HomeMy WebLinkAboutSANCTUARY PLANNED LAND DIVISION - Filed DCP-DEV. CONSTRUCTION PERMIT - 2007-01-31DEVELOPMENT CONSTRUCTION PERMIT
APPLICATION
(1/16/06)
For City use only: Application Number:
INSTRUCTIONS:
Application Date:.
Permit application fee: $ 400.00
I . Complete this form (some questions may not apply to you) and attach all necessary documents and
submit to the Development Engineering Section of the City.
2. If you have any questions contact the Development Engineer, , at 221-6605.
3. Submit the Application and pay the Application Fee at the fee at the Engineering counter at 281 N.
College Avenue.
PROJECT INFORMATION:
Project Name (as approved by the City):
Project A.K.A. (Marketing name if different from Project Name):
Project Location: Y�` '5 E W1 b2UE # 5A10"JI ( ,-� •
Property Owner(At the time of this permit issuance):
Individual Name:LhS�
Company Name.
Address: 3'I"Bo 'f5RCT CT'4_I .Catc.t
Phone number(s):
Office: 'LiQ"%• ze7.
Cellphone: 770• oo t
Fax tn�u�mb�er: 30-5- 7 -7>'j7
Email: Dr JGL�iyrlCiad
Applicant/Project Manager (The primary contact person for all matters regarding this project, and the
person responsible for all matters referencing "the Developer" in the Development Agreement for this
project): `- - ram. % ^ t
Individua
Company
Address:
Phone number(s):
Office: _910 •7.1&o • Llo':=G
Cellphone:[i �j(�G•�►](t�
Fax number: 226 • 6
Email.
Please note:
Public Improvements Opinion of Costs
Project Name: The Sanctuary Planned Land Division
,e needed for on -site and off -site Imnrnvamant*
Stockpile Topsoil
CY
$0.00
Straw Bale Units
EA
$100.00
3
$300.00
Inlet Protection
EA
$200.00
4
$800.00
Silt Fence
LF
$2.25
2530
$5,692.50
Seeding & Mulching
AC
$900.00
15.7
$14,130.00
Vehicle Tracking Pad
EA
$1,000.00
2
$2,000.00
Subtotal 20.2. 1 Erosion Control $22,922.50
20.2.2 Street Improvements
Clearing and Grubbing Lump Sum
LS
$25,000.00
1
$25,000.00
Removal of Structures and Obstructions
EA
$500.00
$0.00
Subgrade Preparation
SY
$2.00
5890
$11,780.00
Excavation
CY
$2.00
7095
$14,190.00
Borrow
CY
$5.00
10000
$50,000.00
Fill
CY
$2.00
49183
$98,366.00
Rock Excavation
CY
$0.00
Filter Material
CY
$0.00
Lime Treatment
SY
$0.00
Asphalt Patching
TONS
$0.00
Asphalt Pavement
TONS
$40.00
960
$38,400.00
Base Course
TONS
$10.00
1790
$17,900.00
Concrete Pavement
SY-IN
$0.00
Geotextile
SY
$0.00
Riprap
CY
$0.00
Survey Monuments
EA
$0.00
Adjust Manholes
EA
$100.00
12
$1,200.00
Adjust Valves
EA
$0.00
Adjust Monuments
EA
$0.00
Median Cover Material (Concrete)
SY
$0.00
Subtotal20.2.2 Street Improvements $256,836.00
20.2.3 Structures
Bridge Structure
EA
$0.00
Culverts
EA
$0.00
Guardrail
LF
$0.00
Railing (Pedestrian)
LF
$0.00
Railing (Traffic)
LF
$0.00
Headwalls
EA
$0.00
Subtotal20.2.3 Structures
20.2.4 Pedestrian and Bikeway Facilities
$0.00
Sidewalk Grading
SY
1 $2.001
19001
$3.800.00
4-inch Thick Sidewalk
SY
1 $25.001
18261
$45,650.00
6-inch Thick Sidewalk
SY
1 $30.00
2401
$7,200.00
Directional Curb Ramp
SY
$400.00
38
$15,200.00
Opinion of Costs
Page 1
LCPP-137 February 27, 2003
Public Improvements Opinion of Costs
Project Name: The Sanctuary Planned Land Division
Please note: Separate costs are needed for on -site and off -site im rovemeW
a
�''>&.;A�-^�
g}t��,,
3
Corner Curb Ramp
SY
$0.00
Mid Block Ramp
SY
$400.00
