Loading...
HomeMy WebLinkAboutNEW BELGIUM BREWERY FOURTH - Filed GC-GENERAL CORRESPONDENCE - 2006-09-20North Star �aaft, design, inc. July 28, 2005 Ms. Sherri Wamhoff City of Fort Collins Engineering 281 North College Avenue PO Box 580 Fort Collins, Colorado 50522-0580 Re: New Belgium Brewery — Request for Variance 1 — Curb Proj: 110-12 Dear Ms. Wamhoff: The following is a request for variance from the Table 7-1 — General Parameters — Curb & Gutter Vertical in the "Larimer County Urban Area Street Standards, October, 2002". This variance is requested to allow the curb to be eliminated on the north side of Buckingham Street for approximately 800 feet. Buckingham is a minor collector street with parking. Buckingham is proposed to be improved to the collector standard for approximately 1700' from the intersection with 1 s` Street to the east. Drive over curb with attached sidewalk exists along the south side of Buckingham from I" Street to 3rd Street. Approximately 200' of vertical curb with attached sidewalk exists on the south side of Buckingham east of the proposed improvement. The remainder of Buckingham currently has a rural type section with shoulders and a borrow ditch. It is proposed to construct Buckingham to the collector standard width and accommodate all of the required lanes. In place of the vertical curb, it is proposed to install a 30" wide concrete edge to prevent the asphalt from raveling and define the street edge. Since there will be parking along this edge, this parking aisle and the bike lane will provide a 14' recovery area if a vehicle inadvertently leaves the designated through lane. A bio Swale will be constructed in the parkway and a walk will be constructed north of the bio swale. The parkway will be widened to 10' to accommodate the bioswale and the required street trees. The walk is also being widened to 8'. The swale will be approximately 1' deep and will be used to convey runoff from the street east to the intersection of Buckingham and Lemay Avenue. This swale will also provide a water quality component that will help remove pollutants and particulates from the street runoff prior to the runoff entering the storm system and the Poudre River. This swale will not be used to treat any runoff other than the street and sidewalk. Any other development would be required to provide its own water quality component prior to discharge into the storm system. The bioswale will be lined with approximately 10" to 12" of sandy soil to promote percolation of the runoff water into the soil. The swale will also be landscaped with low maintenance plantings 700 Automation Drive, Unit I Windsor, Colorado 80550 970-686-6939 Phone • 970-686-1 188 Fax UV,UVV 'AWW OFF1499 or CHARLE6L WC-VCQ W0013, RIS & MAY MARK R. DAVIS -MS HIQH�L P. WLVIAND "MorcDOIONAL coNPoMnON WILLIAM h ROC[R4 I11 Y PYi!(LL 1775 nH ERMAN (TREE I. NU ITC 1600 DARGAd1AYTOM K"CR A L. ORVNOIH LY.t .PNTI 32saVVElt, COLOP400 0MG3•4=S RO8C" fI"LA"O O. I "CREW PCTCM 4"KA. 0. HIMIANON MANM1 J. JACMIMIAN TCLs.T10NL' (Coy Oai•77Cp OTEVEN A JONHOTON FAG51MILC 13031 030-a77L OF COUNOCL euacme a. MAMcu P. MICNAEL LUDWIG MN.Lo L aoOv January 19, 2006 Ms. Lora Heckman Project Engineer New $elgium Bmwing Company 500 Linden Street Fort Collins, CO 80524 Dear Ms. Heckman: VAIL OFFTGE MARKOT PLACC MUM1 Wd v uric 210C 4I1" U.O. 111CH1VAY O i e4 CAGLO.VAIL COLONADO aIOlC P.O. mox 4000 AVON. COLORAOO 010E0 DCNYI[A UN[ 17021 OOA.I010 TW6CMONC IOrq Y46440T V.giylu (OTC) 9A". 