Re: Bellwether Farm
Doug
This letter is a follow-up to our phone conversations on August 10, 2004 and today
regarding certain "boiler plate" comments (Nos. 30 and 31) in the August 9, 2004
Conceptual Review comments letter from Ted Shepard to Linda Ripley and myself
pertaining to the preparation of a development submittal for the `Bellwether Farm"
property
I understand from you that neither an Ecological Characterization Study nor a sensitive
plant species study will be required for this project. Additionally, I understand that a 50-
foot buffer as measured from the top of the bank for New Mercer Ditch will not be
required on the north side of the ditch where there will be a 20 foot ditch maintenance
road between the developed area and the ditch bank.
As I indicated to you, as a result of meetings between both Glen Schlueter (Storm Water
Department) and Dave Averill (Transportation Department) and myself to discuss this
project, my current intent is to dedicate to the City the entire five (5) acre floodplain/
floodway portion of this property on the south side of the ditch to accommodate a City
bike trail and a regional storm drainage channel. A "temporary" detention pond
associated with this project will also be in this south portion and be replaced by the
channel in the future. Any non-native vegetation that is removed as part of the
construction of this detention pond will be restored with native vegetation.
I appreciate your attention to this project and your assistance with the preliminary plan
submission.
Sincerely,
Lester M. Kaplan
cc. Linda Ripley, V-F Ripley Associates
Mike Brake, JR Engineering
Ted Shepard, City Planning
Susan Joy, City Engineering
5
Ms. Susan Joy februar� l5 10
Cuy of Fort Collins Engineering Dept 05
Page ! of I
05
February 15, 2005
Ms. Susan Joy
CITY OF FORT COLLINS ENGINEERING DEPARTMENT
PO Box 580
Fort Collins CO 80522
RE: Bellwether Farm — Variance request for utility easement
Dear Ms. Joy:
The intent of this letter is to request a variance of approximately 231' of the 9' utility
easement located in the southeast portion (see hatched area on exhibit A) of Bellwether
Farm.
Support for the variance described above is discussed in the line items listed below:
1) Preliminary discussions with the various utilities have shown no need for the
easement in that area and they have given their verbal approval based on the
information presented to them.
2) Grading issues along that curve require a retaining wall where the utility easement
typically would be located.
3) There will not be any homes constructed in that area.
If you have any questions or comments, or need additional information, please do not
hesitate to contact our office. Thank you in advance for your time and cooperation.
Sincerely,
JR ENGINEERING, LLC
Lee W. Watkins, P.E.
Project Manager
cc: Sandy McFeron
Les Kaplan
Enclosure
• X:13940000.aIP39411001Drawings13941100dhsl.dwg, Model, 2/14/2005 2:13:04 PM, malveym
� 0
O
0
08
�0
r
D
z
a7
0
Jtp O
T
N00'07'4
� 41.84'
/ Ac
�E���✓elO4'� �r�
Ex1���t.9
SR Eny»Ger��
ool N00'07'40"E 99.00'
26.50' I _T 26.50' to 7
I1 (-n. N ?
o f can W
Vi W
N00'07'40"E 99.00'
--j
c
m c
rn m
O
V
Cn i j N
�;--L-------
84.00'
C
m 00
+� v
�j 78 � �8 • 0
N3
op F oa.�
7, A_
Imago Enterprises, Inc.
140 Palmer Drive • Fort Collins • Colorado 80525
Phone: (970) 226-6819 Fax: (970) 207-9256 Email: lesterkaplan@cwmcast.net
January 12, 2005
Susan Joy, Development Review Coordinator
Department of Engineering
City of Fort Collins
281 North College Avenue
Fort Collins, CO 80524
Re: Bellwether Farm
Susan:
I have your January 11, 2005 email to Joe Sparone with J.R. Engineering regarding "that
funny little road" in the NE corner of the property that provided access to the mobile
home that has been removed.
I concur with you that this "road" has not been dedicated to either the city or the county. I
doubt, as you suspect, that this road is owned by New Mercer Ditch. The only
relationship it has to the ditch is that it veers off from the ditch road. This is a very
unusual situation in that the portion of the ditch road between W. Vine and the
Bellwether Farm property has become New Mercer Drive in the County.
My guess and that of Stewart Surveying is that for years this property was considered by
the county to have public access from New Mercer Drive that dead ends at the property.
The "road" on the property is simply a long driveway beginning at the end of New
Mercer Drive and having provided access to the removed mobile home.
