern
about the grass paver lot safety. If the play area abuts it and the parking area and
playground are not clearly defined, there could be conflicts between kids who coopt the
parking as extra play area and cars who come to use the lot irregularly. Have you thought
about this?
Page 2
Number:11 Created:1/30/2007 Resolved
[1/30/07] Please show all exterior doors on plans.
Number:12 Created:1/30/2007 Resolved
[1/30/07] Please provide more information about the fencing. It is unclear how tall the
fences are, what materials are used (I'm assuming wood) and how the detail works (a 2x6
cap?) Fenced required for screening are required to be 6 feet tall. It may be possible to
make an exception if the windrow to the west is dense, but I'd need to make a site visit to
determine that.
Number:13 Created:1/30/2007 Resolved
[1/30/07] 1 think the ptoperties to the east of the church are planning to redevelop in the
near future though I do not have definitive information about that. If they do though, it would
be good to have a detached sidewalk connection to the east in place. You need to contact
David Averill to discuss this. He may want to see a detached sidewalk stubbed to the east
property line with a temporary Type III barricade.
Department: Engineering Issue Contact: Susan Joy
Topic: General
Number:21 Created:2/1/2007 Resolved
[2/1/07] Per the conceptual review on 10118/04, additional row and utility easements are
required for both Prospect and Lake Street. Prospect is considered a constrained arterial
with a total row requirement of 102'. This project is responsible for dedicating half of that.
Currently, our records indicate a total of 60' of row exists so this project would need to
dedicate an additional 21' of row plus a 15' utility easement.
Lake is considered a minor arterial with a total row requirement of 76' plus a 9' utility
easement. Our records show 60' of row exists, so this project must dedicate an additional 8'
of row plus a 9' utility easement.
This will impact the proposed detention ponds as they will not be allowed in the public row or
utility easement. It may be possible to run the ponds down the east side of the property to
make up for the lost area but it will require the removal of several parking spaces.
This will also impact the parking setbacks as they need to be measured from the ultimate
row.
Number:22 Created:2/1/2007 Resolved
[4/24/07] The scannability is still an issue. Please see me or Tech Services for suggestions
to help correct this problem. Basically there is too much overlapped labeling and too much
shading. The various pavement types could come off and a separate bid sheet could be
created to clarify that end while at the same time keeping the approved plan set free of the
scanning issues and only showing what will be built. We do not allow "alternatives" to show
up on the plan sets... since we have no requirements to show different pavement types
within your own parking lot, I would highly encourage you to just take that information off.
Let me know what you think.
[2/1/07] All plan sets: Please refer to Appendix E6 for all scanning requirements and bring
the plans up to standard.
Number: 40
Created:2/1/2007 Resolved
Page 3
[2/1/07] Please show existing features within 150' of the project limits. At least as far as the
neighboring driveways. Need to show how your sidewalk ties into the existing.
Number:41 Created:2/1/2007 Resolved
[2/1/07] Slopes cannot exceed 4:1.
Number:63 Created:4/24/2007 Resolved
[4/24/07] The project title needs to match on the plat, site, landscape and utility plan sets.
Number:71 Created:4/25/2007 Resolved
[4/25107] Please remove all labeling referring to "preliminary" or not for construction prior to
running the mylars. Thanks!
Topic: L1
Number:60 Created:4/24/2007 Resolved
(4/24/07] Title the plan the same as the Utility Plan.
Topic: L2
Number:61 Created:4/24/2007 Resolved
[4124/07] Remove Phase One from the project title or add that to all of the other plan sets.
Number:62 Created:4/24/2007 Resolved
[4/24107] Please dimension all parking stalls. Can do "typical" if all are the same. Please
dimension the drive aisles.
Topic: Plat
Number:23 Created:2/1/2007 Resolved
[2/1/07] The plat language shown on our website is an older version. Please email me at
sjoy@fcgov.com and I'll send you the current language. There aren't a LOT of changes, just
minor ones so don't worry.
Number:24 Created:2/1/2007 Resolved
[2/1/07] See redlines and comments under other sections for those that will effect the plat
as well.
Number:69 Created:4/24/2007 Resolved
[4/24/07] Please send me a plat as soon as you can so that I can review it real quick. I did
not receive one with this submittal. Sorry!! I do need it to compare to the other plan sets
before I give back the redlines though.
