Re: New Belgium Brewery — Request for Variance 1 — Curb
Proj: 110-12
Dear Ms. Wamhoff:
The following is a request for variance from the Table 7-1 — General Parameters — Curb &
Gutter Vertical in the "Larimer County Urban Area Street Standards, October, 2002". This
variance is requested to allow the curb to be eliminated on the north side of Buckingham Street
for approximately 800 feet. Buckingham is a minor collector street with parking.
Buckingham is proposed to be improved to the collector standard for approximately 1700' from
the intersection with 1 s` Street to the east. Drive over curb with attached sidewalk exists along the
south side of Buckingham from I" Street to 3rd Street. Approximately 200' of vertical curb with
attached sidewalk exists on the south side of Buckingham east of the proposed improvement. The
remainder of Buckingham currently has a rural type section with shoulders and a borrow ditch.
It is proposed to construct Buckingham to the collector standard width and accommodate all of
the required lanes. In place of the vertical curb, it is proposed to install a 30" wide concrete edge
to prevent the asphalt from raveling and define the street edge. Since there will be parking along
this edge, this parking aisle and the bike lane will provide a 14' recovery area if a vehicle
inadvertently leaves the designated through lane.
A bio Swale will be constructed in the parkway and a walk will be constructed north of the bio
swale. The parkway will be widened to 10' to accommodate the bioswale and the required street
trees. The walk is also being widened to 8'. The swale will be approximately 1' deep and will be
used to convey runoff from the street east to the intersection of Buckingham and Lemay Avenue.
This swale will also provide a water quality component that will help remove pollutants and
particulates from the street runoff prior to the runoff entering the storm system and the Poudre
River. This swale will not be used to treat any runoff other than the street and sidewalk. Any
other development would be required to provide its own water quality component prior to
discharge into the storm system.
The bioswale will be lined with approximately 10" to 12" of sandy soil to promote percolation of
the runoff water into the soil. The swale will also be landscaped with low maintenance plantings
700 Automation Drive, Unit I Windsor, Colorado 80550
970-686-6939 Phone • 970-686-1 188 Fax
UV,UVV
'AWW OFF1499 or
CHARLE6L WC-VCQ
W0013, RIS & MAY
MARK R. DAVIS
-MS
HIQH�L P. WLVIAND
"MorcDOIONAL coNPoMnON
WILLIAM h ROC[R4 I11
Y PYi!(LL
1775 nH ERMAN (TREE I. NU ITC 1600
DARGAd1AYTOM
K"CR A L. ORVNOIH
LY.t .PNTI
32saVVElt, COLOP400 0MG3•4=S
RO8C" fI"LA"O
O. I
"CREW PCTCM
4"KA. 0. HIMIANON
MANM1 J. JACMIMIAN
TCLs.T10NL' (Coy Oai•77Cp
OTEVEN A JONHOTON
FAG51MILC 13031 030-a77L
OF COUNOCL
euacme a. MAMcu
P. MICNAEL LUDWIG
MN.Lo L aoOv
January 19, 2006
Ms. Lora Heckman
Project Engineer
New $elgium Bmwing Company
500 Linden Street
Fort Collins, CO 80524
Dear Ms. Heckman:
VAIL OFFTGE
MARKOT PLACC MUM1 Wd
v uric 210C
4I1" U.O. 111CH1VAY O i e4
CAGLO.VAIL COLONADO aIOlC
P.O. mox 4000
AVON. COLORAOO 010E0
DCNYI[A UN[ 17021 OOA.I010
TW6CMONC IOrq Y46440T
V.giylu (OTC) 9A". 04a
COWARD L WCOO popp.1974,
WI\LIAM K P43 (RRwo=j
FAQUAILE
L
This is to tbllow Up our conversation and your letter dated January 29, 2005. As I have
indicated to you, this firm repres= tine interests of Jim and Ruth Hoffman and Charley and
Dorothy Whislcr regarding the Coy Ditch I have spoken with the Wltialcrs and the Hoffmaas
regarding your request My clients arc concerned regarding the affect the enclosed culvert may
have upon the flaw of water in the ditch. They also want to ensure any documc nation regarding
the ditch easement is reviewed by their water attorney. Thus, they will retain Tutdc Applegate, a
water engineering firm, and Peggy Montana, Esq. of 1'rout, Raicy, Montana, Witwcr & Freeman
to Overscc their interests. In order to cover the costs for these consultants and to consent to this
'aquas; my clients would require payment from Now Belgium Brewing in the amount of
.$15,000-00�Secondly_as..pnrL* any-agm=ent...the.easementwouktaaed.to.rc$eet.thatNew..
