' --s City of Fort Collins COMMENT SHEET
Current Planning
DATE: 18 September 1995 DEPARTMENT:,,
#22-84FICountry Club Corners, 3rd Fig, Lots I & 3l
PROJECT: Total Petroleum Convenience Store: Final
PLANNER: Mike Ludwig
All comments must be received by: Friday, 29 September
❑ No Problems
❑Problems or Concerns (see below)
SPe A,�,4.:-44
Date: /0 Signature:
CHECK IF YOU WISH TO RECEIVE
COPIES OF REVISIONS:
Y
❑
P 6AT
❑
SITE
❑
LANDSCAPE
❑
UTILITY
COMMUNITY PLANNING and
ENVIRONMENTAL SERVICES... 281 NORTH COLLEGE, P.O.BOX 580 FORT COLLINS, COLORADO 80522-0580 (303)221-6750
CURRENT PLANNING DEPARTMENT
City of Fort Collins
Current Planning
DATE: 2-7-96
PROJECT
COMMENT SHEET
DEPT.: SW W/WW ENGR' G
PROJECT: Country Club Corners 3rd. Filing, Lots 1 & 3 -
Total Petroleum
PLANNER: Mike Ludwig
All comments must be received by: 2-28-96
0 No Problems
❑ Problems or Concerns (see below or attached)
Please refer to engineering plans for minor revisions. Stormwater will retain drainage
reports for final approval, as no written revisions are necessary. Mylars may be sent for
final review at any time.
V
/ �' - � & -
Date- ' - C Signature:
� �� ��
CHECK IF YOU WISH TO RECEIVE ❑ PLAT w : GUa� 5tynkrj
COPIES OF REVISIONS ❑ SITE
❑ LANDSCAPE R � J
0 UTILITY
PROJECT COMMENT SHEET -ENGINEERING 10-3-95
PROJECT: Country Club Corners, 3rd. Filing, Lots 1 & 3 / Total Petroleum
Convenience Store
COMMENTS
Need to submit a traffic study 9- A sa,Ls nePort4- .
Site Plan
1. Remove setback delineations and notations. P.U.D. supersedes existing
zoning setback requirements.
2. Handicapped parking space location does not agree with other plans.
Utility Plans,
Sheet 2 & 4:
1. Define or remove dashed line drawn along the North and West
property line.
2. See comment 2 under Site Plan.
3. Provide details of the entrances (driveway entrances).
4. What is happening to the median in the access road ?
Sheet 5:
1. What is the need for the intersection detail ?
Hazardous Material Impact Analysis
Page 1, first sub -heading, 3rd. paragraph:
1. Please provide documentation from Burger King stating their knowledge
and acceptance of this projects fuel supply tanker trucks coming through
their access lane.
Commv� v Planning and Environmental rvices
Current Planning
Citv of Fort Collins
October 13, 1995
Wickham Gustafson, Architect
1730 S. College Avenue
Suite 202
Fort Collins, CO 80525
Dear Wickham,
Staff has reviewed your documents for the Country.Club.Gors P.U.D., 3xd ldng,l.ots 1, and
3 (Total Petroleum) Preliminary and Final, that were submitted on September 18, 19- and
would like to offer the following comments:
1. The Light and Power Utility Department offers the following comments:
a. The applicant needs to contact Doug Martine of the Light and Power Utility
Department at 221-6700 to discuss electric power usage for this development.
b. The proposed electrical transformer location appears to be over the sewer service.
If this is the case, the electric transformer or sewer service locations will need to be
adjusted.
2. The Poudre Fire Authority stated that a fire hydrant must be located within 350' of the
commercial building capable of providing 1,500 g.p.m. with 20 p.s.i. residual pressure.
The Building Inspections Department offers the following comments:
a. The site shall be accessible to persons with disabilities in accordance with Uniform
Building Code Section 3103 and UBC Appendix Section 3106. Provide designated
and marked accessible routes between building and the public way and accessible
parking and buildings. Provide parking and signs per Appendix Section 3107. All
required exits and all building entrances located within six inches of grade must be
accessible to a person in a wheelchair and must be connected to the public way (public
sidewalk) by an "accessible route of travel" complying with the American National
Standards Institute publication Accessible and Usable Buildings and Facilities.
Running slopes on accessible routes shall no exceed 1:20 with cross slopes not
exceeding 1:48. Accessible parking and access aisles shall comply with the above
referenced standards with slopes not exceeding 1:48 in any direction. Please show
connections to the public sidewalk for all entrances and exits.
�� �. .-J', "`i '" } E ?i 52'J `} it . �a, i� 22
t� �. ��r Collins, (_ �'�., (�;� __1 big;
1-( -ti • rDD (L)70) 21,�t-6002
b. Approval from the Larimer County Health Department is required for all food service
establishments and the convenience store at the time of building permit submittal.
Please; contact Jim Devore at (970) 498-6775 for requirements.
C. A sand and oil interceptor is required at the car wash. Please contact Mark Taylor at
the City Water and Wastewater Utility at 221-6681 for requirements.
4. The Zoning Department offers the following comments:
a. Please: revise Landscape Plan note 11 to state: "All landscaping shall be installed or
secured with an irrevocable letter of credit, performance bond, or escrow account for
125%, of the valuation of the materials and installation prior to the issuance of a
Certificate of Occupancy."
b. Please clearly define the building envelope for all buildings and show setback
dimensions. The plan shows a 50' building setback line yet part of the convenience
store building, the canopy and two of the gas pumps encroach into this 50' setback
(See Planning comments regarding building placement and orientation).
C. The data indicated 19 standard parking spaces, but 3 of them are 8'/z' wide (standard
is 9') and should be labeled "employee parking". Handicap parking spaces are 8' wide
with a 4' wide access aisle per space, not 16' wide as shown on the Site Plan.
The Engineering Department offers the following comments:
The applicant must submit a traffic study and a soils report.
b. Planned Unit Developments allow variances to setback distances required by
underlying zoning district designations. Please remove the 50' setback delineations
and notations from the Site Plan.
C. The handicap parking spaces designated on the Site Plan do no correspond with their
locations on other plans. Please coordinate these locations on all plans.
d. On Sheets 2 and 4 of the Utility Plans:
i. Define or remove dashed line drawn along the north and west property he.
ii. See Comment b.
iii. Provide details of the driveway entrances.
iv. What is happening to the median in the access road?
e. What is the need for the intersection detail on Sheet 5 of the Utility Plan?
f. On Page 1, first sub -heading, 3rd paragraph of the Hazardous Materials Impact
Analysis, please provide documentation from Burger King stating their knowledge
and acceptance of this projects fuel supply tanker trucks coming through their access
lane. In the future, the Burger King Access from N. College will be limited to right -in
and night -out only. Staff is concerned that the design of this access will not
accommodate fuel tankers. Staff suggests that fuel tankers use the proposed entrance
from Willox Lane.
6. The Water and Wastewater Utility offers the following comments:
Please: add a Planting Note 24 to the Landscape Plan which states: "A 10' separation
distance for trees and 4' separation distance for shrubs must be provided from all
water and sanitary sewer services." There may be conflicts with the water service to
the car -wash facility.
b. Staff suggests that the underground product tanks be moved to the west 10 to 20 feet
to provide additional separation from the 8" sanitary sewer.
7. Public Service of Colorado requests that the applicant maintain 4' minimum clearances
between proposed trees and Public Service lines.
Comments from the Stormwater Utility Department are attached.
9. The Planning; Department offers the following comments on the basis that no Preliminary
approval has been granted for this site and that the applicant did not schedule a Conceptual
Review meeting prior to the submittal of this development application:
a. Please; revise the Site Plan title to state: "Country Club Corners P.U.D., Third Filing,
Lots 1 and 3 (Total Petroleum), Preliminary and Final Site Plan". Please number the
Site Plan as Sheet 1 of 4.
b. Please revise the Landscape Plan title to state: "Country Club Corners P.U.D., Third
Filing, Lots 1 and 3 (Total Petroleum), Preliminary and Final Landscape Plan". Please
number the Landscape Plan as Sheet 2 of 4.
Please revise the convenience store elevations title to state: "Country Club Corners
P.U.D., Third Filing, Lots 1 and 3 (Total Petroleum), Preliminary and Final
Convenience Store Elevations". Please number the convenience store elevations as
Sheet; 3 of 4.
d. Please revise the car -wash elevations title to state: "Country Club Corners P.U.D.,
Third. Filing, Lots 1 and 3 (Total Petroleum), Preliminary and Final Car -Wash
Elevations". Please number the car -wash elevations as Sheet 4 of 4.
Please delete General Note 4 from the Site Plan.
f. Please revise General Note 8 to state: "Architectural design, materials and colors of
the convenience store, car -wash and related gasoline dispenser island canopy shall be
consistent with the County Club Corners center."
g. The Vicinity Map should show City/County limits, zoning districts, and public
facilities. Please also add a north arrow and a scale to the vicinity map.
h. Please revise the Planning and Zoning Board approval block and Owners Signature
block to indicate the year as "19_" (not 1993).
i. Please delete Landscape note 7.
