Loading...
HomeMy WebLinkAboutNORTHSIDE AZTLAN COMMUNITY CENTER - Filed DCP-DEV. CONSTRUCTION PERMIT - 2006-11-30OCT-09-2006 12:27 PINKRRD CONSTRUCTION P.01i05 DEVELOPMENT CONSTRUCTION PERMIT APPLICATION (2/16/99) For City ase only- Application Number: Application Date: Permit application fee: S. 400.00 INSTRUCTIONS: I, subCompmitletetothe this form (some questions may not apply to you) and attach all necessary documents and Development Engineering Section o:. the City, 2. 1f you have any questions contact the Development Engineer,. at 221-6605. 3, Submit the Application and pay the Application Fre at the fec at the Engineering counter at 281 N. College Avenue. PROJECT I FORMATION: Project Name (as approved by the City): Northside Aztlan Community Center_ Project A.K.A. (Marketing name if different from, Project Name): Project Location: 112 East Willow Fort Collins CO 80524 Property Owner(At the time of this permit issuance): Individual Name: Steve, S,eefeld Company Name: Cib of Frn+r Inns _ Address: PO aox SRO Fort Collins CO 8D= 0580 Phone number(s): Office: 970 221-6227 Cell phone: 970 221-6227 Fax number: 970 221-6534 Email; _sseefeld(Qa fcgov.corn Applicant/Project Manager (The primary contact person :For all matters regarding this project, and the person responsible for all matters referencing "the Develop;r" in the Development Agreement for this project): Individual Name: Steve-See€eld Company Name: ri1­)/ of F�nlline n eodces Address: Box SRO Fort ollin CO AO t1580 ^— Phone number(s): PO Office: 970 221-6227 Cell phone: 970 221-6227` Fax number: 970 221-6534 Email: sseefeld@fcgov,com Services Engineering Department DEVELOPMENT CONSTRUCTION PERMIT Permit Number: _�-�. _ i'csuance Date; /O Y S /� Project Name: — Northside Aztlur? Community Center Project Location: 112 East Willow Permittee: Steve Seete[d- F"P;Ha.o n.,. __, City and developer contacts: See attached Exhibit "A" for names and phone numbers of all contact persons for this project Fees: Permit Application Fee (paid at the time of application) $ 400.00 Construction Inspection Fee (paid prior to issuance of this permit) $ — (fees processed via charge number) Total $ _ 3 OS3.60 Development Bond or other approved securi4,: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. h'/A (City projectl Form of security deposited with the City: N/A PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Pennittee shall provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the constructed public improvements. (All references above to the terms "Project Engineer' and "Engineer" shall mean a Professional Engineer licensed in Colorado.) 2. All contractors who perform work on this project must be bonded and licensed in conforrance with City requirements. 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605 • FAX (970) 221-6378 www.fcgov.com Development Construction Permit, Page 2/5 3. Construction time restrictions: 4. The applicant understands that additional permits maybe required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the permit fee paid for this permit, whereupon the applicant must re -apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29- 678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the Development Agreement does not specify times for completion of public improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit. 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City; (2) punch list items from the final inspection are completed and accepted by the City; and (3) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans; and the "as -constructed" plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. 10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP's) that can be installed prior to construction must be in Development Construction Permit, Page 3/5 Place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. 