Belgium or any subsequent land owner of the property would be responsible for the maintmrancc
and repair of the culvert, including removal of debris.
if It'ete terms arc acceptable, my clients would agree to your client proceeding with this
project as proposed. if you regtLift any further documentation to proceed with title project please
let me know. If you have say questions or would like to discuss this further, please do not
hesitate to contact me.
8iecarely yqur8,
Mrwntad Michel P. Williams
cc: Clients
L/t"d SL29T220L6:01 L28t£220L6 NSIS30 HHB:wOJJ 80:20 9002-9t-83d
Lora Heckman
New Belglum Brewing Company, Inc
SOD Linden
fort C0111ns, M.80524
tte: latter of Intent Tor future easement
Dear Ms. Heckman, I
This letter Is to adDWM%ge our intant'to furdw d=ss and grant ea6a�nent.fir piping
the Ong Coy Dttdi from 1st SGaet east to Srd Street and south across Buckingham
Street The eademant w111 be located wlgrin &A property adjacent to the• north side of
Buckingham Street car e* owned by the New NAM Brewing Company, Inc.
I N W RRORA�aR, -
•
mu UNDEN STMZT Slncerelyp -
FOA'r COu S -
COLORADO 90524
Y76,221.OS74 Die HU1, Pml11 dent •-. O r� ..
`497o-2-'1.0555 Springer -Fisher, Inc- - Date.
19% Interest buy Duch
L/S'd 8L£9T220L6:Oi L28T£220L6 NE)IS30 UHB :WOJd 80:20 9002-9T-83d
---a2XWtooa-Teuaaua..ituraos-rai-ease-DaRaaeo a 1100:/40:
J
DEVELOPERS
DtvlastREo
REAtP!
Febmary 16.2006
"Heckman
Now Belmum Brewing Co
Soo ,mien
Ft Collins CO $0524
Re- Coy Ditch
Dear um
"As tenor Is being sent eft bdlalf of Ft Collins Pardtory x LLC, Wo ere is tRelpt of a
letter dated Jmmwy 27. 2006, fiom blew Belj¢ ms Bmwing Company, a copy of which is
attached. and rucrally do trot havo sW objeotion to Now Bol;h&g proposal outlined in
that 1009r. Notwithstanding the fhragol-a& thfa I0W cMdanoa only ma intent to Atrgm
dlWM Ibis matldr with New Belgium and to reasumbly coopmIN with nspeet thereto,
eubjoot to oorreoeipt, review and approval ofttpF UwWopleoa and q=Wcat;eng end
dmmmmtion tiering to the propoged 1mpwvom4rte.
R,eg,onol A•opertyM,nnnger
b'10elp�Y/ ea- ear �eR, enad�tipp0, Ohb aauz i21 cass.ssmiq,�2t6.7re,1 La0lwww.ee'c.am
L/9'd BL£9122016:O1 428i£22046 NDIS30 kHH8:wOad 80:20 9002-95-63A
5
Lora Hedmwn
New Belgium 1306wing Company, Enc.
