HomeMy WebLinkAboutTHUNDERBIRD ESTATES SIXTH DRAKE SHOPS - Filed DCP-DEV. CONSTRUCTION PERMIT - 2006-11-15DEVELOPMENT CONSTRUCTION PERMIT APPLICATION (1/16/06) For City use only: Application Number. 0�44 Application Date: Permit application fee: $ 400.00 INSTRUCTIONS: 1. Complete this form (some questions may not apply to you) and attach all necessary documents and submit to the Development Engineering Section of the City. 2. If you have any questions contact the Development Engineer, , at 221-6605. 3. Submit the Application and pay the Application Fee at the fee at the Engineering counter at 281 N. College Avenue. PROJECT INFORMATION: Project Name (as approved by the City): Sinclair Redevelopment, College & Drake, The Drake Shoppes PDP Final Plans- Type 1 Project A.K.A. (Marketing name if different from Project Name): Drake Vitamin Shoppes_ Project Location: _2600 College Property Owner (At the time of this pemrit issuance): Individual Name: Ion Hauser Company Name: Drskp. Vits in Shnppeq r r C Address: 600 17'" St Suite 700 South Denver. CO 80202 Phone number(s): Office: 303-825-8500 Cellphone: Fax number: Email: _hauser@drakeres.com Applicant/Project Manager (The primary contact person for all matters regarding this project, and the person responsible for all matters referencing "the Developer" in the Development Agreement for this project): Individual Name: Company Name : r,_-'-n n P-' F rate c n es Address: 000 17s' Suite 700 South Denver_ CO 80202 Phone number(s): Office: 303-825-5515 Cellphone: 303-710-3740 Fax number: 303-825-7200 Email: craig@drakeres.com Development Construction Permit, Page 4/6 EXHIBIT "A" DEVELOPMENT PROJECT CONTACT PERSONS Name, address and numbers Project Name: Drake Shops Project A.K.A.: Sinclair Redevelopment / Lot 1 Thunderbird Estates City Staff Contact Persons: Development Engineer: Marc Virata 281 North College Avenue, Fort Collins, CO 80524 970 221-6605 Construction Inspector: Lance Newlin 281 North College Avenue, Fort Collins, CO 80524 970 416-2011 Current Planner: Ted Shepard 281 North College Avenue, Fort Collins, CO 80524 970 221-6750 Water Utilities Engineer: Roger Buffington 700 Wood Street, Fort Collins, CO 80521 970 221-6854 Erosion Control Inspector: Bob Zackley 700 Wood Street, Fort Collins, CO 80521 970 224-6063 Natural Resources: Doug Moore 281 North College Avenue, Fort Collins, CO 80524 970 221-6143 Traffic Operations: Eric Bracke 625 Ninth Street, Fort Collins, CO 80524 970 224-6062 Street closures: Syl Mireles 625 Ninth Street, Fort Collins, CO 80524 970 221-6815 Development Construction Permit, Page 5/6 Transportation Planning: David Averill 215 North Mason Street, Fort Collins, CO 80524 416-2643 Forestry: Tim Buchanan 281 North College Avenue, Fort Collins, CO 80524 970 221-6641 Light and Power: Doug Martine 700 Wood Street, Fort Collins, CO 80521 970 224-6152 Developer' Contact Persons: Developer/Owner: Applicant/Project Manager: General Contractor: Jon Hauser Drake Vitamins LLC 600 17t' St. Suite 700 Denver, CO 80202 303 825-8500 303 825-7200 (fax) John Craig Drake Real Estate Services 600 17'h St. Suite 700 Denver, CO 80202 303 825-5515 303 710-3740 303 825-7200 (fax) Jay Meluey MPB Contractors, Inc. 15600 E. 19d' Avenue, Unit H Aurora, CO 80011 303 343-4318 303 888-7699 (cell) jayrneluey@mpbcontractors.com Development Construction Permit, Page 6/6 Architect/Planner: Andrew Lemmer Design Edge Architects PC 1820 15t' Street Unit B Denver, CO 80202 303 260-7277 a.lemmer@de-arch.com Project Engineer: Joe Sparone JR Engineering 2620 E. Prospect Road, Suite 190 Fort Collins, CO 80525 970 491-9888 970 491-9984 (fax) m — P Cb__ECE AVENUS 3 m g g .p VIT S Q I a s c a iEo 1 00 Z C) _ a§ o A rox qq I r�N m pp� � 6 $ VdV €S 2 dall i VJ n 94 11 va 3333; CAI it A [INi ya 1 6.6 � j! !o otvg 6 O Sg§AA s 3q�9 AT OMM I Ile p ss nn 9 090 p 62 Rd Nf Y 0 �0 f �r or m m d D n � S v i Ne a�{tp�a DRAKE SHOPS !. SW CORNER OF �,�;��] rr SITE PLAN �. ;!115'P t i DRAKE & COLLEGE P4aP FORT COLLINS.,OLORADO1� i 1 P 6 Q�i R R D m a - -- - - p R EOEEEGE AVENGE 3 Eg e .. --, i 4 U �v e ) m v i NRk 3 R p� DRAKE SHOPS ig s ! 3 2800 OOLLEOE AVE. � a[ 9 [[ FORT COLLIM COLORADO •�i' {it$e 4a� 1� i� 1oP11 g[g gg �ER/IO ESTAT Transportation Development Review Fee Date Received/Paid(, Total Amount Paid f5ipiti J . e CrlvofPartCoAlns Project Name: _ Project Location: hL/!er c ! lc, Gr= r,,i( Date: V/d 'Q! Type of Submittal Please indicate the type of application submitted by checking the box preceding the appropriate request(s). Fee structure amount due ❑ Overall Development Plan (ODP) $500 each _ 0 Final Development Plan (FDP) This fee includes 2 rounds of review $1000 each 0 Additional round of review ❑ Annexation S20 x_acres- 0 Minor Amendment ❑ Major Amendment ❑ Re -zone ❑ Modification to Land Use Code S 500 each _+5250 = _ $250 each $2,500 each $200 each _ 5200 each ❑ Wireless Telecommunication Equipment (WTE) $65 each ❑ Road Projects _ acres (of roadway) X $250 = C Vacation of Easement(s) -'• # of vacations _ X $400 = ❑ Vacation ofRight(s)-of-Way ••• # of vacations_ X$800= jY Dedication ofEasemwt(s) and/or Right(s)-of-Way •'• # of dedications mZ X $250 = 0 5Q0 ••• This fee do" not include the cost of filing fees. Filing fees shall be determined at the time of fmal document submittal and will be required prior to filing. Project Development Plan (PDP) or Basic Development Review Project requiring Transportation Services Review and/or utility plan review. This fee includes 3 rounds of review. Detached Single Family $160 per unit _#of units X$160= _ Multifamily or other residential units 5115 per unit # of units X Sl IS = Commercial, Industrial, Retail, and/or Non residential building square footage $0.25 per square foot _sq R X 50.25 - Size of the development (area being platted or if not being platted size of parcel accompanying all development improvements) $250 per acre _ acres X S 250 = Project fee $2,000 each Sj= Total of above amounts If this fee amount exceeds $30,000 then the fee amount shall be adjusted with the following formula: $30,000 + h (the amount over 30,000 - The maximum fee for any residential ONLY project shall be $500 per residential unit This check should be used to verify the fee amount (does not apply to mixed -use developments). POP fee shall be the lesser of this amount or the above calculated amount. # of residential units X $500= Reduction for affordable housing - a copy of the City letter certifying/ authorizing the affordable housing shall be provided with this application. Amount of reduction to be applied Total owed for PDP S_S .00 Land Use Information: Total number of single family detached units: Total number of multifamily/other residential units: _ Total number of certified affordable dwelling units (a copy of the letter/ authorization is required): Non residential building square footage: sq it Gross Acreage: acres General Information: OwnersName(s): 'D eke, VAf#f;AS Ll-c- Street address: enti fa6,k.'iW eeS Vo17 l7 5'{et•P..f a€ IoD _3014A_ City/State/Zip: j"6,Al?d Z0 ZD Z Telephone: 303t15.960 Fax: ff' S DD Applicants/ Consultants Firm Name: Contact: Street address: !`c, City/State/Zip: F� le % /n s Telephone: - f`cI Fax: Certification: By signing this permit I acknowledge that 1 am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection. Name (please print): Signature: Telephone: 41` cc: Christie White, Engineering Development Review Engineering Services Engineering Department MEMORANDUM TO: Drake Vitamins, LLC FROM: Lance Newlin, Construction Inspector/ Vicki Czaplewski DATE: 4/30/2007 RE: Initiate Escrow Account This memo is to acknowledge the receipt of escrow funds in the amount of 2572.00 for the following: 2600 S. College Ave.,Drake Shoos for the completion of When improvements to the Right -of -Way are completed, please call our inspection recorder at 221-6609 to request an inspection (please allow 24 hours for the inspection to take place). Once the improvements have passed inspection, the funds in escrow will be released to you. Escrow funds have been received from: Drake Real Estate Services LLC 600 17th Street, Suite 700 South Denver, CO 80202 3038258500 cc: Initiate Escrow file Subdivision Fiiq Judi Vos, Cash Systems Coordinator Permit#A021-06 Initiated by: Lance Newlin 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605 • FAX (970) 221-6378 www.fcgov.com Permittee (Person who is to sign the Development Construction Permit): Individual Name: Jon Hauser Company Name: Drake. Vitamin Chn_nrnrrc T T r Address: 600 17'b St Suite 700 South Denver. CO 80202 Phone number(s): Office: 303-825-8500 Cellphone: Fax number: 303-825-7200 Email: _hauser@drakeres.com Project Engineer (A Colorado licensed professional engineer who is the civil engineer, the person, responsible for the design of this project, responsible for certification that improvements are constructed in accordance with approved plans, responsible for making revisions to plans with City approval and for providing as -constructed plans): Individual Name: Joe Snarone Company Name: JR Engineering Address: 2620 F Prospect t Rd r$to [90 Fort Collins rO 90525 Phone number(s): Office: 970.491.9888 Cellphone: Fax number: Email: jsporone@jrengineering.com Professional License Number: 39848 Architect/Planner (The person responsible for the site design of this project) Individual Name: Andrew Lemmer Company Name: T)PC•gn Frige ArybiteNg PC Address: 1820 15" St Unit B. Denver. CO 80202 Phone number(s): Office: 303-260-7277 Cellphone: Fax number: Email: a.lemmer@de-arch.com Developer (The party or parties referenced in the Development Agreement who are responsible for the Developer's obligations contained in the Agreement —add additional names below): Individual Name: Jon Hauser Company Name: . tAmin ehappee T T C Address: 600 17" St Suite 700 South Denver. CO 80202 Phone number(s): Office: 303-825-8500 Cellphone: Fax number: _303-825-7200 Email: _hauser@drakeres.com General Contractor (The contractor in overall charge of the public infrastructure construction): Individual Name: Jay MCI= Company Name : MPR (7nntrnp.Mrq. T Address: 15600 E 191 Ave Unit H. Aurora CO 8001 I Phone number(s): Office: (303) 343-4318 Cellphone: (303) 888-7699 Fax number: Email: LaMeluey@mnbcontractors.com If you have no General Contractor, list all other contractors below. Grading contractor: Individual Name: Company Name : Address: Phone number(s): Office: Cellphone: _ Fax number: Email: Utility contractor: Individual Name: Company Name: Address: Phone number(s): Office: _ Cellphone: _ Fax number: Email: Concrete contractor for flat work: Individual Name: Company Name : Address: Phone number(s): Office: Cellphone: _ Fax number: Email: Concrete contractor for structures: Individual Name: Company Name: Address: Phone number(s): Office: Cellphone: _ Fax number: Email: Paving contractor: Individual Name: Company Name: _ Address: Phone number(s): Office: _ Cellphone: _ Fax number: Email: Landscape contractor: Individual Name: Company Name: Address: Phone number(s): Office: Cellphone: _ Fax number: Email: Other contractors and parties involved in the project: SUBMIT THE FOLLOWING ITEMS (Required for all projects): cope rte an Proposed Project Schedule Project quantities an cost estimate for all of the public improvements to be constructed. In addition, include all private improvements that are required to be inspected by the City Construction Inspectors. This information must be submitted in the format shown on the attached form titled "Project Quantities and Cost Estimate Sheet." ADDITIONAL SUBMITTALS (Required if checked): ❑ Traffic control plan(s) for the project ❑ Proposed haul routes shown on a City map ❑ Shop drawings ❑ Other CONSTRUCTION COORDINATION MEETING: A construction coordination meeting to discuss plans and special requirements for your project, is required for all development projects. The people required to attend the meeting are the Project Manager, Project Engineer, Developer, Architect/Land Planner and General Contractor (if no General Contractor, representatives for each of the contractors expected to work on this project) People to Attend: List the peoples names and titles for those who will attend the pre - construction meeting: Name Jay Meluey John Craig Joe Sparone Andrew Lemmer Title General Contractor Developer Civil Engineer Architect ESTIMATED COST OF INFRASTRUCTURE IMPROVEMENTS: Provide the estimated value of all public infrastructure improvements that will be constructed and accepted by the City to own and maintain. In addition provide the value of all private infrastructure improvements that the City will inspect and require certification for. The estimate shall be in the same format as the attached sheet titled "Project Quantities and Cost Estimate Sheet." Public infrastructure, estimated cost: $9482.84 Private infrastructure, estimated cost:$3375.00 I certify that the information on this permit application along with the required additional submittals are true and correct to the best of my knowledge, and that in filing this application I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit C'ry officials to enter upon the property for purposes of inspection and, if necessary, to enter upon soliproperty to per rm work required of the applicant if the applicant were to fail to perform the requir fork. n Applicant Signature: 6-15-06 f G O W N+ 0 0� N V N N A In 1:+ 0 0 m N N A fi N+ Z• 0 D v o O v 0 0 �l 3 «?t w -i In D V *^ y ..{ O 9 p, m y N m N [n N 7 N N, C bl( S rmn m m n T m 5 m m �. r° m _. m> > o -, A: N:.y c -I -I m �i Lbw N m CD m n� �� W m p wm CD :F; a O m ' w x ^ 3 m y m 2 n m m r �3 m 0. 3 yam 3c0 ZA 'o m m m �01 0 � TWZ � a n< w 5F m 0) m m 0 e mn 'm m 3 'o f ti T AZ v 2 CD 'mq v 0 y C N m y y Ap n � OZ'. 1 Q w �-i1 ffnn fRn1 ffnn fRn1 O K fowrtor Cn Co DDDDDDrrrr yy(�()rr ' S+'t _ < ;� Ul T ?1 ;C ?7 () (7 Ci Ci C) Ci �I . . . 0 0 -({ ?I .n y p, � � Z 222222 22 E *�,,, s Zy gm 77m z 0< c y mm� �...p r z oCO 0 01 N N al O N � 0" 0 0 0 O A 0 0 -+ 0 0 0 (n 0 m 0�m �rn <pmiMm`0' c £a p Mii a4g0"_(A, m m0 69 f�0 EA 69 m v fA iA EA fA b9 W O EA N !A 0 EA O 69 EA EA N N w N di fA fA 69 fA _ 000 W O) O OOOOOON 00 (n O o000T O -q m O GGO00 A OOC 0000 C 00 00 G GOO J""'i'191 o O O O O O O V O O O O O o O O O o O O O O O O m s� m: t m 2 ' , 9 22 Ddi EA EA m w ao o w w w EA o to cn to EA to to fA vi 000rno rn o0000 0000 0 �r'1, 3 GGGoG GGGGO GGGO' G � SQ y o0000 o0000 00000j' m, m' m h i fA �p c C69 fA fA'w <A w w W V O v V EA f 16M to fA EA M C 00 O (T U� Ut O co 00000 -W woo i• ? A O O O? 0 0 0 0 0 0 0 V V �I - CD Ill N V V r CA l f 71 O O O (AO O O O O o O O O O O O O O O 0 lin i. m Z c 0 m wW�000 EAwfAb9(A �� ov�vica00 p G o w o 0 0 o cr o 0 0 0 o w o 0 0 0 0 D c G o G G' G G G G G' c 00000 00000 00 000000 'O 0 m 1 AD z m N 0 n O N —I m 1 m m y 2 m Transportation Services Engineering Department DEVELOPMENT CONSTRUCTION PERMIT Permit Number: A-021—D(e Issuance Date: 'i 1 1--.5 Project Name: Drake Shops Project A.K.A.: Sinclair Redevelopment/Lot I Thunderbird Estates Project Location: southeast corner of College Avenue and Road Permittee: City and developer contacts: See attached Exhibit "A" for names and phone numbers of all contact persons for this project. Fees: Permit Application Fee (paid at the time of application) $ 400.00 Construction Inspection Fee (paid prior to issuance of this permit) $ 453.00 a rc Total $ 853.00 Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $ 12,858.00 Form of security deposited with the City: Letter of Credit PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for ail revisions to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the constructed public improvements. (All references above to the terms "Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.) 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605 • FAX (970) 221-6378 www.fcgov.com Development Construction Permit, Page 2/6 3. Construction time restrictions: 4. The applicant understands that additional permits maybe required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the permit fee paid for this permit, whereupon the applicant must re -apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29- 678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the Development Agreement does not specify times for completion of public improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit. 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City; (2) punch list items from the final inspection are completed and accepted by the City; and (3) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans; and the Aas-constructed@ plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. 10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any Development Construction Permit, Page 3/6 planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP's) that can be installed prior to construction must be in place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. 11. No work (including grading) shall be started in State Highway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: Permittee's acknowledgment signature: By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditions so stated in this permit. Applicant/Project Manager' s Signature• Date: Approval for issuance: City Engineer Approval: Date: 7/ (Permit Issuance Date)