Loading...
HomeMy WebLinkAboutPARADIGM PROPERTIES 2004 - Filed CS-COMMENT SHEETS - 2007-01-08PROJECT COMMENT SHEET Current Planning DATE: May 23, 2002 TO: Technical Services PROJECT: #29-01A Paradigm Properties ODP —Type II (LUC) All comments must be received by Steve Olt no later than the staff review meeting: June 19, 2002 �N Lf Note - Please identify your redlines for future reference Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat _Site _Drainage Report _Other _Utility _Redline Utility _Landscape REVISION COMMENT SHEET DATE: October 1, 2002 TO: Engineering PROJECT: #29-01A Paradigm Properties ODP — Type II (LUC) All comments must be received by Steve Olt no later than the staff review meeting: October 23, 2002 No Comment Problems or Concerns (see below or attached) **PLEASE IDENTIFY YOUR REDLINES FOR FUTURE REFERENCE** QIEC% HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Dal& _ Site _ Dk iW Repot � U' Project Comments Sheet Selected Departments City of Fort Collins Date: March 13, 2003 Project: PARADIGM PROPERTIES ODP - TYPE II (LUC) 29-01A All comments must be received by Steve Olt in Current Planning, no later than the staff review meeting: March 05, 2003 Note - Please identify your redlines for future reference Issue Contact: Marc Virata Topic: General Number: 38 Created: 10/18/2002 Note number 10 Indicates a 15' utility easement alongside Internal streets. 9' of utility easement Is the minimum required on all streets except Prospect, which Is 15'. [2/28/031 Note #9 Indicates 20' utility easements along the frontage road will be provided. In talking with the applicant, apparently Xcel Energy required the 20' utility easement. I'd suggest changing the note to state that utility easement shall be provided In satisfaction of City and private utility requirements. It could perhaps be Interpreted that anything less than or greater than 20' is Inconsistent with the ODP. Number: 51 Created: 3/3/2003 Remove the "Arterial Street" label from 1-25 as it is a highway, not a street. Signature to CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report Other Utility Redline Utility Landscape Page I fi y3{ie i i .:s' Project Comments Sheet City of Fort in �+Selected Departments Colls Date: March 5, 2003 Project: PARADIGM PROPERTIES ODP -TYPE 11(LUC) 29-01A All comments must be received by Steve Olt in Current Planning, no later than the staff review meeting: March 05, 2003 Note - Please identify your redlines for future reference Issue Contact: Tom Reiff Topic: General Number: 52 Created: 3/4/2003 Please be aware that comments only refer to the ODP submitted and not the Concept Plan included in the packet. More specific comments regarding the site plans and layout of the internal circulation system will follow with each submitted PDP. Number: 53 Created: 3/5/2003 FYI - CDOT is in the process of entering the environmental planning stages for 1-25 up to SH-14 (Mulberry Street). Please coordinate with CDOT regarding interchange and Prospect Road designs and how they may impact your proposed development and stormwater issues. Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report Other Utility Redline Utility Landscape Page 1 REVISION COMMENT SHEET DATE: February 6, 2003 TO: Engineering PROJECT: # 29-OIA PARADIGM PROPERTIES ODP — TYPE II (LUC) All comments must be received by Steve Olt no later than the staff review meeting: March 5, 2003 ❑ No Comment Problems or Concerns (see below or attached) **PLEASE IDENTIFY YOUR REDLINES FOR FUTURE REFERENCE** CFIEC% HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat — site _ Drainage Rep t _ Other REVISION COMMENT SHEET DATE: August 12, 2003 TO: Engineering PROJECT: #29-01A PARADIGM PROPERTIES ODP — TYPE II (LUC) All comments must be received by Steve Olt no later than the staff review meeting: September 3, 2003 EJNo Comment ElProblems or Concerns (see below or attached) **PLEASE IDENTIFY YOUR REDLINES FOR FUTURE REFERENCE** Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat _Site _Drainage Report _Other _Utility _Redline Utility _Landscape Date BAN City of Fort Collins Project Comments Sheet Selected Departments Department: Engineering Date: September 10, 2003 Project: PARADIGM PROPERTIES ODP -TYPE II (LUC) 29-01A All comments must be received by Steve Olt in Current Planning, no later than the staff review meeting: September 03, 2003 Note - Please identify your redlines for