14
$5,600.00
Concrete Bikeway
SY
$0.00
Sidewalk Chase
EA
$1,000.00
3
$3,000.00
Curb and Gutter Grading
LF
$0.00
Curb and Gutter — Type II
LF
$0 00
Curb and Gutter — Type I
LF
$10.001
37641
$37,640.00
Glue -down Curb
LF
$0.00
Subtotal 20.2.4 Pedestrian and Bikeway Facilities $118,090.00
20.2.5 Street Lighting
Standard Pedestrian Light
EA
$0.00
Standard Street Light
EA
Subrorai2u.z5StreetLighting $0.00
20.2.6 Traffic Signals, Signing and Striping
Standard Street Signs
EA
$500.00
2
$1,000.00
Standard Sign Posts
EA
$0.00
Standard Regulatory Signs
EA
$0.00
Standard Speed Limit Signs
EA
$500.00
2
$1,000.00
Latex Paint (4 inches)
LF
$0.00
Latex Paint (8 inches)
LF
$0.00
Latex Paint (12 inches)
LF
$0.00
Latex Paint (18 inches)
LF
$0.00
Latex Paint (24 inches)
LF
$0.00
Epoxy Pavement Marking (4 inches)
LF
$0.00
Epoxy Pavement Marking (8 inches)
LF
$0.00
Epoxy Pavement Marking (12 inches)
LF
$0.00
Epoxy Pavement Marking (18 inches)
LF
$0.00
Epoxy Pavement Marking (24 inches)
LF
$0.00
Preformed Tape for Symbols & Crosswalks
SF
$5.00
300
$1,500.00
Preformed Thermoplastic
SF
$0.00
Traffic Signals
EA
$0.00
Subtotal20.2.6 Traffic Signals, Signing and Striping $3,500.00
20.2.7 Work Zone Traffic
20.2.7 Work
20.2.8 Storm Drainage Facilities
Grading
SY
$0.00
Inlets
EA
$0.00
Manholes
EA
$0.00
Pipe (Material Type - Size)
LF
Opinion of Costs
Page 2
LCPP-137 February 27, 2003
Public Improvements Opinion of Costs
Project Name: The Sanctuary Planned Land Division
Please note: Seoarate costs are needed fnr nn_sife and nff-a,•a 1.........,e...e.....
Trickle Channel (width)
LF
k,p
$0.00
Outlet Structure (orifice plate)
EA
$0.00
Subtotal 20.2.6 Storm Drainage Facilities
20.2.9 Removals and Repair
$0.00
Asphalt Patching
TON
1 $70.001
181
$1,260.00
Concrete Sidewalk R & R
SY
$0.00
Concrete Curbwalk R & R
LF
$0.00
Milling
SY
$0.00
Asphalt Removal
SY
$5.00
110
$550.00
Subtotal20.2.9 Removals and Repair $1,810.00
20.2.10 Construction Surveying/Staking LS 1—$10,000.001 1 $10,000.00
Subtotal 20.2.10Construction Surveying/Staking $10,000.00
20.2.11 Material Testing LS $1,500.00 1 $1,500.00
Subtotal 20.2. 11 Material Testing $1,500.00
20.2.12 Record Drawings ILS 1 $2,500-001 1 $2,500.00
Subtotal20.2.12 Record Drawings $2,500.00
20.2.13 Construction Management ILS I $38,000.001-----JF $38,000.00
Subtotal20.2.13 Construction Management $38,000.00
Water Line Construction
Water Mains (8" PVC)
LF
$20.00
1745
$34,900.00
On -Site Water Supply Service
EA
$1,200.00
20
$24,000.00
Fire Hydrants
EA
$3,500.00
3
$10,500.00
Sewer Line Construction
IORMTJ
Subtotal Water Line Construction $69,400.00
Trunk Lines
$0.00
Mains (8")
LF
$25.00
1689
$42,225.00
Laterals or House Connections
EA
$900.00
20
$18,000.00
Manholes
EA
$1,500.00
12
$18,000.00
Subtotal Sewer Line Construction $78,225.00
$0.00
Subtotal Other $0.00
SUBTOTAL OF PUBLIC IMPROVEMENTS: $602,783.50
Opinion of Costs
Page 3
LCPP-137 Febmary27,2003
Public Improvements Opinion of Costs
Project Name: The Sanctuary Planned Land Division
note: Separate costs are needed for on -site and nff-site 1m...�..e,..e...e
16%
1
GRAND TOTAL OF PUBLIC IMPROVEMENTS
Landscape Improvements:
$693,201.03
Plant Materials
$0.00
Irrigation System
$0.00
Paving /Surfacing
Structual Elements (Gazebo's, Benches,
Fountains, etc.)
