HomeMy WebLinkAboutWESTCHASE PUD LOT 2 BLOCK 11 GODDARD SCHOOL - Filed DCP-DEV. CONSTRUCTION PERMIT - 2006-12-15City of Fort Collins
Transportation Services
Engineering Department
DEVELOPMENT CONSTRUCTION PERMIT
WV
S
Permit Number: 0 Z q Issuance Date: 2d
Project Name: Goddard School _ m
Project Location: 6427 Carmichael Street _
Permittee: Dave Clark, Clark Construction Co. Inc.
City and developer contacts: See attached Exhibit "A" for names and phone numbers of all
contact persons for this project.
Fees: Penn it Application Fee (paid at the time of application) $ 200.00 (L!d)
Construction Inspection Fee (paid prior to issuance of this permit) $ _— ___711.(f0 _
Total $----270.h0
Development Bond or other approved security:
Amount of security deposited with tlic City to guarantee the completion of all public
improvements tc be constructed as shoe n- on the approved plans for the devclopnte.nt.
$ 900.00
Fonn of st�rutilty deposited with the City:
PERFORMANCE REQUIREMENTS OF TEIS PERMIT:
1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design
drawings and specifications the certification of all materials testing by an Engineer. The Permittee
shall have an Engineer prepare revised design drawings and secure City approvai for all re visions to
the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required
by the City in the Development Agreement, that the improvements are constructed in conformance
with thz approved Utility Plans and the standard, and specifications of the City. The Permittee shall
Provide "as -constricted" plans prepared by air Engineer prior to the City's acceptance of the
constructed public improvements. (All references above to the terms "Project Engineer" and
"Engineer" shall mean a Professional Engineer licensed in Colorado.)
2. All contractors whe perform work on this pre;e.ct must be bonded and licensed in conformance
with City requirements.
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605 • FAX (970) 221-6378
www.fcgov.com
Development Construction Permit, Page 2/5
3. Construction time restrictions:
4. The applicant understands that additional permits maybe required for this development project
and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this project
(utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic
study, drainage report, plat easements and any other official documents), shall be kept on the
development site available for use by City staff doing inspections.
6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or
Section 2.6.3(K) of the Land Use Code, whichever is applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shall expire and the applicant will forfeit the Permit fee paid for this
permit, whereupon the applicant must re -apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The applicant
may apply for an extension by reapplication at least two weeks prior to the expiration date.
Such application shall contain information sufficient to justify the granting of the extension.
An extension may be granted for up to six months.
7. Building permits and certificates of occupancy will only be issued when all conditions contained
in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29-
678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the
Development Agreement does not specify times for completion of public improvements, or if there is
no Development Agreement, then the improvement requirements specified in Section 24-95 of the
City Code shall apply, which provides that construction of all improvements shall be required prior
to the time of issuance of the first building permit.
8. Acceptance by the City of the public improvements shall be after (1) final inspection has been
conducted by the City; (2) punch list items from the final inspection are completed and accepted by
the City; and (3) required certifications from the licensed professional engineer that improvements
are completed to City standards, specifications and approved Utility Plans; and the "as -constructed"
plans have been received and accepted by the City.
9. The warranty on street improvements is for five (5) years from the date of acceptance by the City
of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional
Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use
Code, as applicable.
10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any
planned construction on this project. All required perimeter silt fencing and other erosion/sediment
control best management practices (BMP's) that can be installed prior to construction must be in
Development Construction Permit, Page 315
place and inspected by the City Erosion Control Inspector before any land disturbing activity begins.
11. No work (including grading and construction access) shall be started in State Highway right-of-
way until a permit is issued by the Colorado Department of Transportation to allow such work to
begin.
12. Other conditions:
Permittee's acknowledgment signature:
By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of
the owners of the property (including all owners having legal or equitable interest in the real property, as
defined in Section 1-2 of the City Code; and including common areas legally connected to or associated
with the property which is the subject of this application) without whose consent and authority the
requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City
officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such
property to perform work required of the applicant if the applicant were to fail to perform the required
work. I also acknowledge that I have read this permit document with all its requirements and
conditions, and I agree to all of the terms and conditions so stated in this permit.