There would be absolutely no use for this "road" by the ditch company, in this "road"
does not parallel the ditch, but rather veers off from the ditch road.
This is not a "road" but a driveway, with no public dedication and never having been
used by the ditch company. I suggest that we include the vacation of any access road on
the property within the standard note on the plat addressing the vacation of other
unnecessary easements, including the gas line easement.
Sincerely
Lester M. Kaplan
cc. Joe Sparone
ENGINEERING DEPARTMENT
Post Office Box 1190
Fort Collins, Colorado 80522-1190
(970)498-5700
FAX (970) 498-7986
September 1, 2005
Susan Joy
City of Fort Collins
Engineering Department
281 North College Ave
Fort Collins, CO 80522
Re: Improvements to Taft Hill Road and Vine Drive
Dear Susan,
The intent of this letter is to confirm Larimer County's commitment to making certain road improvements
to Vine Drive west of Taft Hill Rd. We currently are in the preliminary design phase for improvements to
Taft Hill Rd from Laporte Avenue north to the Poudre River. As part of our project, it is our plan to
improve the intersection of Taft Hill and Vine Drive. These intersection improvements will extend west
on Vine Drive to the existing structure over the New Mercer Canal.
Per Kyle's and my discussions with you, it is our understanding that the proposed Bellwether
development is being required to improve Vine Drive from N. Briarwood Road east to Taft Hill to a
minimum of 36' wide paved roadway. We are willing to commit to making these improvements from N.
Briarwood Rd to Taft Hill as part of our project, rather than the developer making the improvements, with
the following understanding:
• The developer will pay to Larimer County the amount necessary to make the improvements from
N Briarwood to the New Mercer Canal. The developer's engineer will provide the County with a
design and a cost estimate that we will need to approve for this to happen.
• The developer will provide any and all design information that they have for this section of Vine
Drive in an electronic format acceptable to the County.
In return, the County will commit to making the improvements to Vine Drive by the end of the
construction season in 2008 regardless if our currently planned improvement project moves forward or
not.
If you have any questions please give me a call at 498-5730.
Sincerely,
Rusty McDaniel, P.E.
Assistant County Engineer
City of Fort Collins
281 North College Avenue
P.O. Box 580
Fort Collins, CO 80522-0580
(970)221-6605
Memorandum
Date: February 22, 2005
To: �4S I lam- v�'1 DA h-1
From: Susan Joy, Development Review Engineer
RE: VARIANCE REQUEST TO ELIMINATE A PORTION OF UTILITY EASEMENT
Attached for your review and comment is a variance request and sketch by the Applicant
showing Bellwether Farm, located on the south end of Briarwood, a project currently in the
development review process. On the southeast comer of the development, a portion of the
nine (9) foot utility easement as shown in attached Exhibit `A', is proposed not to be
dedicated. The Applicant is requesting that the easement be eliminated in this area because
grading issues require a retaining wall where the utility easement would typically be located.
Since no homes will be going in that area, no utility services or easements will be required
for that stretch of the road. In addition, the Applicant has met with the affected utilities prior
to this official variance request and a verbal approval has been given from each thus far.
Also included with this memorandum is a copy of the applicant's request.
Please sign and return any
Department by March 8, 2002,
be assumed that you have no
contact me at 970/221.6605, ext.
V No problems
comments to Susan Joy in the Development Review
If no correspondence has been returned by this date, it will
objections to the proposed vacation. Please feel free to
7656 if you have any questions. Thank you.
Problems/Concems as follows:
281 North College Avenue
P.O. Box 580
Fort Collins, CO 80522-0580
(970)221-6605
Memorandum
Date: February n22,20005
To: -Dot)6 r Y 1N2;t tiles
From: Susan Joy, Development Review Engineer
RE: VARIANCE REQUEST TO ELIMINATE A PORTION OF UTILITY EASEMENT
Attached for your review and comment is a variance request and sketch by the Applicant
showing Bellwether Farm, located on the south end of Brianaood, a project currently in the
development review process. On the southeast comer of the development, a portion of the
nine (9) foot utility easement as shown in attached Exhibit 'A', is proposed not to be
dedicated. The Applicant is requesting that the easement be eliminated in this area because
grading issues require a retaining wall where the utility easement would typically be located.
Since no homes will be going in that area, no utility services or easements will be required
for that stretch of the road. In addition, the Applicant has met with the affected utilities prior
to this official variance request and a verbal approval has been given from each thus far.
