Loading...
HomeMy WebLinkAboutSONNY LUBICK FIELD AT HUGHES STADIUM RENOVATION - Filed GC-GENERAL CORRESPONDENCE - 2006-09-21From: Sheri Wamhoff To: Chris Cece Date: Mon, Apr 26, 1999 11:11 AM Subject: Re: Overland Trail widening -PJ f j{�y 31 Chris 9 Overland Trail is considered an arterial. Due to changes in standards and existing improvements on the east side of the road. the widening of Overland Trail will occur to the west. At this time 65 feet of right-of-way will be required on the west side of the road (from section line) and 57.5 feet of right-of-way will be required on the east side of the road (from section line) where obtainable. The road section is our arterial section, with a 19 foot center median. There is currently been no design of this portion of the roadway as the design of a roadway typically occurs with development or a city capital project. Therefore no grades or elevations have been established for this portion of the road. If you have any additional question please call x7140 Sheri Wamhoff >>> Chris cece 04122 1:17 PM >>> Cam I am a project manager for the City Utilities - Water division. I have a project getting close to final design with construction planned for Fall 1999. The project is the Rodeo Detention Facility, located just west of Overland Trail at the CSU Durrell Rodeo arena ( Ross Dr). The plan is to use the existing culvert below Overland due to the hydrologic limitations downstream. To accurately model this facility I need to find out some information about future plans for Overland Trail improvements. Currently, my main points of interest are road section, elevation changes, and proposed direction of widening. Could you help me get some feedback on these issues as soon as possible. Or could you forward this someone who would be able to assist If there are any questions or comments please do not hesitate to call me at 221-6235. Thanks Chris Cece CC: Cam McNair