Topic: Utility
Number:64 Created:4/24/2007 Resolved
[4/24/07] The plans have some scanning issues. Please see comments under General.
highlighted a few areas as examples but please feel free to see me or JR in Tech Services if
you have any questions.
Number:65 Created:4/24/2007 Resolved
[4/24/07] Please refer to the detail and sheet number for all sidewalk chases. Use detail
D10 or D11 from stormwater, whichever is appropriate. Label the onsite sidewalk chase
detail as "on site" so that it is not used in the public row.
Page 4
Number:68 Created:4/24/2007 Resolved
[4/24/07] See redlines for other comments.
Topic: Utility - Cover Sheet
Number:25 Created:2/1/2007 Resolved
[211/07] Remove the word "Final" from "Utility Plans for..."
Number:26 Created:2/1/2007 Resolved
[2/1/07] Remove the word "Concregational" from the project title so that it matches the other
plan sets.
Topic: Utility - Detail Sheet
Number:67 Created:4/24/2007 Resolved
[4/24/07] Please remove the old access ramp detail and replace it with the new one. I can
email it to you - send me a quick email to sjoy@fcgov.com and I'll shoot it over. Thanks!
Topic: Utility - General
Number:34 Created:2/1/2007 Resolved
[2/1/07] Please provide the signature block on all sheets, lower right hand corner.
Number:38 Created:2/1/2007 Resolved
[2/1/07] Please show, label and dimension all row & easements (both existing and
proposed).
Topic: Utility - Grading
Number:32 Created:2/1/2007 Resolved
[2/1/07] Please remove all landscaping.
Number:33 Created:2/1/2007 Resolved
[2/1/07] It's hard to tell... but is there offsite grading proposed along the east side? If so, we
will need slope easements from the neighboring property owner (Final Compliance). To get
to hearing, all we'll need is a letter of intent.
Number:35 Created:2/1/2007 Resolved
[2/1/07] Both driveways must be designed and constructed in accordance with detail 707.
Please place the HP at the ultimate row. Driveways must be concrete to the PL.
Number:36 Created:2/1/2007 Resolved
[2/1/07] Please extend existing grading a minimum of 50' offsite.
Number:37 Created:2/1/2007 Resolved
[4/24/07] These notes are provided by stormwater and they need to show up either on the
Grading sheet, Erosion Control sheet or the General Notes sheet.
[2/1/07] Please provide revegetation methods and specific notes.
Number:70 Created:4/25/2007 Resolved
[4125/07] Are you sure we're not going over the 750sf "rule".... it seems like we're picking up
some drainage from the parking stalls to the north a little bit. I could be wrong
though... could you check that and let me know? Thanks!!!
Page 5
Topic: Utility - Horizontal Control
Number:27 Created:2/1/2007 Resolved
[2/1/07] Please show, dim and label all row, utility easements, etc both "proposed" and
"existing". Show the property line on all sheets.
Number:28 Created:2/1/2007 Resolved
[2/1107] Please dimension all sidewalks and label as existing or proposed.
Number:29 Created:2/112007 Resolved
[2/1/07] Couple things with the existing sidewalk on Lake Street... if the existing sidewalk is
in good shape and can stay, than the 4' addition is fine. BUT, if it's cracked and needs
replacement anyway, then we'll want it detached in the ultimate location. Since the snow is
hiding most of the sidewalk now, I can't go out and check but I will try to get out there next
week when the weather is better. We might have to leave this up the air for a couple of
weeks until enough of the snow melts to tell.
Topic: Utility - Overall Utility
Number:30 Created:2/1/2007 Resolved
[2/1/07] Please show where the existing gas and electric lines are along Prospect and Lake
Streets.
Number:31 Created:2/1/2007 Resolved
[2/1/07] Remove all contours and landscaping for legibility.
Number:39 Created:2/1/2007 Resolved
[4/24/07] Please label curb type (not shown on the horizontal control sheet per response
letter). You can just add VC to the curb and gutter lineweight in the legend if you like.
[2/1/07] Label curb type.
Number:66 Created:4/24/2007 Resolved
[4/24/07] The EA and UE easement is labeled in such a way that it turns into just an EA but
there is no lineweight showing where the UE ends. Please clarify.
Department: Forestry Issue Contact: Tim Buchanan
Topic: forestry
Number:54 Created:4/23/2007 Resolved
[4/23/07] Tree mitigation has been addressed on the landscape plan.
Department: Light & Power Issue Contact: Bruce Vogel
Topic: Light and Power
Number:6 Created:1/30/2007 Resolved
[1/30/071 If the church will require additional electrical load, they will be responsible for any
additional service needs, including building site charges, additional entrance capacity
charges, and possible transformer change -out costs.
Number:7 Created:1/30/2007 Resolved
[1/30/07) The secondary service for the existing building runs under the new chapel
addition. This service will need to be relocated at the owners expense.
Page 6
iz` -
Selected Issues Report
Citvat Fort Collie _
3/7/2008 Date:
Plymouth Congregational Church phase one basic development
review
SELECTION CRITERIA: Status = All
ISSUES:
Department: Engineering Issue Contact: Susan Joy
Topic: Utility- Horizontal Control
Number:27 Created:2/1/2007 Resolved
[2/1/07] Please show, dim and label all row, utility easements, etc both "proposed" and
"existing". Show the property line on all sheets.
Number:28 Created:2/1/2007 Resolved
[2/1/07] Please dimension all sidewalks and label as existing or proposed.
Number:29 07 Resolved
22/1/0
Created:
[2/1/07] Couple things with the existing sidewalk on Lake St: 2/1/ 0 the existing sidewalk is
in good shape and can stay, than the 4' addition is fine. BUT, if it's cracked and needs
replacement anyway, then we'll want it detached in the ultimate location. Since the snow is
hiding most of the sidewalk now, I can't go out and check but I will try to get out there next
week when the weather is better. We might have to leave this up the air for a couple of
weeks until enough of the snow melts to tell.
Topic: Utility - Overall Utility
Number:30 Created:2/1/2007 Resolved
Streets. 1/071 Please show where the existing gas and electric lines are along Prospect and Lake
Streets.
Number:31 Created:2/1/2007 Resolved
[2/1/07] Remove all contours and landscaping for legibility.
Number:39 Created:2/1/2007 Resolved
[4/24/07] Please label curb type (not shown on the horizontal control sheet per response
letter). You can just add VC to the curb and gutter lineweight in the legend if you like.
[2/1/07] Label curb type.
Number:66 Created:4/24/2007 Resolved
[4/24/07] The EA and UE easement is labeled in such a way that it turns into just an EA but
there is no lineweight showing where the UE ends. Please clarify.
Department: Transportation Planning Issue Contact: David Averill
Topic: Stormwater
Number:43 Created:2/16/2007 Resolved
[2/16/07] All of my comments from conceptual have been addressed. Thanks.
Page 1
iz` -
Selected Issues Report
Citvat Fort Collie _
3/7/2008 Date:
Plymouth Congregational Church phase one basic development
review
SELECTION CRITERIA: Status = All
ISSUES:
Department: Engineering Issue Contact: Susan Joy
Topic: Utility- Horizontal Control
Number:27 Created:2/1/2007 Resolved
[2/1/07] Please show, dim and label all row, utility easements, etc both "proposed" and
"existing". Show the property line on all sheets.
Number:28 Created:2/1/2007 Resolved
[2/1/07] Please dimension all sidewalks and label as existing or proposed.
Number:29 07 Resolved
22/1/0
Created:
[2/1/07] Couple things with the existing sidewalk on Lake St: 2/1/ 0 the existing sidewalk is
in good shape and can stay, than the 4' addition is fine. BUT, if it's cracked and needs
replacement anyway, then we'll want it detached in the ultimate location. Since the snow is
hiding most of the sidewalk now, I can't go out and check but I will try to get out there next
week when the weather is better. We might have to leave this up the air for a couple of
weeks until enough of the snow melts to tell.
Topic: Utility - Overall Utility
Number:30 Created:2/1/2007 Resolved
Streets. 1/071 Please show where the existing gas and electric lines are along Prospect and Lake
Streets.
Number:31 Created:2/1/2007 Resolved
[2/1/07] Remove all contours and landscaping for legibility.
Number:39 Created:2/1/2007 Resolved
[4/24/07] Please label curb type (not shown on the horizontal control sheet per response
letter). You can just add VC to the curb and gutter lineweight in the legend if you like.
[2/1/07] Label curb type.
Number:66 Created:4/24/2007 Resolved
[4/24/07] The EA and UE easement is labeled in such a way that it turns into just an EA but
there is no lineweight showing where the UE ends. Please clarify.
Department: Transportation Planning Issue Contact: David Averill
Topic: Stormwater
Number:43 Created:2/16/2007 Resolved
[2/16/07] All of my comments from conceptual have been addressed. Thanks.
Page 1