04a COWARD L WCOO popp.1974, WI\LIAM K P43 (RRwo=j FAQUAILE L This is to tbllow Up our conversation and your letter dated January 29, 2005. As I have indicated to you, this firm repres= tine interests of Jim and Ruth Hoffman and Charley and Dorothy Whislcr regarding the Coy Ditch I have spoken with the Wltialcrs and the Hoffmaas regarding your request My clients arc concerned regarding the affect the enclosed culvert may have upon the flaw of water in the ditch. They also want to ensure any documc nation regarding the ditch easement is reviewed by their water attorney. Thus, they will retain Tutdc Applegate, a water engineering firm, and Peggy Montana, Esq. of 1'rout, Raicy, Montana, Witwcr & Freeman to Overscc their interests. In order to cover the costs for these consultants and to consent to this 'aquas; my clients would require payment from Now Belgium Brewing in the amount of .$15,000-00�Secondly_as..pnrL* any-agm=ent...the.easementwouktaaed.to.rc$eet.thatNew.. Belgium or any subsequent land owner of the property would be responsible for the maintmrancc and repair of the culvert, including removal of debris. if It'ete terms arc acceptable, my clients would agree to your client proceeding with this project as proposed. if you regtLift any further documentation to proceed with title project please let me know. If you have say questions or would like to discuss this further, please do not hesitate to contact me. 8iecarely yqur8, Mrwntad Michel P. Williams cc: Clients L/t"d SL29T220L6:01 L28t£220L6 NSIS30 HHB:wOJJ 80:20 9002-9t-83d Lora Heckman New Belglum Brewing Company, Inc SOD Linden fort C0111ns, M.80524 tte: latter of Intent Tor future easement Dear Ms. Heckman, I This letter Is to adDWM%ge our intant'to furdw d=ss and grant ea6a�nent.fir piping the Ong Coy Dttdi from 1st SGaet east to Srd Street and south across Buckingham Street The eademant w111 be located wlgrin &A property adjacent to the• north side of Buckingham Street car e* owned by the New NAM Brewing Company, Inc. I N W RRORA�aR, - • mu UNDEN STMZT Slncerelyp - FOA'r COu S - COLORADO 90524 Y76,221.OS74 Die HU1, Pml11 dent •-. O r� .. `497o-2-'1.0555 Springer -Fisher, Inc- - Date. 19% Interest buy Duch L/S'd 8L£9T220L6:Oi L28T£220L6 NE)IS30 UHB :WOJd 80:20 9002-9T-83d ---a2XWtooa-Teuaaua..ituraos-rai-ease-DaRaaeo a 1100:/40: J DEVELOPERS DtvlastREo REAtP! Febmary 16.2006 "Heckman Now Belmum Brewing Co Soo ,mien Ft Collins CO $0524 Re- Coy Ditch Dear um "As tenor Is being sent eft bdlalf of Ft Collins Pardtory x LLC, Wo ere is tRelpt of a letter dated Jmmwy 27. 2006, fiom blew Belj¢ ms Bmwing Company, a copy of which is attached. and rucrally do trot havo sW objeotion to Now Bol;h&g proposal outlined in that 1009r. Notwithstanding the fhragol-a& thfa I0W cMdanoa only ma intent to Atrgm dlWM Ibis matldr with New Belgium and to reasumbly coopmIN with nspeet thereto, eubjoot to oorreoeipt, review and approval ofttpF UwWopleoa and q=Wcat;eng end dmmmmtion tiering to the propoged 1mpwvom4rte. R,eg,onol A•opertyM,nnnger b'10elp�Y/ ea- ear �eR, enad�tipp0, Ohb aauz i21 cass.ssmiq,�2t6.7re,1 La0lwww.ee'c.am L/9'd BL£9122016:O1 428i£22046 NDIS30 kHH8:wOad 80:20 9002-95-63A 5 Lora Hedmwn New Belgium 1306wing Company, Enc. 5UO Lfedetl Street Fort Collins, Co hf4Sit4 RE! LetEer of Intent for future easerent Dear Ms. Hadamn, iris lem6r Is to acknowledge our Intent to furdter dWcussand grant easemerrl for piping the existing Coy Ditch hqn 1st Street east to 3rd Street and south across Isud drigtham Street. The easement vrili to Ioplad within the property edjacart to the north side of, rM oRro•aWD BueklAgtram Sheet currently owned by rh4 New -Belgium Bre►ving Company, Inc snnuv,>xvltivar Sinoarely, Poxrcoum