Applicant/Project Manager' s Signature: 40JAY14 Date:
Approval for issuance:
City Engineer Approval: Date:
9/�/ 4
(Permit Issuance Date)
Development Construction Permit, Page 415
EXHIBIT "A"
DEVELOPMENT PROJECT CONTACT PERSONS
Project Name:
City Staff Contact Persons:
Development Engineer:
Construction Inspector:
The Goddard School
Marc Virata / City of Fort Collins Engineering
281 N. College Avenue / Fort Collins, CO 80524
970 221-6605
Lance Newlin / City of Fort Collins Engineering
281 N. College Avenue / Fort Collins, CO 80524
970 221-6605
Current Planner: Anne Aspen / City of Fort Collins Current Planning
281 N. College Avenue / Fort Collins, CO 80524
970 221-6750
Water Utilities Engineer: Roger Buffington / City of Fort Collins Utilities
700 Wood Street / Fort Collins, CO 80521
970 221-6854
Erosion Control Inspector: Bob Zakely / City of Fort Collins, 700 Wood
Street, Fort Collins, CO 80521
970 221-6063
Natural Resources: Doug Moore / City of Fort Collins, 281 North
College Avenue, Fort Collins, CO 80522
970 224-6143
Traffic Operations: Eric Bracke / City of Fort Collins, 625 Linden
Street, Fort Collins, CO 80524
970 224-6062
Street closures: Syl Mireles / City of Fort Collins, 625 Linden
Street, Fort Collins, CO 80524
970 221-6815
Transportation Planning: Dave Averill / City of Fort Collins, 215 N
Mason Street, Fort Collins, CO 80524
970 416-2643
Development Construction Permit, Page 515
Forestry:
Tim Buchanan / City of Fort Collins, 281 North
College Avenue, Fort Collins, CO 80522
Light and Power:
Doug Martine / City of Fort Collins, 700 Wood
Street, Fort Collins, CO 80521
970 224-6152
Developer' Contact Persons:
Project Manager/
Wally Gammage
Applicant/Owner:
Carmichael Property, LLC
PO Box 513
Goderich, Ontario
N7A4C4, Canada
519 565-5484
519 766-2018 (cell)
]ever—louise@hotmail.com
Project Engineer:
Tricia Krotech
North Star Design, Inc.
700 Automation Drive, Unit I
Windsor, CO 80550
970 686-6939
970 686-1188 (f)
tricia@northstardesigninc.com
Architect/Planner:
Angie Aguilera
Edge Architecture, Inc.
3702 Manhattan Ave., Suite 101
Fort Collins, CO 80526
970 377-4217
angie@edgeonline.net
General Contractor/Permittee:
David J. Clark
Clark Construction Co, Inc.
2956 Ginnala Dr.
Loveland, CO 80538
970 667-0674
970 567-1101 (cell)
970 663-7384 (fax)
davec@clarkconco.com
Citvof�l_
Date Received/ Paid In 1) q I�
Total Amount Paid tDun .00
Project Name: TE SGP/eo
Project Location: Gt4Z-7 S-re-ea-r
Transportation Development Review Fee
Type of Submittal
Please indicate the type of application submitted by checking the box
preceding the appropriate request(s).
Fee shuctuae amount due
❑ Overall Development Plan (CDP) $500 each _
XFinal Development Plan (EDP)
This fee includes 2 rounds of review $1000 each eo 0
❑ Additional round of review
$ 500 each
❑ Annexation $20 x _ acres
= _+ $250 =
❑ Minor Amendment
$250 each
❑ Major Amendment
S2,500 each
❑ Re -zone
$200 each
❑ Modification to Land Use Code
S200 each
❑ Wireless Telecommunication Equipment (WTE) $65 each
❑ Road Projects _ acres (of roadway) X $250 =
❑ Vacation of Easement(s) "' # of vacations _ X S400 =
❑ Vacation ofRight(s)-of-Way ••• # of vacations _X Sg00 =
❑ Dedication ofEasemeat(s) and/or Right(s)-of--Way •s•
# of dedications X $250 =
"' This fee does not include the cost of filing fees. Filing fees shall be
determined at the time of final document submittal and will be required prior
to filing.
❑ Project Development Plan (PDP) or Basic Development Review Project
requiring Transportation Services Review and/or utility plan review. This fee
includes 3 rounds of review.
Detached Single Family S160 per uunit
_ # of units X $160 =
Multifamily or other residential units $115 per unit
# of units X $115 =
Commercial, Industrial, Retml, and/or Non residential
building square footage $0.25 per square foot
_sq ft X $0.25 = _
Size of the development (area being platted or if not being
platted size of parcel accompanying all development
improvements) $250 per acre _ acres X $ 250 = _
Project fee $2,000 each Um
Total of above amounts
If this fee amount exceeds $30,000 than the fee amount shall be adjusted with
the following formula
$30,000 + Ya (the amount over 30,000
The maximum fee for any residential ONLY project shall be $500 per
residential unit This check should be used to verify the fee amount (does not
apply to mixed -use developments). PDP fee shallbe the lesser of this amount
or the above calculated amount
# of residential units X $500 =
Reduction for affordable housing - a copy of the City letter ratifying/
authorizing the affordable housing shall be provided with this application
Amount of reduction to be applied _
Total owed for PDP S 100n • 9
Date: Oco
Land Use Information:
Total number of single family detached units:
Total number of multifamily/other residential units:
Total number of certified affordable dwelling units (a copy
of the letter/ authorization is required):
Nonresidential building square footage: 0 (c B sq ft
Gross Acreage: a acres
General Information:
OwnersName(s): \n6,wY w,wYtac/N-
(�41LMIGHA-2u ��E e-T/ES
Street address:
I e"oa5ao2o.1ZQa. "P.e9
��c4 Dom/ / ,woa hI7A3Y I
City/Stat mp:
Telephone: 519.7G(o•ZotBFax:61`)-SIaS'•5q el
Applicants/ Consultants Firm Name:
Bl+ut ge5,4Ll
Contact: W k'ITU g i O--oa,-
4803 lyuoVp,Aa.r Dz;vP
City/State/ Zip: Fr. "o I /i u 5 , Ld A05 Z5
Telephone.5. x• z13.757?Fax: 57o• ZZ3 • Ie2-7
Certification:
By signing this permit I acknowledge that I am acting
with the knowledge, consent, and authority of the
owners of the property (including all owners having
legal or equitable interest in the real property, as
defined in Section 1-2 of the City Code; and
including common areas legally connected to or
associated with the property which is the subject of
this application) without whose consent and authority
the requested action could not lawfully be
accomplished. Pursuant to said authority, I hereby
permit City officials to enter upon the property for
purposes of inspection.