5UO Lfedetl Street
Fort Collins, Co hf4Sit4
RE! LetEer of Intent for future easerent
Dear Ms. Hadamn,
iris lem6r Is to acknowledge our Intent to furdter dWcussand grant easemerrl for piping
the existing Coy Ditch hqn 1st Street east to 3rd Street and south across Isud drigtham
Street. The easement vrili to Ioplad within the property edjacart to the north side of,
rM oRro•aWD
BueklAgtram Sheet currently owned by rh4 New -Belgium Bre►ving Company, Inc
snnuv,>xvltivar
Sinoarely,
Poxrcoum
COLOW OICS24
,
97tlns-029
Rick Merkel
fax 97h22r-0535
Regional Prop@rty Manager .. Date
Developers D vmftd R49lty
35% Infcrest Coy bitch
L�L'd BL£9T22OL6:01 L28T£22OL6 NOIS30 dHe :wuaj 20:20 9002-9T-83d
April 19, 2006
Paul
Attached is information that Kim Jordan submitted to Don,
per our request that they work on an agreement with the
Ditch that they would be okay with future realignment of
the ditch. Don is out the rest of this week and he asked me
to forward this onto you for your review and comments.
We had meet a couple of weeks ago to talk about what we
would need to get from New Belgium and the Ditch
Company to be comfortable that we would not have any
problems with relocating the ditch in the future even
though they do not want to provide what they consider a
final design at this time.
Does this get us close to what we need and what you were
expecting?
'APR-I6-2006(TUE) 16:29 New Belgium Brewing
(FRX)9702210535 P 001/008
Company, Incorporated
500 Linden • Fort Collins, Colorado 80524 USA
(970) 221-0524 9 Fax (870) 221.0535
w ncwbcl 'um corn
To: T)ON RQ�m a� Fax Number. ZZf (03
OP f:iy col!i05, Phone Number. UA-(a
From: Lora, Ht&man (;w kllblJor4.k) Date: 4 (f$[pb
Number of pages Including this one:
�n 1
a racked are. +e 1646V5 4 ?r6roin Ary cA.pptvrxZ
-�V]r +11Y, Goy 9+rA, owerrs - D Wcw 13613iuw,
�jr�W'r,n q ��A.n7 -�v -�'� I7✓DPDSCc� �g7� n
pipe, +� c �rcA+e all
xVM 4toj;n +hese- per ytur ,regt)e4+ .b
�►rv, Jorda�t �`�aY
P►ta15*60 WtAut. k-5 4 y� viec). W,-kat at h-�,r�.rocl,o,,.
44 ptu�9,
Ride Your Bike to Work
APR-18-2006(TUE) 16:29 New Belgium Brewing (FAX)9702210535 P.002/008
Owsors of the Coy 131wh
tl ■
Dowlopon 01Vtln10W
Rick Morkol: O}04e: 303.777,59301 Coll: 303.001.9513
0splomll Propeft Mmopor
6409 wart Reed, 9utle VVO
Ands, CO 40002
95
o yyS.Y ur
O,4Ml0Y'YVIIINOI'rj'r r, i�� i�4,'�,: %yy,V 01 w'jpl mrtl , r�x57ii ���,i.
r��
it �l��arw.hn(I
RE P1diClty�r5097J01i>IjNtMk°6�"�.4� � rOg l; ry 1 , '� � I j#�
pu71i, ,
a " 1 Lill �"�?�. '�t•1471s �r.A' "F tYY #Y.'>',. r^ ! „vl dwr ,^r�'c
MlkemtlMppaentrlbdm0lyandy,IMnl�tlSg
r•Ih l,m��,t
Pbrolh Altl 1k1+ jIfFtno aed hnd Veuel AtlMihePlp(oMryu{III lIm.p�itfry ••
5� �l+"ij1
Ca�Ilsilq�Mr20 tl'�i'ron,pgtlt�btirmUlY;bh��, �'ti',��� r'��'"��'.NY��{�.If
�, idr r�
✓�
4!✓C i rR 6 SRW,�
J*
M 0
�l,'�ji�, �ry J M Ipp'"r11yi� 77A 5 t Kt„r .J4p iMhRT I NJ yl�li 1
S 4AM
.��+
y'4'
i9n�.
t'.T��jf4h
�wh^ trtltlrpp'Nu;.kIi �w.wahry�,n�� a
,
'CzS';"rky �1
�k
JIrt1 'ae"la!�use f itrantlto'Cln"dig eeWGo A`CouOrshk'^e��i r'� w
;r��20
+✓..�A�cF4�+."v vr�fK'$Y#'&7»✓�.+t7aM'10Gfiekft5%tlu�NJe7��v'�M1�4'.4,Kxe �'�h
I b
rTIqJ
IM
�., ✓ a
'J
11 1 ,'t
Otivg,W O lhmolO1941 wmawo r�prpopkf$gY1PGTlie 1 1rlsrPr01111g11Lglr7'i
4SprTnptlr
1 S
tlner�Inc.�jaNhmllyOuelneuwltflTwVtlwlaw0an�{LaViifi v
r�.ry r..4oryI9C4f��1019Ar0'�t pie OM'�IgIl: IKdpl f°y"effiYkq'PlYekltl e
q$ Cgllhlt on R"011moomill 0jtmit0httl
}
Bl1'S,'
I!Id Wt�l ¢p P#9iE,q��tQ���hL��"h I CO Zi0 0r
tl
9 n tl 0
1
I
0 Rpptl 1 t'q �
I
Rtll � o
9
APR-1'8-2006(TUE) 16:30 New Belgium Brewing (FAX)9702210535 P.003/008
DEVELOPERS
DIVERSIFIED
REALTY
February 16, 2006
Lora Heckman
New Belgium :Brewing Co
500 Linden
Ft. Collins CO 80524
Re: Coy Ditch
Dear Lora:
This letter is being sent on behalf of Ft. Collins Partners T, LLC. We are in receipt of a
letter dated January 27, 2006, from New Belgium Brewing Company, a copy of which is
attached, and generally do not have any objection to New :Belgium's proposal outlined in
that letter. Notwithstanding the foregoing, this letter evidences only our intent to further
discuss this matter with New Belgium and to reasonably cooperate with respect thereto,
subject to our receipt, review and approval of applicable plans and specifications and
documentation relating to the proposed improvements.
Ric erkel
Regional Property Manager
3300 Er rprw Parkway IRO, Box 228042. Bearhwwd, Ohio 44122 / 216.755.5300 / fox 216.755.15m0 / www.ddreconi
APR-I8`-2006(TUE) 16:30
New Belgium Brewing
(FRO9702210535
P.004/008
COMPANY
INCONPOAAT■O
•
goo 1IND&N TrlulT
POAT COLLINS
COLOiLWO 80524
Y70-ZZm-0524
fu 970.221.0533
27 January 2006
Rick Merkel
Regional Property Manager
Developers Diversified Realty
5400.Ward Road, 5ufte V270
Arvada CO 80002 .
Dear Rick,
Per -our phone conversation In December, New Belgium Brewing Company is asking
your permission to proceed with under grounding a portion of the Coy Ditch
currently located in the City of Fort Collins Right of Way along Buckingham Street.
Attached are one copy of the existing conditions and one preliminary design
drawing.
The reason we are requesting this is to accommodate the City's requirements
for widening of adjacent Buckinghama Street to Larimer County Standards, which
would move the Right of Way line further north into our property.. In order to meet
these standards, the ditch would.also have to move north, onto our property, which
is why we would need to pipe It and grant an easement to the owners,
The City of Fort Collins requires us to have a signed letter from all the owners (by
February 2 for a scheduled hearing) stating that they are in agreement with the
direction we are heading. Assuming all the owners are In agreement, we would.
follow up with a new legal description (to go on record), that reflects the changes
upon final design.
Please sign the enclosed letter and return it to us in the pre -paid envelope before
February 2. Thank you very much for your assistance, and please do not hesitate to.
contact me If you have any questions.
Kind.Regards,
Lora Heckman
Project Engineer
New Belgium Brewing Company
Iheckman@newbelgium.com
A
APR-1$-2006(TUE) 16:30 New Belgium Brewing
(FFaX)9702210535
P.005/008
COMPANY
INGON►ORI{T6D,
•
500 LINDEN STREET
Farr COLUNS
COLORMO SOS24
970-221.0524
f" 970,221-QS3S
Lora Heckman
New Belgium Brewing Company, Inc.
500 Unden Street
Fort Collins, CO 80524
RE: letter of Intent for future easement
Dear Ms. Heckman,
This letter is to acknowledge our Intent to further discuss and grant easement for piping
the existing Coy Ditch from 1st Street east to'3rd Street and south across Buckingham
Street. The easement will be lopated within the property adjacent to the north side of,
Buckingham Street currently owned by the New'Belglum Brewing Company, Inc
Sincerely,'
Rick Merkel Date
Regional Property Manager
Developers Diversified Realty
35% Interest Coy Ditch
and native type materials. The maintenance of the swale will be completed by the adjacent
property owner similar to the required maintenance of grassed and irrigated parkway area.
Because of the recovery area provided by the bike and parking lanes, the safety of the driver is
addressed. The bio swale provides a physical barrier to address the safety of the pedestrian if a
vehicle is able to leave the paved surface. This variance from the above Standards will not be
detrimental to the public health, safety and welfare.
Please call me with any questions or additional information that you may need for the approval of
this variance.
Sincerely,
�nnx�xmxi��
QP00 REG/' �
KR0 �106c9F0,
i n
Patri a Kroetch, P 90.. 3'
North Star Design, Inc. x4 •
�'twS/ON AL �?�
APR-i8-2006(TUE) 16:30
CHARLES E. WCAVER
MARK R. G..s
MICHEL P. WILLIAMS
WILLIAM A. ROOCRO, III
CLATTON S. RUSSELL
OAROARA L ORUNDIN
KIM%XPLY A ALLCORCTjI
ROSCRT 0, WMCCLER
"CREW D. PETERSON
MARK J. JACNIMIAK
STEVEN P, JOHNSTON
OF COUNSEL
EUO ENE 6. HAMEs
F. MICHAEL LUDWIO
DONALO L COOK
New Belgium Brewing (FAX)9702210535 P.006/008
LAW OFFICEE 07
WOOD, RIS & 14AJ-MS VAIL OFFICE
PROFESSIONAL CORPORATION MARKET PUCE GU1401N0
1775 SHERMAN STREET, SUITE 1600 SUITC 2IOC
41164 u.0. roOHwAT G 4 24
OE VVSR, COLURAMO 80203-4313 CAOLE-VAIL C06CRAOO 01620
P.01 DOX 6606
.ON. C04QRADO SIrRO
TELEPNONE (303) $63-7700
FACSIMILE (303) 030.0772
Ms. Lora Heckman
Project Engineer
New Belgium Brewing Company
500 Linden Street
Fort Coilins, CO 80524
Dear Ms. Heckman:
January 17, 2006
DENVER LINE (303) SSALICI%
TELEPHONE (270) 045-SW7
FACSIMILE (270) 8456022
COWARO L WOOD (I80PI074)
WILLIAM K. RIS (IYI&2=))
FACSIMILE
and U.S. MAIL
This is to follow up our conversation and your letter dated January 29, 2005. As I have
indicated to you, this firm represents the interests of Jim and Ruth Hoffman and Charley and
Dorothy Whisler regarding the Coy Ditch. I have spoken with the Whislers and the Hoffrnans
regarding your request. My clients are concerned regarding the affect the enclosed culvert may
have upon the flow of water in the ditch. They also want to ensure any documentation regarding
the ditch easement is reviewed by their water attorney. Thus, they will retain Tuttle Applegate, a
water engineering firm, and Peggy Montano, Esq. of Trout, Raley, Montano, Witwer & Freeman
to oversee their interests. In order to cover the costs for these consultants and to consent to this
request, my clients would require payment from New Belgium Brewing in the amount of
$15,000.00. Secondly, as part of any agreement, the casement would need to reflect that New
Belgium or any subsequent land owner of the property would be responsible for the maintenance
and repair of the culvert, including removal of debris,
If these terms are acceptable, my clients would agree to your client proceeding with this
project as proposed. If you require any further documentation to proceed with this project, please
let me know. If you have any questions or would like to discuss this further, please do not
hesitate to contact me.
Sincerely yours,
Michel P. Williams
MPWlkad
cc; Clicnts
APR-18-2006(TUE) 16:30 New Belgium Brewing
1
COMPANY
INCORPORATCO,
•
500 UNDON STldkr
FORT COGLiN9
COLOIWO 90524
970-221-0524
- fas 970-221.0535
(FPX)9702210535 P.007/008
Lora Heckman
New Belgium Brewing Company, Inc,
500 Linden
Fort Collins, CO 80524
RE: Letter of Intent for future easement
Dear Ms. Heckman,
This letter is to acknowledge our intent -to further discuss and grant easement,for piping
the existing Coy Ditch from 1st Street east to 3rd Street and south across Buckingham
Street. The easement will be located within the property adjacent to the -north sideof
Buckingham Street currently owned by the New Belgium Brewing Company, Inc.
Sincerely,
Dave Hill, President Date,
Springer -Fisher, Inc.
15% Interest Coy Ditch
-APR-IS-2006(TIIE) 16:30 New Belgium Brewing
(FAX)9702210535 P.008/008
City Manager's Office
February 14, 2006
Lora Heckman
New Belgium Brewing Company, Inc.
500 Linden Street
Fort Collins, CO 80524
Re: Request for Permission to Relocate Coy Ditch
Dear Ms. Heckman:
BY MESSENGER PICKUP
Thank you for your inquiry regarding the request of New Belgium Brewing Company in
connection with the proposed relocation of Coy Ditch, in which the City of Fort. Collins has a ten
percent interest. As i understand the proposed activities, New Belgium mill relocate the existing
Coy Ditch as it runs in a pipe from 1" Street east to 3td Street and south across Buckingham
Street into a new easement on the property of New Belgium adjacent to the north side of
Buckingham Street. You have been asked to obtain preliminary approval and consent from the
owners of Coy Ditch. On behalf of the City of Fort Collins, I hereby give the City's preliminary
approval and consent to move the Ditch as described, and acknowledge the City's intent to
Rather discuss and cooperate with New Belgium in connection with the Diteb relocation. Please
note that this letter is intended neither to constitute regulatory approval of any kind, nor to waive
any regulatory or other permitting or approvals required from the City in connection with this
project
Thank you for the information you have provided regarding this project, and for contacting the
City in this regard.
Sincerely,
F,-;) C- %
Darin Auebcrry
City Manager
cc: Daylan Figgs
Carrie Daggett
300 LaPorte Avenue • P.O. Box 580 • Fort Collins, C080522.0580 • (970) 221-6505 • FAX (970) 224-61.07 - TDD (970) 224-6001
www.fcgov.com
North Star
�4am., design, inc.
July 28, 2005
Ms. Sherri Wamhoff
City of Fort Collins Engineering
281 North College Avenue
PO Box 580
Fort Collins, Colorado 50522-0580
Re: New Belgium Brewery — Request for Variance 2 — Street Slope
Proj: 110-12
Dear Ms. Wamhoff:
The following is a request for variance from Section 7.4.1.B.1. — General Design Elements —
Minimum Flowline Grade in the "Larimer County Urban Area Street Standards, March 2001".
This variance is requested to allow portions of Buckingham Street to be designed and constructed
with grades varying from 0.4% to 0.5%.
In the past, the minimum grade allowed was 0.4%. Portions of the south side of Buckingham
were constructed or below at this grade. This project will widen the road to the north and will
need to match the existing grade in order to avoid complete reconstruction of the roadway. Other
possible solutions would require multiple low points and compromise the ride ability of the north
half of the street.
This variance from the above Standards will not be detrimental to the public health, safety and
welfare.
Please call me with any questions or additional information that you may need for the approval of
this variance.
1114
Sincerely, P'"O REG/. k5
v• T
ODP\G�P KR�F�9��E
i �/ U • ,LQ' n •• ,
01.
Patricia Kroetch, P.E."F
North Star Design, Inc. yvH Sip ni AL ENaa
700 Automation Drive, Unit I Windsor, Colorado 80550
970-686-6939 Phone • 970-686-1 188 Fax
Transportation Services
Engineering Department
September 8, 2005
Ms. Patricia Kroetch, P.E.
North Star Design, Inc.
700 Automation Drive, Unit I
Windsor, CO 80550
RE: New Belgium Brewery Street Slope Variance Request
Dear Ms. Kroetch:
The City Engineer has evaluated your letter "New Belgium Brewery — Request for
Variance 2 — Street Slope" dated July 28, 2005 and the accompanying design illustrated
on the "Public Improvement Plans for Buckingham Street'. Based upon this analysis, it
was concluded that the variance request can be supported and was approved on this date,
September 8, 2005.
While the request was granted to reduce the minimum grade to .4%, this should not be
viewed as a precedent for future designs not meeting the .5% requirement. Please let me
know of any questions or concerns.
Sincerely, _
Marc P. Virata, P.E.
Civil Engineer II
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605 • FAX (970) 221-6378
",;"%fcgov.Com
Transportation Services
Engineering Department
City of Fort Collins
September 9, 2005
Ms. Patricia Kroetch, P.E.
North Star Design, Inc.
700 Automation Drive, Unit I
Windsor, CO 80550
RE: New Belgium Brewery Curb and Gutter Variance Request
Dear Ms. Kroetch:
The City Engineer has evaluated your letter "New Belgium Brewery — Request for
Variance 1 — Curb" dated July 28, 2005 and the accompanying design illustrated on the
"Public Improvement Plans for Buckingham Street". Based upon this analysis, it was
concluded that the variance request cannot be supported and was denied on this date,
September 9, 2005.
While we in Transportation Services desire to be open to design concepts that may be
viewed as innovative in realms outside of transportation, we are still wanting to be
mindful of how these alternative concepts impact transportation needs. In general, the
City Engineer expressed concern on the increased maintenance responsibility
Transportation Services foresees in allowing water to collect and infiltrate in close
proximity to the pavement subgrade. In this scenario, the life of the street will be reduced
from a typical curb and gutter street section where water is directed away from the
surrounding street. We are faced with ongoing pavement management issues on our
public street system at large and a tightening budget to handle this responsibility; to
introduce this alternative cross section, we believe would not be in keeping with the
welfare of the general public.
Please let me know of any questions or concerns.
Sincerely,
Marc P. Virata, P.E.
Civil Engineer II
_Nl �h::+d�"• __. �.-3��-air",nr�.;�lu-,.' �'„i� -.__ .ter)?,= --
North Star
�Aftw design, inc.
January 10, 2006
Marc Virata
City of Fort Collins Engineering
281 North College Avenue
Fort Collins, Colorado 50522-0580
Re: Request for Variance #1 —Narrow street section
Proj: 110-13
Dear Marc
The following is a request for variance from Table 7-1 — Roadway Width in the "Larimer
County Urban Area Street Standards, March 2001". This variance is requested to allow
bumpouts on the north side of Buckingham Street (a minor collector with parking) which will
narrow the street width in the area of the bumpout.
The bumpout will cause the street to be 42' wide for a distance of approximately 80'. In this
area, parking will not be allowed. The narrower street will still allow for two 12' drive lanes and
the required bike lanes therefore traffic will not be impeded. This bumpout will also define the
parking areas and will help to control driving speeds on Buckingham Street.
This variance from the above Standards will not be detrimental to the public health, safety and
welfare. Please call me with any questions or additional information that you may need for the
700 Automation Drive, Unit I Windsor, Colorado 80550
970-686-6939 Phone 0 970-686-1 188 Fax
From: "Matt Johnson" <mjohnson@swinerton.com>
To: "'Marc Virata"' <mvirata@fcgov.com>
Date: 5/18/2006 9:21:36 PM
Subject: RE: New Belgium Brewery - DCP Spreadsheet
Thanks Marc - looks pretty straight forward - a couple of questions.
1) There are some existing hydrants that need to be relocated - I
assume the new lines and hydrants need to be included in the counts.
2) Trenching means all excavations for Sanitary and Water from the
street taps to onsite within 5' of the building? Is the storm that feeds
into the onsite detention ponds considered private? or does this, as well as
anything that is in the public right of way for the storm line need to be
included with the calculations?
3) Do any items in the deferred improvements agreement for Buckingham
and the future storm line down 1st street need to be included in this DCP?
4) If #3 above is no I assume that street patches and minor curb repair
is all that would need to be included for the remaining work.
5) The West entry off of Linden is being widened - I assume the
sidewalk, curb cut and C&G up to the City easement needs to be included?
6) The Water meter pit is noted as V on the spreadsheet - we have a 2"
does this change anyting fee wise?
7) IF #3 above is yes - does the COY Ditch need to be included?
8) There are some existing storm lines that will be abandoned and flow
filled - do they then need to be included in the calculation?
9) We may need to lower the 24" NWCWD main that runs down Buckingham -
does this need to be included in the calcs?
Sorry - didn't realize I had some many questions till I got looking at
things. Any help with these would be greatly appreciated.
Thanks again
Matt
----Original Message ---
From: Marc Virata [mailto:mvirata@fcgov.comj
Sent: Thursday, May 18, 2006 4:43 PM
To: mjohnson@swinerton.com
Subject: Re: New Belgium Brewery - DCP Spreadsheet
Matt,
Attached is the spreadsheet for the DCP permit. Let me know of any
questions or concerns. Specific questions regarding the actual entries
in the spreadsheet might require myself to inquire with our Chief
Engineering Inspector for additional clarification.
Thanks,
Marc P. Virata, P.E.
`Marc Virata - RE: New Bel ium Brewe - DCP S readsheet
Civil Engineer II
City of Fort Collins - Engineering Department
Phone: (970) 221-6605
Fax: (970) 221-6378
mvirata@fcgov.com
>>> "Matt Johnson" <mjohnson@swinerton.com> 5/18/2006 3:43:04 PM »>
Hi Marc,
Matt Johnson with Swinerton Builders here. I spoke with you last week
with
regards to the DCP permit for New Belgium and you indicated that there
was a
spreadsheet that you could e-mail me that needed to be filled out for
this
permit. If this is correct could you please send me a copy. If you do
not
could you please give me the contact person to obtain this .
Thank you.
Matt Johnson
Superintendent
Swinerton Builders
(303) 809-4976 << File: Prjct Quan Cost Est sheet 2004a.XLS >>
Ci ty Manager's Office
February 14,1006
Lora Hecknivr
New Belgium Brewing Company, Inc.
500 Linden Street
Fort Collins, CO 80524
Re: Request for Permission to Relocate Coy Ditch
Dear Ms. Heckman:
BY MESSENG> R PICKUP
Thank you for your inquiry regarding the request of New Belgium Brewing Company in
connection with the proposed relocation of Coy Ditch, in which the City of Fort Coll ins has a tcn
percent interest. As 1 understand the proposed activities, Now Belgium will relocate the exib(ijig
Coy Ditch as it runs in a pipe from Id1 Street oast to 3`d Street and south across Buckingham
Street into a new casement on the property of New Belgium adjacent to the north side of
Buckingham Street. You have been asked to obtain preliminary approval and consent from the
owners of Coy Ditch. On behalf of the City of Fort Collins, I hereby give the City's preliminary
approval and oonsem to move the Ditch as described, and acknowledge the City's intent to
further dbcuss and cooperate with New Belgium in connection with the Ditch relocation, please
- - note-that-this4euer-is-intended.ncitbtcto,constlm regulatory approval of any loud, nor to waive
any regulatory or other permitting or approvals required from the City in connection with this
project
Thank you for the information you have provided mgarding this project, and for contacting the
City in this regard.
Sincerely,
�qm�
Darin Atteberry
City Manager
cc; Daylan Figgs
Carrie Daggett
3tIDlaPbrteAvmue • P0Jk x58o • FatC91hw,C08 22drsso • (9M)221-W - PAX (9?o)27n-ewr . t-pa(v7n)224.WM
WWWicgov,com
L/£,d 81£9T220L6:0i L29T£220L6 NOIS30 UH3:wcJ9 L0:20 9002-9T-ff-U