$0.00
$0.00
Mulch / Weed Barrier Materials
$0.00
Edging / Tree Staking Materials
$0.00
SUBTOTAL OF LANDSCAPE IMPROVEMENTS:
Additional _% required by the Dev. Agreement
GRAND TOTAL OF LANDSCAPE IMPROVEMENTS:
$0.00
$0.00
$0.00
ATTEST:
BOARD OF COUNTY COMMISSIONERS
LARIMER COUNTY
Chairman
PROFESSIONAL ENGINEER (Signature/Stamp)
DEVELOPER
(Required if project in GMA)
Opinion of Costs
Page 4
LCPP-137 February 27, 2003
Transportation Services
Engineering Department
DEVELOPMENT CONSTRUCTION PERMIT
Permit Number: OG - Z Z Issuance Date:
Project Name: The Sanctuary
Project Location: Rocky Stream Drive & Snowy Range Road
Permittee: Doudas Beard Sanctuary Development Corn
City and developer contacts: See attached Exhibit "A" for names and phone numbers of all
contact persons for this project.
Fees: Permit Application Fee (paid at the time of application) $ 400.00 lad)
Construction Inspection Fee (paid prior to issuance of this permit) $ 14,330.15 (ad)
Total $ 14,730.15
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shown on the approved plans for the development.
$ 446,218.75
Form of security deposited with the City:
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design
drawings and specifications the certification of all materials testing by an Engineer. The Permittee
shall have an Engineer prepare revised design drawings and secure City approval for all revisions to
the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required
by the City in the Development Agreement, that the improvements are constructed in conformance
with the approved Utility Plans and the standards and specifications of the City. The Permittee shall
provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the
constructed public improvements. (All references above to the terms "Project Engineer" and
"Engineer" shall mean a Professional Engineer licensed in Colorado.)
2. All contractors who perform work on this project must be bonded and licensed in conformance
with City requirements.
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605 • FAX (970) 221-6378
www.fcgov.com
Development Construction Permit, Page 2/5
3. Construction time restrictions:
4. The applicant understands that additional permits maybe required for this development project
and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this project
(utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic
study, drainage report, plat easements and any other official documents), shall be kept on the
development site available for use by City staff doing inspections.
6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or
Section 2.6.3(K) of the Land Use Code, whichever is applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shall expire and the applicant will forfeit the Permit fee paid for this
permit, whereupon the applicant must re -apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The applicant
may apply for an extension by reapplication at least two weeks prior to the expiration date.
Such application shall contain information sufficient to justify the granting of the extension.
An extension may be granted for up to six months.
7. Building permits and certificates of occupancy will only be issued when all conditions contained
in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29-
678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the
Development Agreement does not specify times for completion of public improvements, or if there is
no Development Agreement, then the improvement requirements specified in Section 24-95 of the
City Code shall apply, which provides that construction of all improvements shall be required prior
to the time of issuance of the first building permit.
8. Acceptance by the City of the public improvements shall be after (1) final inspection has been
conducted by the City; (2) punch list items from the final inspection are completed and accepted by
the City; and (3) required certifications from the licensed professional engineer that improvements
are completed to City standards, specifications and approved Utility Plans; and the "as -constructed"
plans have been received and accepted by the City.
9. The warranty on street improvements is for five (5) years from the date of acceptance by the City
of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional
Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use
Code, as applicable.
10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any
planned construction on this project. All required perimeter silt fencing and other erosion/sediment
control best management practices (BMP's) that can be installed prior to construction must be in
Development Construction Permit, Page 3/5
place and inspected by the City Erosion Control Inspector before any land disturbing activity begins.
11. No work (including grading and construction access) shall be started in State Highway right-of-
way until a permit is issued by the Colorado Department of Transportation to allow such work to
begin.