COLOW OICS24 , 97tlns-029 Rick Merkel fax 97h22r-0535 Regional Prop@rty Manager .. Date Developers D vmftd R49lty 35% Infcrest Coy bitch L�L'd BL£9T22OL6:01 L28T£22OL6 NOIS30 dHe :wuaj 20:20 9002-9T-83d April 19, 2006 Paul Attached is information that Kim Jordan submitted to Don, per our request that they work on an agreement with the Ditch that they would be okay with future realignment of the ditch. Don is out the rest of this week and he asked me to forward this onto you for your review and comments. We had meet a couple of weeks ago to talk about what we would need to get from New Belgium and the Ditch Company to be comfortable that we would not have any problems with relocating the ditch in the future even though they do not want to provide what they consider a final design at this time. Does this get us close to what we need and what you were expecting? 'APR-I6-2006(TUE) 16:29 New Belgium Brewing (FRX)9702210535 P 001/008 Company, Incorporated 500 Linden • Fort Collins, Colorado 80524 USA (970) 221-0524 9 Fax (870) 221.0535 w ncwbcl 'um corn To: T)ON RQ�m a� Fax Number. ZZf (03 OP f:iy col!i05, Phone Number. UA-(a From: Lora, Ht&man (;w kllblJor4.k) Date: 4 (f$[pb Number of pages Including this one: �n 1 a racked are. +e 1646V5 4 ?r6roin Ary cA.pptvrxZ -�V]r +11Y, Goy 9+rA, owerrs - D Wcw 13613iuw, �jr�W'r,n q ��A.n7 -�v -�'� I7✓DPDSCc� �g7� n pipe, +� c �rcA+e all xVM 4toj;n +hese- per ytur ,regt)e4+ .b �►rv, Jorda�t �`�aY P►ta15*60 WtAut. k-5 4 y� viec). W,-kat at h-�,r�.rocl,o,,. 44 ptu�9, Ride Your Bike to Work APR-18-2006(TUE) 16:29 New Belgium Brewing (FAX)9702210535 P.002/008 Owsors of the Coy 131wh tl ■ Dowlopon 01Vtln10W Rick Morkol: O}04e: 303.777,59301 Coll: 303.001.9513 0splomll Propeft Mmopor 6409 wart Reed, 9utle VVO Ands, CO 40002 95 o yyS.Y ur O,4Ml0Y'YVIIINOI'rj'r r, i�� i�4,'�,: %yy,V 01 w'jpl mrtl , r�x57ii ���,i. r�� it �l��arw.hn(I RE P1diClty�r5097J01i>IjNtMk°6�"�.4� � rOg l; ry 1 , '� � I j#� pu71i, , a " 1 Lill �"�?�. '�t•1471s �r.A' "F tYY #Y.'>',. r^ ! „vl dwr ,^r�'c MlkemtlMppaentrlbdm0lyandy,IMnl�tlSg r•Ih l,m��,t Pbrolh Altl 1k1+ jIfFtno aed hnd Veuel AtlMihePlp(oMryu{III lIm.p�itfry •• 5� �l+"ij1 Ca�Ilsilq�Mr20 tl'�i'ron,pgtlt�btirmUlY;bh��, �'ti',��� r'��'"��'.NY��{�.If �, idr r� ✓� 4!✓C i rR 6 SRW,� J* M 0 �l,'�ji�, �ry J M Ipp'"r11yi� 77A 5 t Kt„r .J4p iMhRT I NJ yl�li 1 S 4AM .��+ y'4' i9n�. t'.T��jf4h �wh^ trtltlrpp'Nu;.kIi �w.wahry�,n�� a , 'CzS';"rky �1 �k JIrt1 'ae"la!�use f itrantlto'Cln"dig eeWGo A`CouOrshk'^e��i r'� w ;r��20 +✓..�A�cF4�+."v vr�fK'$Y#'&7»✓�.+t7aM'10Gfiekft5%tlu�NJe7��v'�M1�4'.4,Kxe �'�h I b rTIqJ IM �., ✓ a 'J 11 1 ,'t Otivg,W O lhmolO1941 wmawo r�prpopkf$gY1PGTlie 1 1rlsrPr01111g11Lglr7'i 4SprTnptlr 1 S tlner�Inc.�jaNhmllyOuelneuwltflTwVtlwlaw0an�{LaViifi v r�.ry r..4oryI9C4f��1019Ar0'�t pie OM'�IgIl: IKdpl f°y"effiYkq'PlYekltl e q$ Cgllhlt on R"011moomill 0jtmit0httl } Bl1'S,' I!Id Wt�l ¢p P#9iE,q��tQ���hL��"h I CO Zi0 0r tl 9 n tl 0 1 I 0 Rpptl 1 t'q � I Rtll � o 9 APR-1'8-2006(TUE) 16:30 New Belgium Brewing (FAX)9702210535 P.003/008 DEVELOPERS DIVERSIFIED REALTY February 16, 2006 Lora Heckman New Belgium :Brewing Co 500 Linden Ft. Collins CO 80524 Re: Coy Ditch Dear Lora: This letter is being sent on behalf of Ft. Collins Partners T, LLC. We are in receipt of a letter dated January 27, 2006, from New Belgium Brewing Company, a copy of which is attached, and generally do not have any objection to New :Belgium's proposal outlined in that letter. Notwithstanding the foregoing, this letter evidences only our intent to further discuss this matter with New Belgium and to