No promotional panels will be allowed on the exterior of the building. Please delete
these panels from the convenience store elevations.
k. Aluminum glazing will not be allowed on the two lower panels of the convenience
store. Please specify what type of "glazing panels opaqued on second surface" is
proposed.
1. Does the color of the proposed brick match the color of the rest of this center? Please
submit a sample of the brick to be used and indicate this color on all building
elevations.
M. Please indicate the color of the standing seam metal roof. Please submit color chirps
for all materials which are proposed with this development. Staff requests that the
burgundy color which is proposed be "Colonial Red".
n. Is there a range hood for kitchen facilities proposed with this building? Staff is aware
of such a problem at the Harmony Market Total Petroleum convenience store.
o. The architectural character of this facility must match the center. Staff suggests that
the applicant consider building architecture similar to the Total Petroleum which is
being built at 29th and Taft (Shields) in Loveland. This building incorporates pitched
roofs and gables.
P. A bike rack must be provided. Please add this to the Site Plan.
q. The Ail Development Criteria of the Land Development Guidance System are subject
to mandatory compliance. Staff is concerned that the proposed layout of the site does
not meet All Development Criteria A-2.2 "Building Placement and Orientation" or A-
2.6 "Pedestrian Circulation". Staff requests a reversed frontage layout similar to the
Conoco Convenience Store at the corner of Centre Avenue and Shields Street in Fort
Collins. The Landscape Plan will be evaluated further upon the submittal of the
revised layout.
Please; submit a completed Business Service Uses Point Chart for this Preliminary and
Final .P.U.D. request.
S. The proposed canopy cannot hang over the sewer easement.
This completes the review comments at this time. Additional comments may be forthcoming as the
various departments and reviewing agencies continue to review this request. Please be aware of the
following dates and deadlines to assure your ability to stay on schedule for the November 20, 1995
Planning and Zoning Board hearing:
Plan revisions are due by 5:00 p.m. on November 1, 1995. Please contact me for the number
of folded revisions required for each document.
PMT's, renderings, and S folded copies of final revisions (for the Planning and Zoning Board
packets) are due by 3:00 p.m. on
November 13, 1995.
Please contact me at 221-6206 if you have any questions or concerns related to these comments. I
would like to schedule a meeting with you as soon as possible, if necessary, to discuss these
comments.
Sincerely,
Michael Ludwig
Project Planner
xc: ✓Ward Stanford
Stormwater Utility
file/Project Planner
City of Fort Collins
Planning
PROJECT
COMMENTSHEET
DATE: / /- t - y S- DEPARTMENT: r--At G r-
PROJECT: 'T 4A / Pe >rCr.a !< cam. v . ! 4 r-e - Lo /S / 3�
Inouwtr7
3 F, < <;
PLANNER: pry; ke
All comments must be received by:
❑ No Problems
[9-15'roblems or Concerns (see below)
• Horizontal Control Plan
1. Indicate (or draft at correct width) the width of the Handicapped parking
space. See comment on the redlines.
2. Add the word "Metal" to the 2' Sidewalk Culvert so the labeling corresponds
with the labeling of the corresponding detail.
• Detail Sheet
1. Concrete pan detail does not agree with the plans. See comment on redlines.
Date- /G - 9,5- Signature:
CHECK IF YOU WISH TO RECEIVE P
COPIES OF REVISIONS: SITE _
[�- LANDSCAPE
UTILITY
DEVELOPMENT SERVICES, 281 NORTH COLLEGE P.O_BOX 580 FORT COLLINS, COLORADO 80522-0580
PLANNING DEPARTMENT (303)221-6750
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
--
DATE: 2--96 DEPT.: SW W/WW NGR'G
n ---
7�
PROJECT: Country Club Corners 3rd. Filing, Lots 1 & 3 -
Total Petroleum
PLANNER: Mike Ludwig
All comments must be received by: 2-28-96
❑ No Problems
Er --Problems or Concerns (see below or attached)
• Site Plan
1. What type of easement is the 10' along College Ave.?
2. A 15' utility easement is required along College Ave..
3. What are the 2 items shown in Willox Lane ( see plan )?
4. You show a 25' utility easement adjacent to Willox that is dimensioned
as 20' and also shown on the Utility Plans as 20'. Please check.
• Sht. 2 / 5, Utility Plans
1. Indicate a minimum, I' wide area, adjacent to both sides of the
sidewalks, with a max. slope of 2% on both sections.
2. See comment 2, Site Plan.
3. Extend 2' metal sidewalk culvert I' into landscape area (see detail).
Date: 2- 8 " SG Signature: zk24&Z
CHECK IF YOU WISH TO RECEIVE [30-PLAT
COPIES OF REVISIONS [SITE
[Er LANDSCAPE
(—UTILITY