12. Other conditions:
Permittee's acknowledgment signature:
By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of
the owners of the property (including all owners having legal or equitable interest in the real property, as
defined in Section 1-2 of the City Code; and including common areas legally connected to or associated
with the property which is the subject of this application) without whose consent and authority the
requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City
officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such
property to perform work required of the applicant if the applicant were to fail to perform the required
work. I also acknowledge that I have read this permit document with all its requirements and
conditions, and I agree to all of the terms and conditions so stated in this permit. /
Applicant/Project Manager's Signatur
Approval for issuance:
City Engineer Approv Gc l , Date: -7/� CAD
a ' _ (Permit Issuance Date)
!J
Development Construction Permit, Page 4/5
EXHIBIT "A"
DEVELOPMENT PROJECT CONTACT PERSONS
Project Name: The Sanctuary
City Staff Contact Persons:
Development Engineer: Marc Virata / City of Fort Collins Engineering
281 N. College Avenue / Fort Collins, CO 80524
970 221-6605
Construction Inspector: Lance Newlin / City of Fort Collins Engineering
281 N. College Avenue / Fort Collins, CO 80524
970 221-6605
Current Planner: Anne Aspen / City of Fort Collins Current Planning
281 N. College Avenue / Fort Collins, CO 80524
970 221-6206
Water Utilities Engineer: N/A
Erosion Control Inspector: Bob Zakely / City of Fort Collins, 700 Wood
Street, Fort Collins, CO 80521
970 221-6063
Natural Resources: Doug Moore / City of Fort Collins, 281 North
College Avenue, Fort Collins, CO 80522
970 224-6143
Traffic Operations: Eric Bracke / City of Fort Collins, 625 Linden
Street, Fort Collins, CO 80524
970 224-6062
Street closures: Syl Mireles / City of Fort Collins, 625 Linden
Street, Fort Collins, CO 80524
970 221-6815
Transportation Planning: Dave Averill / City of Fort Collins, 215 N
Mason Street, Fort Collins, CO 80524
970 416-2643
Development Construction Permit, Page 515
Forestry: Tim Buchanan / City of Fort Collins, 281 North
College Avenue, Fort Collins, CO 80522
Light and Power: Janet McTague / City of Fort Collins, 700 Wood
Street, Fort Collins, CO 80521
970 224-6154
Developer' Contact Persons:
Property Owner/
Developer/Permittee:
Project Manager/
Applicant/
Architect/Planner:
Project Engineer:
General Contractor:
Douglas Beard
The Sanctuary Development Corp.
3480 Egret Court
Fort Collins, CO 80528
303 287-2800 (w)
720 289-1001 (c)
303 287-7357
drdbeard@aol.com
Tom Dugan
Pinecrest Planning & Design LLC
4225 Westshore Way
Fort Collins, CO 80525
970 226-1655 (w)
970 566-4714 (c)
970 226-1635 (0
tompinecrest@qwest.net
Mike McRoberts
Northern Engineering
200 South College Avenue
Fort Collins, CO 80521
970 221-4158 (w)
970 221-4159 (f)
mikem@northemengineering.com
Van Miranda
White Line Earthworks
516 W. 67u Street
Loveland, CO 80538
970 461-4091 (w)
970 556-0826 (c)
970 461-8602 (f)
van@wlearthworks.com
p wf (o�(elMxvf ,t9-We luel �MA+,/ C®2-LBZ I4(fi� '3NONtl
B (( MSxi�xxxxe m'wspy. y, a x.NA3 mei6 �� BL0.� sxmoa Lpi ANY
13F413 DiFi e j
Y a us•. ^�• 'J 1134Fd0'i3130 AtlYmo S 3 /U
4W
•a' 1Yltl M1RNgBI15 •�
= a 7 VJ SZfO 1/ (UNIX "m �w NOISAIO ONV 43NNtl d xavni�Nvs 31
m JILJ,( s
pNJ
i4: • n. :9.1
-��-_ a' 2+ I � M.21.OMG5 � wracs —
a
Na-
irk x j1 (I
2 .. ___ r t 6ni
i,
I £ I IR amV
JR
„1 I
Ir Y 2 if
5€f L' j'
f Fmc� Rn J � � 4i\ � $�'I•igi � v
Is
,2 \.�=
�d L >• c m,�
t
--� -- - - -- `
TTT p F[
\S tlK x!