future reference Issue Contact: Marc Virata Topic: General Number: 63 No further comments at this time. Created: 9/10/2003 9 CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report Other Utility Redline Utility Landscape Page l Project Comments Sheet Selected Departments City of Fort Collins Department: Transportation Planning Date: September 4, 2003 Project: PARADIGM PROPERTIES ODP -TYPE II (LUC) 29-01A All comments must be received by Steve Olt in Current Planning, no later than the staff review meeting: September 03, 2003 Note - Please identify your redlines for future reference Issue Contact: Tom Reiff Topic: General Number: 62 Created: 9/4/2003 No further comments on the ODP. Additional comments will follow at the PDP stage. q-yv3 Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report Other Utility Redline Utility Landscape Page 1 PROJECT COMMENT SHEET Current PlanninLy DATE: May 23, 2002 a TO: Engineering Pavement PROJECT: #29-01A Paradigm Properties ODP — Type II (LUC) All comments must be received by Steve Olt no later than the staff review meeting: June 19, 2002 Note - Please identify your redlines for future reference Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat _Site _Drainage Report _Other _Utility _Redline Utility _Landscape AdOUL PROJECT MUM COMMENT SHEET City of FDA Collins Current Plannine DATE: May 23, 2002 TO: Engineering PROJECT: #29-01A Paradigm Properties ODP — Type II (LUC) All comments must be received by Steve Olt no later than the staff review meeting: June 19, 2002 Note - Please identify your redlines for future reference Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat _Site _Drainage Report _Other _Utility _Redline Utility _Landscape C1ty of Fort cotttne DATE: May 23, 2002 " TO: Street Oversizing PROJECT: #29-01A Paradigm Properties ODP — Type II (LUC) All comments must be received by Steve Olt no later than the staff review meeting: June 19, 2002 Note - Please identify your redlines for future reference ,'llc D1 �G 6 Lq�J11EN� / `iJ s�T V�1S2Si2irUCz �,�Qr�� �r 4r�iLa��Areo� . Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat Site _Drainage Report _Other _Utility _Redline Utility _Landscape Project Comments Sheet Citv of Fort Col Selected Departments Department: Transportation Planning Date: June 24, 2002 Project: PARADIGM PROPERTIES OVERALL DEVELOPMENT PLAN, #29-01A All comments must be received by STEVE OLT in Current Planning no later than the staff review meeting: ReviewDate Note - Please identify your redlines for future reference Issue Contact: Tom Reiff Topic: General 19 All access to the site needs to come off of the SE Frontage Road 20 CDOT will need to review and comment on the proposed overall development plan (ODP). There will most likely be multi -modal improvements necessary to the Prospect interchange. Please consult CDOT further to address and coordinate their future plans and upcoming studies regarding the 1-25 corridor. 21 The ODP needs to include a legend with the following elements shown on the ODP; proposed access points off of the frontage road, major pedestrian routes (internal to the site and around the site), major bicycle routes (internal to the site and external around the site), limits of the development, and the 1-25 corridor. Furthermore, the ODP needs to provide the 'location of transportation connections to adjoining properties in such a manner as to ensure connectivity into and through the ODP plan site from neighboring properties for vehicular, pedestrian, and bicycle movement, as required pursuant to Section 3.6.3 (F) and Section 3.2.2 (C) (6)' this is outlined in the City's Land Use Code. 22 The Se Frontage Road and Prospect will require improvements to the Larimer County Urban AreaStreet/Standards, including sidewalks and on -street bikelanes. r ---- �� -�� G Signotare j Date CHECK HERE IF YOU WISH TO RECEIVE GrF Plat Site Drainage ReportOther �J j Utility Redline Utility Landscape Page I Project Comments Sheet Selected Departments City of Fort Collins Department: Engineering Date: June 24, 2002 Project: PARADIGM PROPERTIES OVERALL DEVELOPMENT PLAN, #29-01A All comments must be received by STEVE OLT in Current Planning no later than the staff review meeting: ReviewDate Note -Please identify your redlines for future reference F1X6[y%Jy(i �fsr,gll6} Issue Contact: Marc Virata v%t.