reasonably cooperate with respect thereto, subject to our receipt, review and approval of applicable plans and specifications and documentation relating to the proposed improvements. Ric erkel Regional Property Manager 3300 Er rprw Parkway IRO, Box 228042. Bearhwwd, Ohio 44122 / 216.755.5300 / fox 216.755.15m0 / www.ddreconi APR-I8`-2006(TUE) 16:30 New Belgium Brewing (FRO9702210535 P.004/008 COMPANY INCONPOAAT■O • goo 1IND&N TrlulT POAT COLLINS COLOiLWO 80524 Y70-ZZm-0524 fu 970.221.0533 27 January 2006 Rick Merkel Regional Property Manager Developers Diversified Realty 5400.Ward Road, 5ufte V270 Arvada CO 80002 . Dear Rick, Per -our phone conversation In December, New Belgium Brewing Company is asking your permission to proceed with under grounding a portion of the Coy Ditch currently located in the City of Fort Collins Right of Way along Buckingham Street. Attached are one copy of the existing conditions and one preliminary design drawing. The reason we are requesting this is to accommodate the City's requirements for widening of adjacent Buckinghama Street to Larimer County Standards, which would move the Right of Way line further north into our property.. In order to meet these standards, the ditch would.also have to move north, onto our property, which is why we would need to pipe It and grant an easement to the owners, The City of Fort Collins requires us to have a signed letter from all the owners (by February 2 for a scheduled hearing) stating that they are in agreement with the direction we are heading. Assuming all the owners are In agreement, we would. follow up with a new legal description (to go on record), that reflects the changes upon final design. Please sign the enclosed letter and return it to us in the pre -paid envelope before February 2. Thank you very much for your assistance, and please do not hesitate to. contact me If you have any questions. Kind.Regards, Lora Heckman Project Engineer New Belgium Brewing Company Iheckman@newbelgium.com A APR-1$-2006(TUE) 16:30 New Belgium Brewing (FFaX)9702210535 P.005/008 COMPANY INGON►ORI{T6D, • 500 LINDEN STREET Farr COLUNS COLORMO SOS24 970-221.0524 f" 970,221-QS3S Lora Heckman New Belgium Brewing Company, Inc. 500 Unden Street Fort Collins, CO 80524 RE: letter of Intent for future easement Dear Ms. Heckman, This letter is to acknowledge our Intent to further discuss and grant easement for piping the existing Coy Ditch from 1st Street east to'3rd Street and south across Buckingham Street. The easement will be lopated within the property adjacent to the north side of, Buckingham Street currently owned by the New'Belglum Brewing Company, Inc Sincerely,' Rick Merkel Date Regional Property Manager Developers Diversified Realty 35% Interest Coy Ditch and native type materials. The maintenance of the swale will be completed by the adjacent property owner similar to the required maintenance of grassed and irrigated parkway area. Because of the recovery area provided by the bike and parking lanes, the safety of the driver is addressed. The bio swale provides a physical barrier to address the safety of the pedestrian if a vehicle is able to leave the paved surface. This variance from the above Standards will not be detrimental to the public health, safety and welfare. Please call me with any questions or additional information that you may need for the approval of this variance. Sincerely, �nnx�xmxi�� QP00 REG/' � KR0 �106c9F0, i n Patri a Kroetch, P 90.. 3' North Star Design, Inc. x4 • �'twS/ON AL �?