Also included with this memorandum is a copy of the applicant's request.
Please sign and return any comments to Susan Joy in the Development Review
Department by March 8, 2002. If no correspondence has been returned by this date, it will
be assumed that you have no objections to the proposed vacation. Please feel free to
contact me at 970/221.6605, ext. 7656 if you have any questions. Thank you.
/ No problems P/
Problems/Concerns as follows:
281 North College Avenue
P.O. Box 580
Fort Collins, CO 80522-0580
(970)221-6605
Memorandum
Date: February 22, 2005
To: a"lS--, lam,f
From: Susan Joy, Development Review Engineer
RE: VARIANCE REQUEST TO ELIMINATE A PORTION OF UTILITY EASEMENT
Attached for your review and comment is a variance request and sketch by the Applicant
showing Bellwether Farm, located on the south end of Briarwood, a project currently in the
development review process. On the southeast corner of the development, a portion of the
nine (9) foot utility easement as shown in attached Exhibit 'A', is proposed not to be
dedicated. The Applicant is requesting that the easement be eliminated in this area because
grading issues require a retaining wall where the utility easement would typically be located.
Since no homes will be going in that area, no utility services or easements will be required
for that stretch of the road. In addition, the Applicant has met with the affected utilities prior
to this official variance request and a verbal approval has been given from each thus far.
Also included with this memorandum is a copy of the applicant's request.
Please sign and return any comments to Susan Joy in the Development Review
Department by March 8, 2002. If no correspondence has been retumed by this date, it will
be assumed that you have no objections to the proposed vacation. Please feel free to
contact me at 970/221.6605, ext. 7656 if you have any questions. Thank you.
No problems
Problems/Concerns as follows:
City of Fort Collins
281 North College Avenue
P.O. Box 580
Fort Collins, CO 80522-0580
(970)221-6605
Memorandum
Date: February 22, 2005
To:
From: Susan Joy, Development Review Engineer
MAR 0 2 2005
RE: VARIANCE REQUEST TO ELIMINATE A PORTION OF UTILITY EASEMENT
Attached for your review and comment is a variance request and sketch by the Applicant
showing Bellwether Farm, located on the south end of Briarwood, a project currently in the
development review process. On the southeast corner of the development, a portion of the
nine (9) foot utility easement as shown in attached Exhibit 'A', is proposed not to be
dedicated. The Applicant is requesting that the easement be eliminated in this area because
grading issues require a retaining wall where the utility easement would typically be located.
Since no homes will be going in that area, no utility services or easements will be required
for that stretch of the road. In addition, the Applicant has met with the affected utilities prior
to this official variance request and a verbal approval has been given from each thus far.
Also included with this memorandum is a copy of the applicant's request.
Please sign and return any comments to Susan Joy in the Development Review
Department by March 8, 2002. If no correspondence has been returned by this date, it will
be assumed that you have no objections to the proposed vacation. Please feel free to
contact me at 970/221.6605, ext. 7656 if you have any questions. Thank you.
x No problems ),Q —O,,P, 2-/2-8/0S
Problems/Concerns as follows:
In
City of Fort Collins
281 North College Avenue
P.O. Box 580
Fort Collins, CO 80522.0580
(970)221-6605
Memorandum
Date: February 22, 2005
To: 1&644
From: Susan Joy, Development Review Engineer
SON C 0 dVW
RE: VARIANCE REQUEST TO ELIMINATE A PORTION OF UTILITY EASEMENT
Attached for your review and comment is a variance request and sketch by the Applicant
showing Bellwether Farm, located on the south end of Briarwood, a project currently in the
development review process. On the southeast corner of the development, a portion of the
nine (9) foot utility easement as shown in attached Exhibit 'A', is proposed not to be
dedicated. The Applicant is requesting that the easement be eliminated in this area because
grading issues require a retaining wall where the utility easement would typically be located.
Since no homes will be going in that area, no utility services or easements will be required
for that stretch of the road. In addition, the Applicant has met with the affected utilities prior
to this official variance request and a verbal approval has been given from each thus far.
Also included with this memorandum is a copy of the applicant's request.
Please sign and return any comments to Susan Joy in the Development Review
Department by March 8, 2002. If no correspondence has been returned by this date, it will
be assumed that you have no objections to the proposed vacation. Please feel free to
contact me at 970/221.6605, ext. 7656 if you have any questions. Thank you.
/� No problems
Problems/Concerns as follows: