Loading...
HomeMy WebLinkAboutCARGILL RESEARCH SECONDARY USE BUILDING 2545 EAST DRAKE ROAD CANOLA OILS RESEARCH - Filed DCP-DEV. CONSTRUCTION PERMIT - 2007-11-20City of Fort Collins Transportation Services Engineering Department DEVELOPMENT CONSTRUCTION PERMIT Permit Number: 627—M Issuance Date: Project Name: Cargill Secondary Use Building Project A.K.A.: Project Location: 2540 E Drake Rd (north side of Drake east of Sidehill) Permittee: Mark Deleho City and developer contacts: See attached Exhibit "A "for names and phone numbers of all contact persons for this project. Fees: Permit Application Fee (paid at the time of application) $ 400 00 Construction Inspection Fee (paid prior to issuance of this permit) $ 1.620 00 Total $ 2,020.00 Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $ 32,720.00 Form of security deposited with the City: PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the constructed public improvements. (All references above to the terms "Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.) 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. 2N] North Lotlege Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605 • FAX (970) 221-6578 www.fcgov.com Development Construction Permit, Page 2/6 3. Construction time restrictions: 4. The applicant understands that additional permits maybe required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the permit fee paid for this permit, whereupon the applicant must re -apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29- 678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the Development Agreement does not specify times for completion of public improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit. S. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City; (2) punch list items from the final inspection are completed and accepted by the City; and (3) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans; and the "as -constructed" plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. 10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any Development Construction Permit, Page 3/6 planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP's) that can be installed prior to construction must be in place and inspected by the City Erosion Control Inspector before any land disturbing activitybegins. 11. No work (including grading) shall be started in State Highway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: Permittee's acknowledgment signature: By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditions so stated in this permit. Applicant/Project Manager' s Signature: l Z� Date: Approval for issuance: City Engineer Approva� [9 Date: (Permit Issuance Date) Development Construction Permit, Page 4/6 EXHIBIT `°A" DEVELOPMENT PROJECT CONTACT PERSONS Project Name: Project A.K.A.: City Staff Contact Persons: Name, address and numbers Development Engineer: Susan Joy, 281 N. College Ave., Fort Collins, CO 80521 Office 970-221-6605 Fax 970-221-6378 Email: sLoy(a fc ov com Construction Inspector: Joe Crabill, 281 N. College Ave., Fort Collins, CO 80521 Office 970-221-6605 Cell 970-222-1134 Email: Lcrabill<cy1`cgov com Current Planner: Peter Barnes, 281 N. College Ave., Fort Collins, CO 80521 Office 970-416-2355 Fax 970-416-2020 Email: pbarnes@1cgov.com Fax 970-221-6378 Water Utilities Engineer: Erosion Control Inspector: Bob Zakely, 700 Wood Street, Fort Collins, CO 80521 Office 970-224-6063 Fax 970-221-6619 Email: bzakelvCa�fceov com Natural Resources: Dana Leavitt, 281 N. College Ave., Fort Collins, CO 80521 Office 970-224-6143 Fax 970-416-2020 Email: dleavittLc>fcgov com Traffic Operations: Street Closures: Syl Mireles, 626 Linden Street, Fort Collins, CO 80521 Office 970-221-6815 Fax 970-6282 Email: smireles(cc)fceov com Development Construction Permit, Page 5/6 Forestry: Ralph Zentz, 215 N. Mason, Fort Collins, CO 80521 Office 970-224-6302 Fax 970-221-6586 Email: rzentz(d%fcgov.com Light and Power: Doug Martine, 700 Wood Street, Fort Collins, CO 80521 Office 970-224-6152 Fax 970-221-6619 Email: dmartine cufce'ov com Developer' Contact Persons: Project Manager: Steve Stadelmaier Cargill hie 2540 E Drake Rd Fort Collins, CO 80525 Office 970-482-8818 x323 Cell 970-219-2462 Fax 970-482-3870 Steve stadelmaier@cargill.co Developer: Steve Stadelmaier Cargill Inc 2540 E Drake Rd Fort Collins, CO 80525 Office 970-482-8818 x323 Cell 970-219-2462 Fax 970-482-3870 Steve stadelhnaierLa)cargill com Owner(s): Cargill Inc PO Box 9300 Minneapolis, MN 55440 Office 1-800-cargill Project Engineer: Jade Miller DMW Civil Engineers, Inc 1435 W 29`h St Loveland, CO 80538 Office 970-461-2661 Fax number: 970-461-2665 jade @dmwcivilenyineers com Development Construction Permit, Page 6/6 Architect Allen Curtis Allen Curtis Architect 3109 S Taft Hill Road Fort Collins, CO 80526 Office 970-407-7290 Cell970-217-3708 Fax 970-407-7290 General Contractor: Mark Delehoy Delehoy Construction Inc 3109 S Taft Hill Rd Fort Collins, CO 80538 Office 970-226-1802 Fax number: 970-226-1802 or All Other Contractors: W W H W H Q ui W F- O U O Q M W P FZ� Q a F W O Ix a z O U W yW zLL L- D W LY O ap W K Wa u m LY a W F� m S0S080 8808885888 O O N N p O pp pp C O to*O O O LO yWGeW NfW t091/)N W�f69�NITm 40N coy p W 08 NFU Um 0 Nfol. fol. 8888888 W NNWO �O 00000 P) NN HW Wf�I�Of�OM LmdfN7 69W Vf W�(9M ViM OSOSSS 8880880088 N O O O'„ H N QNO f09 $ S N H O W fD 8 S �� 69 y h N � f7 (VV N .- 69 69 w F 000000 0808088880 e �w to a�wwOD 044 > a w O a� °a Co$ �- N O O O Q Q O N O m O n r Li li >- }UU LLLL: LL: U UUUUUU J J U U 6 6 J J JM 6 0 0 0 Q 60 Lo x 088888 0 0 6 6 0 0 W N W N M e9 N S O O N N �T O OO V � O ' 0 0 696969 M"69 0000000 N 609 609 � N 69 Oy 0000009 wwwwwww 0000000 (A )-LL Li Li}} JtOJJJdjUj W m O z J y z W f W Ir a f H K IL x w O x G w 0 J U z W m 0 O W W 2 J J z z O . 0O Uz_ a° yz zm w U LLL z0 U W as w� LY � w lL a� f F �o >w x IL F- a_ No Text 1111111110 11101 monsoon son Emmons on @10son Inc 11101510 mom soon moo n 01111111 loss on loss on Bonn No ■on so loss on on NINE mossommosso so mossommons I monsoon on, mossommon I Eli Im. on �mmon on: F1