HomeMy WebLinkAboutTHUNDERBIRD ESTATES SIXTH DRAKE SHOPS - Filed DCP-DEV. CONSTRUCTION PERMIT - 2006-11-15DEVELOPMENT CONSTRUCTION PERMIT
APPLICATION
(1/16/06)
For City use only: Application Number. 0�44 Application Date:
Permit application fee: $ 400.00
INSTRUCTIONS:
1. Complete this form (some questions may not apply to you) and attach all necessary documents and
submit to the Development Engineering Section of the City.
2. If you have any questions contact the Development Engineer, , at 221-6605.
3. Submit the Application and pay the Application Fee at the fee at the Engineering counter at 281 N.
College Avenue.
PROJECT INFORMATION:
Project Name (as approved by the City):
Sinclair Redevelopment, College & Drake, The Drake Shoppes PDP Final Plans- Type 1
Project A.K.A. (Marketing name if different from Project Name):
Drake Vitamin Shoppes_
Project Location: _2600 College
Property Owner (At the time of this pemrit issuance):
Individual Name: Ion Hauser
Company Name: Drskp. Vits in Shnppeq r r C
Address: 600 17'" St Suite 700 South Denver. CO 80202
Phone number(s):
Office: 303-825-8500
Cellphone:
Fax number:
Email: _hauser@drakeres.com
Applicant/Project Manager (The primary contact person for all matters regarding this project, and the
person responsible for all matters referencing "the Developer" in the Development Agreement for this
project):
Individual Name:
Company Name : r,_-'-n n P-' F rate c n es
Address: 000 17s' Suite 700 South Denver_ CO 80202
Phone number(s):
Office: 303-825-5515
Cellphone: 303-710-3740
Fax number: 303-825-7200
Email: craig@drakeres.com
Development Construction Permit, Page 4/6
EXHIBIT "A"
DEVELOPMENT PROJECT CONTACT PERSONS
Name, address and numbers
Project Name: Drake Shops
Project A.K.A.: Sinclair Redevelopment / Lot 1 Thunderbird Estates
City Staff Contact Persons:
Development Engineer: Marc Virata
281 North College Avenue, Fort Collins, CO 80524
970 221-6605
Construction Inspector: Lance Newlin
281 North College Avenue, Fort Collins, CO 80524
970 416-2011
Current Planner: Ted Shepard
281 North College Avenue, Fort Collins, CO 80524
970 221-6750
Water Utilities Engineer: Roger Buffington
700 Wood Street, Fort Collins, CO 80521
970 221-6854
Erosion Control Inspector: Bob Zackley
700 Wood Street, Fort Collins, CO 80521
970 224-6063
Natural Resources: Doug Moore
281 North College Avenue, Fort Collins, CO 80524
970 221-6143
Traffic Operations: Eric Bracke
625 Ninth Street, Fort Collins, CO 80524
970 224-6062
Street closures: Syl Mireles
625 Ninth Street, Fort Collins, CO 80524
970 221-6815
Development Construction Permit, Page 5/6
Transportation Planning: David Averill
215 North Mason Street, Fort Collins, CO 80524
416-2643
Forestry: Tim Buchanan
281 North College Avenue, Fort Collins, CO 80524
970 221-6641
Light and Power: Doug Martine
700 Wood Street, Fort Collins, CO 80521
970 224-6152
Developer' Contact Persons:
Developer/Owner:
Applicant/Project Manager:
General Contractor:
Jon Hauser
Drake Vitamins LLC
600 17t' St. Suite 700
Denver, CO 80202
303 825-8500
303 825-7200 (fax)
John Craig
Drake Real Estate Services
600 17'h St. Suite 700
Denver, CO 80202
303 825-5515
303 710-3740
303 825-7200 (fax)
Jay Meluey
MPB Contractors, Inc.
15600 E. 19d' Avenue, Unit H
Aurora, CO 80011
303 343-4318
303 888-7699 (cell)
jayrneluey@mpbcontractors.com
Development Construction Permit, Page 6/6
Architect/Planner: Andrew Lemmer
Design Edge Architects PC
1820 15t' Street Unit B
Denver, CO 80202
303 260-7277
a.lemmer@de-arch.com
Project Engineer: Joe Sparone
JR Engineering
2620 E. Prospect Road, Suite 190
Fort Collins, CO 80525
970 491-9888
970 491-9984 (fax)
m — P Cb__ECE AVENUS 3
m g g
.p
VIT
S Q I
a s c a iEo 1 00
Z C)
_
a§ o A
rox
qq I r�N
m pp� � 6 $ VdV €S 2 dall i
VJ
n 94 11 va 3333; CAI it A [INi ya 1 6.6 � j! !o otvg 6 O
Sg§AA s 3q�9
AT
OMM
I Ile p ss nn 9 090
p 62 Rd Nf
Y 0
�0
f �r
or
m
m
d D n
� S v
i
Ne a�{tp�a DRAKE SHOPS !.
SW CORNER OF �,�;��] rr SITE PLAN �. ;!115'P t
i DRAKE & COLLEGE
P4aP FORT COLLINS.,OLORADO1�
i 1
P
6
Q�i
R
R
D
m
a
- -- - -
p R EOEEEGE AVENGE 3
Eg e .. --, i
4
U
�v
e
)
m
v
i
NRk
3
R
p�
DRAKE SHOPS
ig
s
! 3
2800 OOLLEOE AVE.
�
a[
9
[[
FORT COLLIM COLORADO
•�i'
{it$e
4a� 1� i�
1oP11
g[g gg
�ER/IO
ESTAT
Transportation Development Review Fee Date Received/Paid(,
Total Amount Paid f5ipiti J . e
CrlvofPartCoAlns Project Name: _
Project Location: hL/!er c ! lc, Gr= r,,i( Date: V/d 'Q!
Type of Submittal
Please indicate the type of application submitted by checking the box
preceding the appropriate request(s).
Fee structure amount due
❑ Overall Development Plan (ODP) $500 each _
0 Final Development Plan (FDP)
This fee includes 2 rounds of review $1000 each
0 Additional round of review
❑ Annexation S20 x_acres-
0 Minor Amendment
❑ Major Amendment
❑ Re -zone
❑ Modification to Land Use Code
S 500 each
_+5250 = _
$250 each
$2,500 each
$200 each _
5200 each
❑ Wireless Telecommunication Equipment (WTE) $65 each
❑ Road Projects _ acres (of roadway) X $250 =
C Vacation of Easement(s) -'• # of vacations _ X $400 =
❑ Vacation ofRight(s)-of-Way ••• # of vacations_ X$800=
jY Dedication ofEasemwt(s) and/or Right(s)-of-Way •'•
# of dedications mZ X $250 = 0 5Q0
••• This fee do" not include the cost of filing fees. Filing fees shall be
determined at the time of fmal document submittal and will be required prior
to filing.
Project Development Plan (PDP) or Basic Development Review Project
requiring Transportation Services Review and/or utility plan review. This fee
includes 3 rounds of review.
Detached Single Family $160 per unit
_#of units X$160= _
Multifamily or other residential units 5115 per unit
# of units X Sl IS =
Commercial, Industrial, Retail, and/or Non residential
building square footage $0.25 per square foot
_sq R X 50.25 -
Size of the development (area being platted or if not being
platted size of parcel accompanying all development
improvements) $250 per acre _ acres X S 250 =
Project fee $2,000 each Sj=
Total of above amounts
If this fee amount exceeds $30,000 then the fee amount shall be adjusted with
the following formula:
$30,000 + h (the amount over 30,000 -
The maximum fee for any residential ONLY project shall be $500 per
residential unit This check should be used to verify the fee amount (does not
apply to mixed -use developments). POP fee shall be the lesser of this amount
or the above calculated amount.
# of residential units X $500=
Reduction for affordable housing - a copy of the City letter certifying/
authorizing the affordable housing shall be provided with this application.
Amount of reduction to be applied
Total owed for PDP S_S .00
Land Use Information:
Total number of single family detached units:
Total number of multifamily/other residential units: _
Total number of certified affordable dwelling units (a copy
of the letter/ authorization is required):
Non residential building square footage: sq it
Gross Acreage: acres
General Information: OwnersName(s): 'D eke, VAf#f;AS Ll-c-
Street address: enti fa6,k.'iW eeS
Vo17 l7 5'{et•P..f
a€ IoD _3014A_
City/State/Zip: j"6,Al?d Z0 ZD Z
Telephone: 303t15.960 Fax: ff' S DD
Applicants/ Consultants Firm Name:
Contact:
Street address:
!`c,
City/State/Zip: F� le % /n s
Telephone: - f`cI Fax:
Certification:
By signing this permit I acknowledge that 1 am acting
with the knowledge, consent, and authority of the
owners of the property (including all owners having
legal or equitable interest in the real property, as
defined in Section 1-2 of the City Code; and
including common areas legally connected to or
associated with the property which is the subject of
this application) without whose consent and authority
the requested action could not lawfully be
accomplished. Pursuant to said authority, I hereby
permit City officials to enter upon the property for
purposes of inspection.
Name (please print):
Signature:
Telephone: 41`
cc: Christie White, Engineering
Development Review Engineering
Services
Engineering Department
MEMORANDUM
TO: Drake Vitamins, LLC
FROM: Lance Newlin, Construction Inspector/ Vicki Czaplewski
DATE: 4/30/2007
RE: Initiate Escrow Account
This memo is to acknowledge the receipt of escrow funds in the amount of 2572.00 for
the following:
2600 S. College Ave.,Drake Shoos
for the completion of
When improvements to the Right -of -Way are completed, please call our
inspection recorder at 221-6609 to request an inspection (please allow 24 hours
for the inspection to take place). Once the improvements have passed inspection,
the funds in escrow will be released to you.
Escrow funds have been received from:
Drake Real Estate Services LLC
600 17th Street, Suite 700 South
Denver, CO 80202
3038258500
cc: Initiate Escrow file
Subdivision Fiiq
Judi Vos, Cash Systems Coordinator
Permit#A021-06
Initiated by: Lance Newlin
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605 • FAX (970) 221-6378
www.fcgov.com
Permittee (Person who is to sign the Development Construction Permit):
Individual Name: Jon Hauser
Company Name: Drake. Vitamin Chn_nrnrrc T T r
Address: 600 17'b St Suite 700 South Denver. CO 80202
Phone number(s):
Office: 303-825-8500
Cellphone:
Fax number: 303-825-7200
Email: _hauser@drakeres.com
Project Engineer (A Colorado licensed professional engineer who is the civil engineer, the person,
responsible for the design of this project, responsible for certification that improvements are constructed
in accordance with approved plans, responsible for making revisions to plans with City approval and for
providing as -constructed plans):
Individual Name: Joe Snarone
Company Name: JR Engineering
Address: 2620 F Prospect t Rd r$to [90 Fort Collins rO 90525
Phone number(s):
Office: 970.491.9888
Cellphone:
Fax number:
Email: jsporone@jrengineering.com
Professional License Number: 39848
Architect/Planner (The person responsible for the site design of this project)
Individual Name: Andrew Lemmer
Company Name: T)PC•gn Frige ArybiteNg PC
Address: 1820 15" St Unit B. Denver. CO 80202
Phone number(s):
Office: 303-260-7277
Cellphone:
Fax number:
Email: a.lemmer@de-arch.com
Developer (The party or parties referenced in the Development Agreement who are responsible for the
Developer's obligations contained in the Agreement —add additional names below):
Individual Name: Jon Hauser
Company Name: . tAmin ehappee T T C
Address: 600 17" St Suite 700 South Denver. CO 80202
Phone number(s):
Office: 303-825-8500
Cellphone:
Fax number: _303-825-7200
Email: _hauser@drakeres.com
General Contractor (The contractor in overall charge of the public infrastructure construction):
Individual Name: Jay MCI=
Company Name : MPR (7nntrnp.Mrq. T
Address: 15600 E 191 Ave Unit H. Aurora CO 8001 I
Phone number(s):
Office: (303) 343-4318
Cellphone: (303) 888-7699
Fax number:
Email: LaMeluey@mnbcontractors.com
If you have no General Contractor, list all other contractors below.
Grading contractor:
Individual Name:
Company Name :
Address:
Phone number(s):
Office:
Cellphone: _
Fax number:
Email:
Utility contractor:
Individual Name:
Company Name:
Address:
Phone number(s):
Office: _
Cellphone: _
Fax number:
Email:
Concrete contractor for flat work:
Individual Name:
Company Name :
Address:
Phone number(s):
Office:
Cellphone: _
Fax number:
Email:
Concrete contractor for structures:
Individual Name:
Company Name:
Address:
Phone number(s):
Office:
Cellphone: _
Fax number:
Email:
Paving contractor:
Individual Name:
Company Name: _
Address:
Phone number(s):
Office: _
Cellphone: _
Fax number:
Email:
Landscape contractor:
Individual Name:
Company Name:
Address:
Phone number(s):
Office:
Cellphone: _
Fax number:
Email:
Other contractors and parties involved in the project:
SUBMIT THE FOLLOWING ITEMS (Required for all projects):
cope rte an
Proposed Project Schedule
Project quantities an cost estimate for all of the public improvements to be constructed. In
addition, include all private improvements that are required to be inspected by the City
Construction Inspectors. This information must be submitted in the format shown on the
attached form titled "Project Quantities and Cost Estimate Sheet."
ADDITIONAL SUBMITTALS (Required if checked):
❑ Traffic control plan(s) for the project
❑ Proposed haul routes shown on a City map
❑ Shop drawings
❑ Other
CONSTRUCTION COORDINATION MEETING: A construction coordination meeting to discuss
plans and special requirements for your project, is required for all development projects. The people
required to attend the meeting are the Project Manager, Project Engineer, Developer, Architect/Land
Planner and General Contractor (if no General Contractor, representatives for each of the contractors
expected to work on this project)
People to Attend: List the peoples names and titles for those who will attend the pre -
construction meeting:
Name
Jay Meluey
John Craig
Joe Sparone
Andrew Lemmer
Title
General Contractor
Developer
Civil Engineer
Architect
ESTIMATED COST OF INFRASTRUCTURE IMPROVEMENTS: Provide the estimated value of
all public infrastructure improvements that will be constructed and accepted by the City to own and
maintain. In addition provide the value of all private infrastructure improvements that the City will
inspect and require certification for. The estimate shall be in the same format as the attached sheet titled
"Project Quantities and Cost Estimate Sheet."
Public infrastructure, estimated cost: $9482.84
Private infrastructure, estimated cost:$3375.00
I certify that the information on this permit application along with the required additional submittals are
true and correct to the best of my knowledge, and that in filing this application I am acting with the
knowledge, consent, and authority of the owners of the property (including all owners having legal or
equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common
areas legally connected to or associated with the property which is the subject of this application) without
whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said
authority, I hereby permit C'ry officials to enter upon the property for purposes of inspection and, if
necessary, to enter upon soliproperty to per rm work required of the applicant if the applicant were to
fail to perform the requir fork. n
Applicant Signature:
6-15-06
f
G O W N+ 0 0� N V N N A In 1:+ 0 0 m N N A fi N+
Z• 0 D v o O v 0 0 �l 3 «?t w -i In D V *^ y
..{ O 9 p, m y N m N [n N 7 N N, C bl( S
rmn m m n T m 5 m m �. r° m _. m> > o -, A: N:.y c
-I -I m �i Lbw N m CD m n� �� W m p wm CD :F; a
O m ' w x ^ 3 m y m 2 n m m r
�3 m 0. 3 yam 3c0
ZA 'o m m m �01 0 � TWZ � a
n< w 5F m 0) m m 0 e
mn 'm m
3 'o f ti T
AZ v 2 CD 'mq v
0 y C N
m y y
Ap
n �
OZ'.
1 Q w
�-i1 ffnn fRn1 ffnn fRn1 O
K fowrtor Cn Co DDDDDDrrrr yy(�()rr ' S+'t
_ < ;� Ul T ?1 ;C ?7 () (7 Ci Ci C) Ci �I . . . 0 0 -({ ?I .n y p, �
� Z 222222 22 E *�,,, s
Zy
gm 77m
z 0<
c
y mm�
�...p
r
z
oCO
0 01 N N al O N � 0" 0 0 0 O A 0 0 -+ 0 0 0 (n 0
m
0�m
�rn <pmiMm`0'
c £a
p Mii a4g0"_(A, m
m0 69 f�0 EA 69 m v fA iA EA fA
b9 W O EA N !A 0 EA O 69 EA EA N N w N di fA fA 69 fA
_ 000 W O) O OOOOOON 00 (n O o000T O -q m
O GGO00 A OOC 0000 C 00 00 G GOO J""'i'191
o O O O O O O V O O O O O o O O O o O O O O O O m s�
m:
t
m 2 ' ,
9
22
Ddi EA EA
m w ao o w w w EA o to cn to EA to to fA vi
000rno rn o0000 0000 0 �r'1,
3 GGGoG GGGGO GGGO' G � SQ
y o0000 o0000 00000j'
m,
m'
m h
i fA
�p c
C69 fA fA'w <A w w W V O v V EA f 16M to fA EA M
C 00 O (T U� Ut O co 00000 -W woo
i• ? A O O O? 0 0 0 0 0 0 0 V V �I - CD Ill N V V
r CA l f 71 O O O (AO O O O O o O O O O O O O O O
0 lin
i.
m
Z
c
0
m wW�000 EAwfAb9(A �� ov�vica00
p G o w o 0 0 o cr o 0 0 0 o w o 0 0 0 0
D c G o G G' G G G G G' c
00000 00000 00 000000
'O
0
m
1
AD
z
m
N
0
n
O
N
—I
m
1
m
m
y
2
m
Transportation Services
Engineering Department
DEVELOPMENT CONSTRUCTION PERMIT
Permit Number: A-021—D(e Issuance Date: 'i 1 1--.5
Project Name: Drake Shops
Project A.K.A.: Sinclair Redevelopment/Lot I Thunderbird Estates
Project Location: southeast corner of College Avenue and Road
Permittee:
City and developer contacts: See attached Exhibit "A" for names and phone numbers of all
contact persons for this project.
Fees: Permit Application Fee (paid at the time of application) $ 400.00
Construction Inspection Fee (paid prior to issuance of this permit) $ 453.00 a rc
Total $ 853.00
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shown on the approved plans for the development.
$ 12,858.00
Form of security deposited with the City: Letter of Credit
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design
drawings and specifications the certification of all materials testing by an Engineer. The Permittee
shall have an Engineer prepare revised design drawings and secure City approval for ail revisions to
the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required
by the City in the Development Agreement, that the improvements are constructed in conformance
with the approved Utility Plans and the standards and specifications of the City. The Permittee shall
provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the
constructed public improvements. (All references above to the terms "Project Engineer" and
"Engineer" shall mean a Professional Engineer licensed in Colorado.)
2. All contractors who perform work on this project must be bonded and licensed in conformance
with City requirements.
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605 • FAX (970) 221-6378
www.fcgov.com
Development Construction Permit, Page 2/6
3. Construction time restrictions:
4. The applicant understands that additional permits maybe required for this development project
and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this project
(utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic
study, drainage report, plat easements and any other official documents), shall be kept on the
development site available for use by City staff doing inspections.
6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or
Section 2.6.3(K) of the Land Use Code, whichever is applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shall expire and the applicant will forfeit the permit fee paid for this
permit, whereupon the applicant must re -apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The applicant
may apply for an extension by reapplication at least two weeks prior to the expiration date.
Such application shall contain information sufficient to justify the granting of the extension.
An extension may be granted for up to six months.
7. Building permits and certificates of occupancy will only be issued when all conditions contained
in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29-
678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the
Development Agreement does not specify times for completion of public improvements, or if there is
no Development Agreement, then the improvement requirements specified in Section 24-95 of the
City Code shall apply, which provides that construction of all improvements shall be required prior
to the time of issuance of the first building permit.
8. Acceptance by the City of the public improvements shall be after (1) final inspection has been
conducted by the City; (2) punch list items from the final inspection are completed and accepted by
the City; and (3) required certifications from the licensed professional engineer that improvements
are completed to City standards, specifications and approved Utility Plans; and the Aas-constructed@
plans have been received and accepted by the City.
9. The warranty on street improvements is for five (5) years from the date of acceptance by the City
of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional
Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use
Code, as applicable.
10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any
Development Construction Permit, Page 3/6
planned construction on this project. All required perimeter silt fencing and other erosion/sediment
control best management practices (BMP's) that can be installed prior to construction must be in
place and inspected by the City Erosion Control Inspector before any land disturbing activity begins.
11. No work (including grading) shall be started in State Highway right-of-way until a permit is
issued by the Colorado Department of Transportation to allow such work to begin.
12. Other conditions:
Permittee's acknowledgment signature:
By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of
the owners of the property (including all owners having legal or equitable interest in the real property, as
defined in Section 1-2 of the City Code; and including common areas legally connected to or associated
with the property which is the subject of this application) without whose consent and authority the
requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City
officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such
property to perform work required of the applicant if the applicant were to fail to perform the required
work. I also acknowledge that I have read this permit document with all its requirements and
conditions, and I agree to all of the terms and conditions so stated in this permit.
Applicant/Project Manager' s Signature• Date:
Approval for issuance:
City Engineer Approval: Date: 7/
(Permit Issuance Date)