• uT 5 \ - �. Y� F�. - I g��
I ) �
IImo�,, A\ fa". s Aa3Mooa
�h
6
n
.. as [tf
cs zaz 3.z+onow gg � FF
- pvi pI \I Wie
nu+rz �S It
LL
O
00000O
o0000oOo0o
moOo00000
q
O0000O
w
OOVO000000aaam
oon0000n�
i9 M O M N
fA f9 1A t9 (A IA W f9 di
N M M M N tp n M�
n
0
F
U
LU
u. w
=w
LL
O 000000
000000000o
u>000000m�u
n non �n000
nnnooO0000
voO0000vv
F
oO c'I ai t+) thM
Oo000�+10�11 i()�
O� 00
rW
=0 �
fA fA fA fAO O O
f9 EAwn n O n M M M
fA E9��W (Jj Hi rn
O W U
a W
a >~
O
wam
o00000
000000000o
mr�n u�0000ma
O
0000�rio
00 0000000
o�rir 6 o o vi6 oao
N VI HfO M O
fA iA� MfA fA fA fA f9 d3
N N O t0 �
U
S
�- MGM
N
(ON W NOON-
TunioM�N»�ow
U5m
WK
f» w
F H
i»in
w
S
O O O O O O O
O O O O O O O
o 0 n 0 n o o o 0 0
0 0 0 n o n o n n o
O N N N 0 0 0 0 CO ap
N OJ r fO O fO 0 0 n N
F }
NMOOO�(1O
N Ot9 fAOO �(1
OON0000000
fA i9�fA fA fA IA fA t9 fA
OrON V N ENO]
N N M Nf9
mLU
fA fA M eD t0
fA
f0 f9 fA f9 19 fA fA O f9
w�w>
»
a
co
0 CL
UQU
c0.10LU
W
W Z_
ni
Ld Ni Ni
F
z
w
m
cn
>�
Ra
a
2 S S
2 2 2 S 2 S S
2
li li T Y U U U
LL LL LL U U U U U U U
m Y li LL. LL W LL U r i
J ��� W W
J m J J J J J 4 y y
W W
w
J
m
Q
U
J
LL N
m
=
n
a F
Q Z
U
m
qo m
Ow
y c y
3 cLi
Z 2
Lu
N
3 J O =O
U
V in QJm O
n
U>
-
2
Y Y Y Y N 4
ix
ja
vU uui
m cn ~cEE
a3i w Ea
Cf
`u ngm �'a
c 3 ^tiU
"'
a`�n n Ma
d c c
zincn�)U)JF
N«.~..yyN
JE
O)QKua;�3t
``°«u«=CO d�d
v aEi�AAAmdo
_l a
w4 in in O — V N
m.-.-U3amm
N N N W d N> N .s N
m ZtiTM�MLZ
N N N m N 2
cg2Onnoci'2c
n
_a
x
W
Q
z
a
s
w
w
Ap O
I S
W
0
J
U
Z
W
m
0
O
W
W
2
J
3
of
Z
O
M• F U'.
M O
yZ
m
�0
ULL
z N
�O
U
W
a
W
K U
y �
z�
W m
>
>
OZ
LL, Z
QO
> W
2
a~
C
F
W m
�LL
w Z V
H
7
w
a
0000000
O o0o0o0
o 000 of nn
tO 9MO MN
f9 M f9 fA
OO6 C66
19 fA !A
0000000
0o 000Ino
O O f 9 O M O
? M � M
LU i 0 0 0 o 0 0 0
LU N M ON � O 6 6
Q in A y N
0) W 9 9 9
w0
0LL�
VQU
ii ii Y>UUU
J J U U
W
N
m —
90 w
a aa. m: ou
a=}>a.0
o U d U u 10 6
Q Q d c m
v> �n o
OZom
o o 0 0 0 0 0 0 0 0
0 o v 0 0 0 0 0 0 0
0 o r o 0 0 0 0 0 0
fRMn HfA 4i f9 fA Ui fA
CN
0 0 0 0 0 0 0 0 0 0
n n r o 0 o 0 0 0 0
w f»esrnon MM M
ai vi � ors f» as as
0 0 0 o o 0 0 o 0 o
�1
O O O O o 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
O O N 0 0 0 0 0 0 0
f9 d3 � fA fA fA fA E9 fA d3
O ONO 0 0 0 0 0 0
W
M
ii u: u.UU V UUUU
J J J g a a 4 q a q
C N
N J cc
U
n O ~
m
It
n 3 m v
Z'
o A W « m �L� 7,6
m ii2 2ii�
n o o O o 0 0 0 0
000vio vioov
(NON (MON N ��m
F» vi en
pov000000vv
o �n00000000
w non �n0000wv
d uirr000vi uioro
M O N p 0p
.6tA
O i0O u90000aD OJ
m mr roo�000n�n
W N [O N O O K t0+1 O
N Cl In
2
(nYLLLLLLILLLU Y>
J (n J .J J J J q (/J (n
c
a
io N
i0 3
O 40 CO w O
w
m
O
Z
J
J
3
N
Z
W
f
w
z
a
f
W
m
0
0
W
W
2
J
J
z
Z
O�
v?
wa0
w o
2 m
0
Q
U
z F
— Q
X U
M W
O R
W
� U
N �
Z H
W N
W
OZ
K�
CL
EF
w0
Q ~
>w
S
IL,