� APR-i8-2006(TUE) 16:30 CHARLES E. WCAVER MARK R. G..s MICHEL P. WILLIAMS WILLIAM A. ROOCRO, III CLATTON S. RUSSELL OAROARA L ORUNDIN KIM%XPLY A ALLCORCTjI ROSCRT 0, WMCCLER "CREW D. PETERSON MARK J. JACNIMIAK STEVEN P, JOHNSTON OF COUNSEL EUO ENE 6. HAMEs F. MICHAEL LUDWIO DONALO L COOK New Belgium Brewing (FAX)9702210535 P.006/008 LAW OFFICEE 07 WOOD, RIS & 14AJ-MS VAIL OFFICE PROFESSIONAL CORPORATION MARKET PUCE GU1401N0 1775 SHERMAN STREET, SUITE 1600 SUITC 2IOC 41164 u.0. roOHwAT G 4 24 OE VVSR, COLURAMO 80203-4313 CAOLE-VAIL C06CRAOO 01620 P.01 DOX 6606 .ON. C04QRADO SIrRO TELEPNONE (303) $63-7700 FACSIMILE (303) 030.0772 Ms. Lora Heckman Project Engineer New Belgium Brewing Company 500 Linden Street Fort Coilins, CO 80524 Dear Ms. Heckman: January 17, 2006 DENVER LINE (303) SSALICI% TELEPHONE (270) 045-SW7 FACSIMILE (270) 8456022 COWARO L WOOD (I80PI074) WILLIAM K. RIS (IYI&2=)) FACSIMILE and U.S. MAIL This is to follow up our conversation and your letter dated January 29, 2005. As I have indicated to you, this firm represents the interests of Jim and Ruth Hoffman and Charley and Dorothy Whisler regarding the Coy Ditch. I have spoken with the Whislers and the Hoffrnans regarding your request. My clients are concerned regarding the affect the enclosed culvert may have upon the flow of water in the ditch. They also want to ensure any documentation regarding the ditch easement is reviewed by their water attorney. Thus, they will retain Tuttle Applegate, a water engineering firm, and Peggy Montano, Esq. of Trout, Raley, Montano, Witwer & Freeman to oversee their interests. In order to cover the costs for these consultants and to consent to this request, my clients would require payment from New Belgium Brewing in the amount of $15,000.00. Secondly, as part of any agreement, the casement would need to reflect that New Belgium or any subsequent land owner of the property would be responsible for the maintenance and repair of the culvert, including removal of debris, If these terms are acceptable, my clients would agree to your client proceeding with this project as proposed. If you require any further documentation to proceed with this project, please let me know. If you have any questions or would like to discuss this further, please do not hesitate to contact me. Sincerely yours, Michel P. Williams MPWlkad cc; Clicnts APR-18-2006(TUE) 16:30 New Belgium Brewing 1 COMPANY INCORPORATCO, • 500 UNDON STldkr FORT COGLiN9 COLOIWO 90524 970-221-0524 - fas 970-221.0535 (FPX)9702210535 P.007/008 Lora Heckman New Belgium Brewing Company, Inc, 500 Linden Fort Collins, CO 80524 RE: Letter of Intent for future easement Dear Ms. Heckman, This letter is to acknowledge our intent -to further discuss and grant easement,for piping the existing Coy Ditch from 1st Street east to 3rd Street and south across Buckingham Street. The easement will be located within the property adjacent to the -north sideof Buckingham Street currently owned by the New Belgium Brewing Company, Inc. Sincerely, Dave Hill, President Date, Springer -Fisher, Inc. 15% Interest Coy Ditch -APR-IS-2006(TIIE) 16:30 New Belgium Brewing (FAX)9702210535 P.008/008 City Manager's Office February 14, 2006 Lora Heckman New Belgium Brewing Company, Inc. 500 Linden Street Fort Collins, CO 80524 Re: Request for Permission to Relocate Coy Ditch Dear Ms. Heckman: BY MESSENGER PICKUP Thank you for your inquiry regarding the request of New Belgium Brewing Company in connection with the proposed relocation of Coy Ditch, in which the City of Fort. Collins has a ten percent interest. As i understand the proposed activities, New Belgium mill relocate the existing Coy Ditch as it runs in a pipe from 1" Street east to 3td Street and south across Buckingham Street into a new easement on the property of New Belgium adjacent to the north side of Buckingham Street. You have been asked to obtain preliminary approval and consent from the owners of Coy Ditch. On behalf of the City of Fort Collins, I hereby give the City's preliminary approval and consent to move the Ditch as described, and acknowledge the City's intent to Rather discuss and cooperate with New Belgium in connection with the Diteb relocation. Please note that this letter is intended neither to constitute regulatory approval of any kind, nor to waive any regulatory or other permitting or approvals required from the City in connection with this project Thank you for the information you have provided regarding this project, and for contacting the City in this regard. Sincerely, F,-;) C- % Darin Auebcrry City Manager cc: Daylan Figgs Carrie Daggett 300 LaPorte Avenue • P.O. Box 580 • Fort Collins, C080522.0580 • (970) 221-6505 • FAX (970) 224-61.07 - TDD (970) 224-6001 www.fcgov.com North Star �4am., design, inc. July 28, 2005 Ms. Sherri Wamhoff City of Fort Collins Engineering 281 North College Avenue PO Box 580 Fort Collins, Colorado 50522-0580 Re: New Belgium Brewery — Request for Variance 2 — Street Slope Proj: 110-12 Dear Ms. Wamhoff: The following is a request for variance from Section 7.4.1.B.1. — General Design Elements — Minimum Flowline Grade in the "Larimer County Urban Area Street Standards, March 2001". This variance is requested to allow portions of Buckingham Street to be designed and constructed with grades varying from 0.4% to 0.5%. In the past, the minimum grade allowed was 0.4%. Portions of the south side of Buckingham were constructed or below at this grade. This project will widen the road to the north and will need to match the existing grade in order to avoid complete reconstruction of the roadway. Other possible solutions would require multiple low points and compromise the ride ability of the north half of the street. This variance from the above Standards will not be detrimental to the public health, safety and welfare. Please call me with any questions or additional information that you may need for the approval of this variance. 1114 Sincerely, P'"O REG/. k5 v• T ODP\G�P KR�F�9��E i �/ U • ,LQ' n •• , 01. Patricia Kroetch, P.E."F North Star Design, Inc. yvH Sip ni AL ENaa 700 Automation Drive, Unit I Windsor, Colorado 80550 970-686-6939 Phone • 970-686-1 188 Fax Transportation Services Engineering Department September 8, 2005 Ms. Patricia Kroetch, P.E. North Star Design, Inc. 700 Automation Drive, Unit I Windsor, CO 80550 RE: New Belgium Brewery Street Slope Variance Request Dear Ms. Kroetch: The City Engineer has evaluated your letter "New Belgium Brewery — Request for Variance 2 — Street Slope" dated July 28, 2005 and the accompanying design illustrated on the "Public Improvement Plans for Buckingham Street'. Based upon this analysis, it was concluded that the variance request can be supported and was approved on this date, September 8, 2005. While the request was granted to reduce the minimum grade to .4%, this should not be viewed as a precedent for future designs not meeting the .5% requirement. Please let me know of any questions or concerns. Sincerely, _ Marc P. Virata, P.E. Civil Engineer II 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605 • FAX (970) 221-6378 ",;"%fcgov.Com Transportation Services Engineering Department City of Fort Collins September 9, 2005 Ms. Patricia Kroetch, P.E. North Star Design, Inc. 700 Automation Drive, Unit I Windsor, CO 80550 RE: New Belgium Brewery Curb and Gutter Variance Request Dear Ms. Kroetch: The City Engineer has evaluated your letter "New Belgium Brewery — Request for Variance 1 — Curb" dated July 28, 2005 and the accompanying design illustrated on the "Public Improvement Plans for Buckingham Street". Based upon this analysis, it was concluded that the variance request cannot be supported and was denied on this date, September 9, 2005. While we in Transportation Services desire to be open to design concepts that may be viewed as innovative in realms outside of transportation, we are still wanting to be mindful of how these alternative concepts impact transportation needs. In general, the City Engineer expressed concern on the increased maintenance responsibility Transportation Services foresees in allowing water to collect and infiltrate in close proximity to the pavement subgrade. In this scenario, the life of the street will be reduced from a typical curb and gutter street section where water is directed away from the surrounding street. We are faced with ongoing pavement management issues on our public street system at large and a tightening budget to handle this responsibility; to introduce this alternative cross section, we believe would not be in keeping with the welfare of the general public. Please let me know of any questions or concerns. Sincerely, Marc P. Virata, P.E. Civil Engineer II _Nl �h::+d�"• __. �.-3��-air",nr�.;�lu-,.' �'„i� -.__ .ter)?,= -- North Star �Aftw design, inc. January 10, 2006 Marc Virata City of Fort Collins Engineering 281 North College Avenue Fort Collins, Colorado 50522-0580 Re: Request for Variance #1 —Narrow street section Proj: 110-13 Dear Marc The following is a request for variance from Table 7-1 — Roadway Width in the "Larimer County Urban Area Street Standards, March 2001". This variance is requested to allow bumpouts on the north side of Buckingham Street (a minor collector with parking) which will narrow the street width in the area of the bumpout. The bumpout will cause the street to be 42' wide for a distance of approximately 80'. In this area, parking will not be allowed. The narrower street will still allow for two 12' drive lanes and the required bike lanes therefore traffic will not be impeded. This bumpout will also define the parking areas and will help to control driving speeds on Buckingham Street. This variance from the above Standards will not be detrimental to the public health, safety and welfare. Please call me with any questions or additional information that you may need for the 700 Automation Drive, Unit I Windsor, Colorado 80550 970-686-6939 Phone 0 970-686-1 188 Fax From: "Matt Johnson" <mjohnson@swinerton.com> To: "'Marc Virata"' <mvirata@fcgov.com> Date: 5/18/2006 9:21:36 PM Subject: RE: New Belgium Brewery - DCP Spreadsheet Thanks Marc - looks pretty straight forward - a couple of questions. 1) There are some existing hydrants that need to be relocated - I assume the new lines and hydrants need to be included in the counts. 2) Trenching means all excavations for Sanitary and Water from the street taps to onsite within 5' of the building? Is the storm that feeds into the onsite detention ponds considered private? or does this, as well as anything that is in the public right of way for the storm line need to be included with the calculations? 3) Do any items in the deferred improvements agreement for Buckingham and the future storm line down 1st street need to be included in this DCP? 4) If #3 above is no I assume that street patches and minor curb repair is all that would need to be included for the remaining work. 5) The West entry off of Linden is being widened - I assume the sidewalk, curb cut and C&G up to the City easement needs to be included? 6) The Water meter pit is noted as V on the spreadsheet - we have a 2" does this change anyting fee wise? 7) IF #3 above is yes - does the COY Ditch need to be included? 8) There are some existing storm lines that will be abandoned and flow filled - do they then need to be included in the calculation? 9) We may need to lower the 24" NWCWD main that runs down Buckingham - does this need to be included in the calcs? Sorry - didn't realize I had some many questions till I got looking at things. Any help with these would be greatly appreciated. Thanks again Matt ----Original Message --- From: Marc Virata [mailto:mvirata@fcgov.comj Sent: Thursday, May 18, 2006 4:43 PM To: mjohnson@swinerton.com Subject: Re: New Belgium Brewery - DCP Spreadsheet Matt, Attached is the spreadsheet for the DCP permit. Let me know of any questions or concerns. Specific questions regarding the actual entries in the spreadsheet might require myself to inquire with our Chief Engineering Inspector for additional clarification. Thanks, Marc P. Virata, P.E. `Marc Virata - RE: New Bel ium Brewe - DCP S readsheet Civil Engineer II City of Fort Collins - Engineering Department Phone: (970) 221-6605 Fax: (970) 221-6378 mvirata@fcgov.com >>> "Matt Johnson" <mjohnson@swinerton.com> 5/18/2006 3:43:04 PM »> Hi Marc, Matt Johnson with Swinerton Builders here. I spoke with you last week with regards to the DCP permit for New Belgium and you indicated that there was a spreadsheet that you could e-mail me that needed to be filled out for this permit. If this is correct could you please send me a copy. If you do not could you please give me the contact person to obtain this . Thank you. Matt Johnson Superintendent Swinerton Builders (303) 809-4976 << File: Prjct Quan Cost Est sheet 2004a.XLS >> Ci ty Manager's Office February 14,1006 Lora Hecknivr New Belgium Brewing Company, Inc. 500 Linden Street Fort Collins, CO 80524 Re: Request for Permission to Relocate Coy Ditch Dear Ms. Heckman: BY MESSENG> R PICKUP Thank you for your inquiry regarding the request of New Belgium Brewing Company in connection with the proposed relocation of Coy Ditch, in which the City of Fort Coll ins has a tcn percent interest. As 1 understand the proposed activities, Now Belgium will relocate the exib(ijig Coy Ditch as it runs in a pipe from Id1 Street oast to 3`d Street and south across Buckingham Street into a new casement on the property of New Belgium adjacent to the north side of Buckingham Street. You have been asked to obtain preliminary approval and consent from the owners of Coy Ditch. On behalf of the City of Fort Collins, I hereby give the City's preliminary approval and oonsem to move the Ditch as described, and acknowledge the City's intent to further dbcuss and cooperate with New Belgium in connection with the Ditch relocation, please - - note-that-this4euer-is-intended.ncitbtcto,constlm regulatory approval of any loud, nor to waive any regulatory or other permitting or approvals required from the City in connection with this project Thank you for the information you have provided mgarding this project, and for contacting the City in this regard. Sincerely, �qm� Darin Atteberry City Manager cc; Daylan Figgs Carrie Daggett 3tIDlaPbrteAvmue • P0Jk x58o • FatC91hw,C08 22drsso • (9M)221-W - PAX (9?o)27n-ewr . t-pa(v7n)224.WM WWWicgov,com L/£,d 81£9T220L6:0i L29T£220L6 NOIS30 UH3:wcJ9 L0:20 9002-9T-ff-U