�i2r �31i2(Syv Topic: General 10 The Prospect bridge over 1-25 and the operation of this interchange is substandard. From a Transportation Services discussion, this Development is obligated to upgrade -z,-- o S the 1-25/Prospect interchange. The developer should consider perhaps partnering with AFr / other properties in the area to help facilitate the upgrade of the interchange. Discussion between the developer and the City, in conjunction with City discussion with CDOT -Ar,& ew y should take place with regards to the interchange. Access out to Prospect Road directly from the property will not be allowed 12 Eb The roadway on the CDP that connects the eastern and southern edge of the main arc a>v sue,✓nf property should be labeled as a public street. CIF r 13 vti Crn> There may be a benefit in moving the east -west portion of this potential internal street 2uE further north in order to reduce sight distance. - 160( P€ec6ss 70 C �w ✓e' 14 smvc v'2e Sight distance is going to be an issue with any proposed access points. Note that there will be a potential sight distance easement required from the property directly south based upon the proposed street access. (0 �v c Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report X_ Other Utility Redline Utility Landscape Page I 15 Driveway accesses directly to the frontage road will not be allowed from the property (except for the parcel of land on the east side of the frontage road.) All driveways internal to the development should access the internal public street. This should be indicated as such on the ODP. 16 Development of the property will require improvement of Prospect Road (arterial) and the frontage road to standards. e 17 The TIS acknowledged lack of existing bicycle/pedestrian facilities in the area. There may be the need for off -site improvements with development of the property in order to meet level of service criteria. 18 There may need to be additional public streets required within the property (connecting to the public street that runs from the east edge to the south edge of the property) in order to satisfy addressing requirements. Page 2 Project Comments Sheet Selected Departments Citv of Fort Collins Department: Transportation Plann Date: October 28, 2002 Project: PARADIGM PROPERTIES OVERALL DEVELOPMENT PLAN, #29-01A All comments must be received by STEVE OLT in Current Planning no later than the staff review meeting: October 23, 2002 Note - Please identify your redlines for future reference Issue Contact: Tom Reiff Topic: General 42 In addition to the City reviewing the design of the SE Frontage Road, CDOT will also need to review the designs and give their approval. 43 Strike the words "at this time" at the end of note #28. 44 Please be aware that as the PDP proposals are submitted that more detailed analysis of the transportation system will be required. This may lead to off site improvements. 45 Note #10 states that a 15 foot utility easement will be provided on each side of the R.O.W. Please note that only a 9 foot easement is required for commercial local streets. Signature --nv Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report Other , r� Utility Redline Utility Landscape Page 1 f "44 Project Comments Sheet Fo"'�" Selected Departments City of rt Collins 1] Date: October 18, 2002 Project: PARADIGM PROPERTIES OVERALL DEVELOPMENT PLAN, #29-01A All comments must be received by STEVE OLT in Current Planning no later than the staff review meeting: October 23, 2002 Note - Please identify your redlines for future reference Issue Contact: Marc Virata Topic: General 11 Access out to Prospect Road directly from the property will not be allowed. [10/231 The Developer has indicated on Note 28 that access to Prospect Road is not permitted "at this time". Remove "at this time". An ODP is not designed to be "flexible" with regards to access points unless the ODP were to be amended through a resubmittal and approval process. 37 In discussions with CDOT, an additional note should be added noting that the 1-25 northound exit ramp location and alignment will likely shift east with interchange improvements, which could require additional right-of-way from the site. 38 Note number 10 indicates a 15' utility easement alongside internal streets. 9' of utility easement is the minimum required on all streets except Prospect, which is 15'. Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report Other Utilitv Redline Utility Landscape Page I