HomeMy WebLinkAboutPENNY FLATS - Filed DCP-DEV. CONSTRUCTION PERMIT - 2007-04-20DEVELOPMENT CONSTRUCTION PERMIT
APPLICATION
(1/16/06)
For City use only: Application Number: Application Date:
Permit application fee: $ 400.00
INSTRUCTIONS:
1. Complete this form (some questions may not apply to you) and attach all necessary documents and
submit to the Development Engineering Section of the City.
2. If you have any questions contact the Development Engineer, Marc Virata, at 221-6605.
3. Submit the Application and pay the Application Fee at the fee at the Engineering counter at 281 N.
College Avenue.
PROJECT INFORMATION:
Project Name (as approved by the City):
PENNY FLATS: PHASE 1
Project A.K.A. (Marketing name if different from Project Name):
NA
Project Location:
204 Maple Street, Fort Collins, CO 80521
Property Owner (At the time of this permit issuance):
Individual Name: John A. Koval, Manager
Company Name: Penny Flats, LLC
Address: 1811 Pearl Street, Boulder, CO 80302
Phone number(s):
Office:
Cell phone:
Fax number:
Email:
(303) 442-3351 ext 1112
NA
(303) 447-3933
jkoval@coburndev.com
Applicant/Project Manager (The primary contact person for all matters regarding this project, and the
person responsible for all matters referencing "the Developer" in the Development Agreement for this
project):
Individual Name:
Company Name:
Address:
Phone number(s):
Office:
Cell phone:
Fax number:
Email:
Daniel R. Romer, AIA
Coburn Development, Inc.
1811 Pearl Street, Boulder, CO 80302
(303) 442-3351 ext 1113
NA
(303)447-3933
drotner@cobumdev.com
n
G
N
Transportation Services
Engineering Department
DEVELOPMENT CONSTRUCTION PERMIT
Permit Number: _ i� 7 — Issuance Date: o
Project Name: Penny Flats Phase 1
Project Location: southwest corner of Male Street and Cheery Street )
Permittee: P&:iIl ` i��eL_arP'ur.�' ING• __
City and developer contacts: See attached Exhibit "A" for names and phone numbers of all
contact persons for this project.
Nees: Permit Application Fee (paid at the time of application) 400.00 pd.
Construction Inspection Fee (paid prior to issuance of this permit) $ __ J.h &a,
Total $ 5.015.65 ___
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shown on the approved plans for the development.
$237 468 44 — Phase 1 and $13,498.45 — Phase 2 pedestrian spine. The letter of credit for
the Phase 2 pedestrian spine will be returned upon the receipt of a letter of credit for all of
Phase 2 in conjunction with the issuance of a Phase__ --
Form of security deposited with the Citv: Letters of credit
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design
drawings and specifications the certification of all materials testing by an Engineer. The Permittee
shall have an Engineer prepare revised design drawings and secure City approval for all rev i sions to
the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required
by the City in',he Development Agreement, that line improvements are constructed in conformance
with the approved (itility Plans and the standards and specifications of the City. The Fermittee shall
provide `as-eonstructel" plans prepared by an Engineer prior to the City's acceptance of the
constructed public improvements. (All references above to the terms "Project Fnginee, arx'
`Engineer" shall mean a Professional Engineer licensed in Colorado.)
2, All contractors who perform work on this project must be bonded and licensed in conformancc
with City requirements.
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605 • FAX (970) 221-6378
www.fcgov.com
Development Construction Permit, Page 2/5
3. Construction time restrictions:
4. The applicant understands that additional permits maybe required for this development project
and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this project
(utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic
study, drainage report, plat easements and any other official documents), shall be kept on the
development site available for use by City staff doing inspections.
6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or
Section 2.6.3(K) of the Land Use Code, whichever is applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shall expire and the applicant will forfeit the Permit fee paid for this
permit, whereupon the applicant must re -apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The applicant
may apply for an extension by reapplication at least two weeks prior to the expiration date.
Such application shall contain information sufficient to justify the granting of the extension.
An extension may be granted for up to six months.
7. Building permits and certificates of occupancy will only be issued when all conditions contained
in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29-
678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the
Development Agreement does not specify times for completion of public improvements, or if there is
no Development Agreement, then the improvement requirements specified in Section 24-95 of the
City Code shall apply, which provides that construction of all improvements shall be required prior
to the time of issuance of the first building permit.
8. Acceptance by the City of the public improvements shall be after (1) final inspection has been
conducted by the City; (2) punch list items from the final inspection are completed and accepted by
the City; and (3) required certifications from the licensed professional engineer that improvements
are completed to City standards, specifications and approved Utility Plans; and the "as -constructed"
plans have been received and accepted by the City.
9. The warranty on street improvements is for five (5) years from the date of acceptance by the City
of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional
Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use
Code, as applicable.
10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any
planned construction on this project. All required perimeter silt fencing and other erosion/sediment
control best management practices (BMP's) that can be installed prior to construction must be in
Development Construction Permit, Page 3/5
place and inspected by the City Erosion Control Inspector before any land disturbing activity begins.
11. No work (including grading and construction access) shall be started in State Highway right-of-
way until a permit is issued by the Colorado Department of Transportation to allow such work to
begin.