Name (please print): 1j �i,-ru —(
Signature: 4
Telephone: 5 7c • Z-z 3. 7 S -7 -7
cc: Christie White, Engineering
Development Review Engnecring
6a
City of Fort Collins
Transportation Development Review Fee
Date Received/ Paid V9 ILO
Total Amount Paid 0 e
Project Name: 5-14'm"
Project Location: e W z-1 S 7eEe-r Date: OS• 09. O(o
Type of Submittal
Please indicate the type of application submitted by checking the box
preceding the appropriate request(s).
Fee structure amount due
0 Overall Development Plan (ODP) $500 each
❑ Final Development Plan (FDP)
This fee includes 2 rounds of review $1000 each
Additional round of review $ 500 each _
❑ Annexation $20 x _ acres = + $250 =
❑ Minor Amendment $250 each
❑ Major Amendment $2,500 each
❑ Re -zone $200 each
❑ Modification to Land Use Code $200 each
❑ Wireless Telecommunication Equipment (WTE) $65 each
❑ Road Projects acres (of roadway) X $250 =
❑ Vacation of Easement(s) "' # of vacations _ X S400 =
❑ Vacation of Right(s)-of-Way "' # of vacations _ X $800 =
Dedication of Easement(s) and/or Right(s)-of--Way "'
# of dedications ZZ X $250 = Sao
"• This fee does not include the cost of filing fees. Filing fees shall be
determined at the time of final document submittal and will be required prior
to filing.
❑ Project Development Plan (PDP) or Basic Development Review Project
requiting Transportation Services Review and/or utility plan review. This fee
includes 3 rounds of review.
Detached Single Family $160 per unit
# of units X $160 =
Multifamily or other residential units $115 per unit
_ # of units X $115 =
Commercial, Industrial, Retail, and/or Non residential
building square footage $0.25 per square foot
sq ft X $0.25 = _
Size of the development (area being platted or if not being
platted size of parcel accompanying all development
improvements) $250 per acre _ acres X $ 250 =
Project fee $2,000 each $2.294
Total of above amounts
,., If this fee amount exceeds $30,000 then the fee amount shall be adjusted with
the following formula:
$30,000 + y, (the amount over 30,000 1 =
The maximum fee for any residential ONLY project shall be $500 per
Cn residential unit. This check should be used to verify the fee amount (does not
apply to mixed -use developments). PDP fee shall be the lesser of this amount
or the above calculated amount.
# of residential units X $500 =
Reduction for affordable housing - a copy of the City letter certifying/
authorizing the atordable housing shall be provided with this application.
Amount of reduction to be applied
Total owed for PDP $ 1500.00
Land Use Information:
Total number of single family detached units:
U;
Total number of multifamily/other residential units:
Total number of certified affordable dwelling units (a copy
of the letter/ authorization is required):
w
Non residential building square footage: SCA
Gross Acreage: acres
General Information:
Owners Name(s): W w wye ' U
Lo"iSC LE vfi� .g
7
Street address: o
/onF �ct�IG . Dom! G.oiaa.to.a �l7A3`�r
City/State/Zip: /
Telephone: 677. 7fo&'2DWax: 571• S(PS`8`l'S
Applicants/ Consultants Firm Name:
3+A 1]E51 a LJ
Contact: W 4-t-r u E `f Dk04- w
Street address:
y1803 k4LtcUVq-ricy Z>¢ Vx-
City/State/ Zip: F r Lo I I i u—, --o 8oS z5
Telephone:'7J e • 7-7-3 •?57-fax:'j?o • 7- 23• /$2 7
Certification:
By signing this permit I acknowledge that I am acting
with the knowledge, consent, and authority of the
owners of the property (including all owners having
legal or equitable interest in the real property, as
defined in Section 1-2 of the City Code; and
including common areas legally connected to or
associated with the property which is the subject of
this application) without whose consent and authority
the requested action could not lawfully be
accomplished. Pursuant to said authority. I hereby
permit City officials to enter upon the property for
purposes of inspection.
Name (please prim): ✓+ice
Signature:
Telephone: 73�•Z23.757-7
cc: Christie White, Engineering
Development Review Engineering
�U
�\y1