11. No work (including grading and construction access) shall be started in State Highway right-of- way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: Permittee's acknowledgment signature: By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditions so stated in this permit. Applicant/Project Manager's Signature: ./ Date: i0 -ap(e Approval for issuance: f-,,City Engineer Approval: Date: _i c A s-106 (Permit Issuance Date) Development Construction Permit, Page 415 EXHIBIT "A" DEVELOPMENT PROJECT CONTACT PERSONS Project Name: Northside Aztlan Community Center City Staff Contact Persons: Development Engineer: Construction Inspector: Marc Virata / City of Fort Collins Engineering 281 N. College Avenue / Fort Collins, CO 80524 970 221-6605 Lance Newlin / City of Fort Collins Engineering 281 N. College Avenue / Fort Collins, CO 80524 970 416-2011 Current Planner: Anne Aspen / City of Fort Collins Current Planning 281 N. College Avenue / Fort Collins, CO 80524 970 221-6750 Sanitary Sewer Engineer: Roger Buffington /City of Fort Collins Utilities 700 Wood Street / Fort Collins, CO 80521 970 221-6854 Erosion Control Inspector: Bob Zakely / City of Fort Collins, 700 Wood Street, Fort Collins, CO 80521 970 221-6063 Traffic Operations: Eric Bracke / City of Fort Collins, 625 Linden Street, Fort Collins, CO 80524 970 224-6062 Street closures: Syl Mireles / City of Fort Collins, 625 Linden Street, Fort Collins, CO 80524 970 221-6815 Transportation Planning: Dave Averill / City of Fort Collins, 215 N Mason Street, Fort Collins, CO 80524 970 416-2643 Forestry: Tim Buchanan / City of Fort Collins, 281 North College Avenue, Fort Collins, CO 80522 Light and Power: Doug Martine / City of Fort Collins, 700 Wood Development Construction Permit, Page 515 Street, Fort Collins, CO 80521 970 224-6152 Developer' Contact Persons: Project Manager/Owner Steve Seefeld Applicant/Developer: City of Fort Collins Operation Services PO Box 580 Fort Collins, CO 80522 970 221-6227 970 221-6534 (fax) sseefeld@fcgov.com Project Engineer: Tricia Kroetch North Star Design Inc. 700 Automation Drive, Unit I Windsor, CO 80550 970 686-6939 970 686-1188 (fax) tricia@northstardesigninc.com General Contractor: Jack Quandt Pinkard Construction Company 9195 West 6`h Avenue Lakewood, CO 80215 303 345-2854 303 434-0501 (cell) 303 345-2954 (fax) lack.quandtAl2inkardcc com Planner: Shaun Moscrip Aller Lingle Architects P.C. 712 Whalers Way, Suite B-100 Fort Collins, CO 80525 970 223-1820 970 223-1833 (fax) smoscrip@aller-lingle.com u It m ?" E6' �g jw 1N Icl Ig m- 1m u t2 I a 18 18 4 a; I a I ': I Zu ;'u 'o m Z ' f�> 00-u0U! *T3G3?!-1 to 9 01Atn V ».,a , ovmmcm x:�m0) mmm07m 0) D 'OrONz _< vy, N c07i m a sm m �'A so m AfAy Z mD m S.m t1°m� v�o? s 0' oi° D < �C) t Om to ' �a�' mm mma m�N fD�cp `" mm D1 iD-� a D3 ;0 CD >f 9mm ad2 aF mr-1 r (D m 3 n O ~� m' an d n� 3� 0 �m �N m o� n �WZ mD m0 �,c mm 2 law ? AOr I m 2 0 $ m < n (a 0 y r F a 3 2 m z N m m y 0 c Er L �� cmm y� nc N z m i G) ��7n1 ffnn ��Tn1 nn nr1 mi� Vd r <<n M7<W ciCifiii(1CiC)T7mm 0C){{I1i7 yi O y S x 2 2 2 2 2 2 2 C y z 9... m In gm;_. z0 m G):j �AC1 Z y v Q D; i D curio<m im m m Gz1 o' mm i o 0)<o0) \ (g(f.yypp 1( m p' 0VN0)WW�NA��W(�0 O�OOOy A m U� 1IWf)D6000Z yT 0.=:' m W Co Z <A ito r Oi D-piy c! <mymzi O A W 69 [�J� EA fill W �. G 3 C 0 C m enwc�"'i�v-�+��o omon�ito00 c�'A iivi [nv+viv+6969 jDmZpi _ ow 0aco-4o 000000o NO o0000o im iZC p 0-400000 0000000 00 ...... = ocn 000cn o 0000000 00 000000 m m m _ m 0 -n CA 0 r < 69 fA fA fA En fA �' fA [n fA `-" z m Di.. (ANEANA W +�N A : 0) V tD tD(DO V N0)co CA O O i 69 O00 W 0) O OOO 00 EAO O O69 lflHNfA 6969 O O 00 O O O O O O O O O 0.0 O O O O O O C 3-- 00o 0000000 00 ooc000 ocn000�no 0000000 00 00000o m 3 Amv z =<mo i fA fA fA mOM1 0 CA m p N fA fA fA 69 6N W W W V 0 v V 6A fA fA O o 69 V! fA fA 0 z z O O O O f T N 0 W O O O O O W W W W O. 0 0 0 0 V V V o o N (1 V V rM-��: N N OOO (T OOOOO OO OOO OOOOOO Z my0 v m r Q t� x C p o A 9111 V Z 44 m �'9 N ° (AO VO O OamfA fA E969 fAo worn W w 0000 0�i oo000o 000 0 00000000000 00a 00 00000