12. Other conditions:
Permittee's acknowledgment signature:
By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of
the owners of the property (including all owners having legal or equitable interest in the real property, as
defined in Section 1-2 of the City Code; and including common areas legally connected to or associated
with the property which is the subject of this application) without whose consent and authority the
requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City
officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such
property to perform work required of the applicant if th pplicant were to fail to perform the required
work. I also acknowledge that I have read this p it document with all its requirements and
conditions, and I agree to all of the terms and co ' tons so stated in thA pepnit/
Applicant/Project Manager' s Signature:
Approvalforissuance:
City Engineer
Date:
Date: D o
(Pet it Issuance Date)
Development Construction Permit, Page 415
EXHIBIT "A"
DEVELOPMENT PROJECT CONTACT PERSONS
Project Name: Penny Flats Phase I
City Staff Contact Persons:
Development Engineer: Marc Virata / City of Fort Collins Engineering
281 N. College Avenue / Fort Collins, CO 80524
970 221-6605
Construction Inspector: Lance Newlin / City of Fort Collins Engineering
281 N. College Avenue / Fort Collins, CO 80524
970 416-2011
Current Planner: Anne Aspen / City of Fort Collins Current Planning
281 N. College Avenue / Fort Collins, CO 80524
970 221-6750
Sanitary Sewer Engineer: Roger Buffington /City of Fort Collins Utilities
700 Wood Street / Fort Collins, CO 80521
970 221-6854
Erosion Control Inspector: Bob Zakely / City of Fort Collins, 700 Wood
Street, Fort Collins, CO 80521
970 221-6063
Traffic Operations: Eric Bracke / City of Fort Collins, 625 Linden
Street, Fort Collins, CO 80524
970 224-6062
Street closures: Syl Mireles / City of Fort Collins, 625 Linden
Street, Fort Collins, CO 80524
970 221-6815
Transportation Planning: Dave Averill / City of Fort Collins, 215 N
Mason Street, Fort Collins, CO 80524
970 416-2643
Forestry: Tim Buchanan / City of Fort Collins, 281 North
College Avenue, Fort Collins, CO 80522
Light and Power: Doug Martine / City of Fort Collins, 700 Wood
Developer' Contact Persons:
Owner:
Project Manager:
Project Engineer:
General Contractor:
Development Construction Permit, Page 5/5
Street, Fort Collins, CO 80521
970 224-6152
John Koval, Manager
Penny Flats, LLC
1811 Pearl Street
Boulder, CO 80302
303 442-3351 x1112
303 447-3933 (fax)
jkoval@cobumdev.com
Daniel Romer, AIA
Coburn Development, Inc.
1811 Pearl Street
Boulder, CO 80302
303 442-3351 x1113
303 447-3933 (fax)
drotner@coburndev.com
Jon Sweet
Jim Sell Design
153 W. Mountain Avenue
Fort Collins, CO 80524
970 484-1921
970 484-2443 (fax)
jons@jimselldesign.com
Jim Swartz
Drahota Development Company, LLC
P.O. Box 272269
Fort Collins, CO 80527
970 204-0100
970 227-2014 (cell)
970 204-0200 (fax)
jim.swartz@drahota.com
w
W
W
2
rn
w
N
Q
H
uj
w
I.-
U)
O
Q
O
z
Q
w
F
z
Q
7
Ci
F
v
w
O
w
a
o (Doo 0 o(Oro 00000 •-o 000 .n
M 1+I00 M OOf d'O 0000(D ON
00 E9 V! O tR� n IA'It � W to
fA00 \ O
M fA Nf fA (R fA fA 1 bi di (Pr fR fR (fl \J�
j J
O a U
Z
LU
LU
¢ CL * r
OLL
vJ O
Zz
rr(n(Do0 rrr000000o v000vv J
o00 o mm ooaao oviviui o�� o0 3
Z Z 0 — (A Vi (n E9O O (A Vi f9 r�r�0 �M�m m Y)V)V}ifl Vi V3 U)
O M w :) ifr in z
z
wa>� w w 0
ZU-- Z z
w covo0oo ooMoo0oo00 o(D00000 O w 0_
w Ma0000 oc.lrn0000000 oNm0000 H o�
O (O 0 0 0( V •- O N O M 0 0 0 W CO (O O O N N U
F N N(A fA tD V MO V V Mb9000.- r m(A b9 di OO w to
W
V Nm rw r. NM O3- M (n Via' d 4 ~
Q N hl (3 (D N N CD C (D M (p (.y Q
w d' Ui fA EH fff fA C9 E9 ER CA E9 di CA z N
H F N
4 U)'� W U_
0yz0 O LU
h W- U ~ N i
W W 0=
r M 0 00 OOM0000000 O DD O (DO
S o 0 0 0 0 0 o rn M o 0 0 0 0 0 0 o r rn o O
Z W F N r 0 0 V' O N (V O O O O (D ( M co V N M
F V w MCA ODD f9V MGM( M — r Nam- N0 V
F O — W Q m d! (`i N CA to (n e- � M r e- f9 cq f9 fA W W
Cq CIA
U¢�FaWN>0 U i
(Li00LLOa tom- m
V 0 0 O N N O N N (D ID Na O O Q H
w O C' D LL
LLILU
W Z Z W
x0 U Z
Z J J
w
J
~ W W W n U)
Ix �z>O Q O
IL P V) a. O 0 ZI
z wOO a ~ LU
Z
9 U.
z0
IL xx xxxxxxx —m
00 0) LLLLY>-00 LLLLLL0000a00 UIYLLLLLLrr C
W Q J J C) U W W J J J W W W W W W W (/7 J J J U) f
w ULL
W W
0 z0
w W KU
x m Mw
m0 U K�
h
U) Ja
V) a� 5 in zz
a Z m V ,' ` N N _ W F-
W O W n 2 m J o c N
to Q w y m` c U ri >
w v 0 m g Z y c m a Oa ZI`
f m� 3 p (- c 3� IL
`Z Omm
F ``d "
U'
�a�c W�O=(D
mV0.J W m �
Ull
O N> E c c c° c m c �� c>° ami a o a 9
w W R' o y m D m_ m w C. m m m m t6 m V m N n a ZI
a ova a�I�U�¢� 3m�r�iTm>aLL� U�c7aU a¢U