Loading...
HomeMy WebLinkAboutPENNY FLATS - Filed E-ELEVATION PLAN - 2007-02-05V CM --t METAI It 10� tsuuaing 6: Mixed Use, Residential / Stone, Brick, Stucco, & Metal Siding ir4aple Street Elevation sA4 ca/e: 1/16" = 1'-0" METAL SIDING STEEL CORNICE Nlorth Mason Street S: ,ale: 1116" = 1'-0" esutsamg u: mixea Use, Residential / Office / Retail Stone, Brick, Stucco, Steel, Glass, & Metal Siding Clerry Street Elevation 4 hi, wth Howes Street SA4 Sc4e: 1116" = 1'-0" ALL STREET LEVEL DOORS OPENING TO MAPLE ST SHALL BE INSET 3' TO AVOID ENCROACHMENT ON THE RIGHT OF WAY Building 7: Rowlofts Split Face Concrete Block, Standard Concrete Block, Stucco, & Metal Sidin ounaing a: mixea use Resiaentlai i Brick, Stucco, & Metal Siding Building 1: Townhouses Brick, Stucco, Cement Board Siding, & Metal Siding rI r IS IStone, Brick, Stucco, Steel, Glass, & Metal Siding nvEe: Depicted Facade treatment and materials anticipate D.D.A. funding support for facade material upgrade in exchange for facade easement. Colors shall be consistent with the traditional building) colors found in the adjacent Civic Center and historic Old Town Fort Collins as depicted in the rendering submitted for PDP hearing. Building 6: Mixer. Stone, Brick, Stuc e Jse, Residential / Office / Retail & Metal Siding SIDING STONE BASE Cn�U{�N Planners • Designers • Builders 1811 Pearl Street Boulder, Colorado 303-442-3351 Penny Flats Fort Collins, C Site Design Disclaimer. These documents are provided by Coburn Development Inc., for the design intent of this specific project and only this project. The contractor shall be res— ponsible for all construction coordination, methods and materials required for the successful completion of the project. This includes but is not limited to the quality of workmanship and materials required for execution of these doc— uments and work or materials supplied by any subcontractors. All work shall comply with governing codes and ordi— nances. The contractor shall review and understand all documents and shall notify the Architect immediately of any discrepancies in the drawings, field con— ditions or dimensions. Revisions Issue pate Final Compliance Set SA4 September 6, 2006 Building Elevations P-wt44 2495 A Lt\ O N STUCCO 2 TA-5 Building 7: Row Lofts Split Face Concrete Block, Standard Concrete Blo k, Stucco, & Metal Siding Pedestrian S Scale: 1116" = 1'-0" �w West Elevation II� cMu F. I■ fil_:: m nmminlfflva 0n Ifillii ININIlil 10166I■II■i'I �NM �MI� I•MW W. tsunain(Lb mixed use, Residential / Offce / Retail Building 2: Row Lofts Stone, Brick, stucco, &Metal Siding Split Face Concrete Block, Standard Concrete Block, Stucco, & Metal Siding Pedestrian'Spin6 East Elevation ^--I- .,.— _. _.. 3 Alley Behind SA5 Q/�9ID • /1 R,1 _ -I I All Site Section r Five Elevation Drive Aisle Building 3: Row Lofts Split Face Concrete Block, Standard Concrete Block, Stucco, & Metal Siding Building 5: Mix Brick, Stucco, & i Note: Depicted Facade treatment and materials ai D.D.A. funding support for facade material t in exchange for facade easement. t Use, Residential / Office / Retail letal Siding icipate grade Colors shall be consistent with the tradition I building colors found in the adjacent Civic Center an historic Old Town Fort Collins as depicted ir'' he rendering submitted for PDP hearing. (ED USE COMMERCIAL COMMERCIAL N. MASON STREET Cn�UE'ZN Planners • Designers • Builders 1811 Pearl Street Boulder, Colorado 303-442-3351 Penny Flats Fort Collins, � Site Design Disclaimer. These documents are provided by Coburn Development Inc., for the design intent of this specific project and only this project. The contractor shall be res- ponsible for all construction coordination, methods and materials required for the successful completion of the project. This includes but is not limited to the quality of workmanship and materials required for execution of these doc- uments and work or materials supplied by any subcontractors. All work shall comply with governing codes and ordi- nances. The contractor shall review and understand all documents and shall notify the Architect immediately of any discrepancies in the drawings, field con- ditions or dimensions. Revisions issue Date Final Compliance Set SA5 September 6, 2006 ot;cuv. I / IO- = I -V &Lection