Loading...
HomeMy WebLinkAboutNEW BELGIUM BREWERY FOURTH - Filed DCP-DEV. CONSTRUCTION PERMIT - 2006-09-20City of Fort Collins Transpohn ion Services ri Engineering Department DEVELOPMENT CONSTRUCTION PERMIT Permit Number: 0C, - 17 Issuance Date: 6 Zz OL-, Project Name: Lot 1 of New Belgium Brewery 4a' Filing, Phase 1 Project Location: north side of Buckingham Street east of Linden Street Permittee: Matt Johnson Swinerton Builders City and developer contacts: See attached Exhibit "A"for names and phone numbers of all contact persons for this project. Fees: Permit Application Fee (paid at the time of application) $ 400.00 ,r t a+ - Construction Inspection Fee (paid prior to issuance of this permit) $ 1.570.30 P�.� M- Total $ 11970.30' Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $ 43,862.50 Form of security deposited with the City: Letter of Credit PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the constructed public improvements. (All references above to the terms "Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.) 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605 • FAX (970) 221-6378 www.fcgov.com Permittee (Person who is to sign a Development Construction Permit): Individual Name- Company Name Address: CA M kill 5h6vor Q Phone number(s): Office: p -qi 3-q Cellphone: �dokl% Fax number: AQ3- I ,- ffo 3 Z Email: - IpyQ,!!'3 SiAil v,an .M AUwW Project Engineer (A Colorado licensed professional engineer who is the civil engineer, the person, responsible for the design of this project, responsible for certification that improvements are constructed in accordance with approved plans, responsible for making revisions to plans with City approval and for providing as -constructed plans Individual Name: Company Name : Kit Address: 700 AsFew.ovE uW IN 4 l Vn A ( Cc BOSSt Phone number(s): Office: Cellphone: Fax number:4A7p -Utro- V Email:-fir1,e:..n�j� aitlLQSS x.,clpvh Professional License Number Architect/Planner (The 1 Individual Name: the site design of this project) Phone number(s): ,� �• "�1 office: _��_v • a Developer (The party or parties referenced in the Development Agreement who are responsible for the Developer's obligations con fined in the Agreement -add additional names below): Individual Name: Company Name: Qonc. C Address: S©O L.^ v, Phone number(s): Office: C )n- oak- CDs QA Cellphone: Fax number. Email:(�]RsnQ,Qn�f�4a,J General Contractor (The oorltra, into ral� 1 charge of the public infrastructure construction) Individual Name: 1� ���i c Chv1�F),n Company Name Address: AT,"16A," t (p7 Phone number(s): Office: 3!] 3-U33^ °la�lol Cellphone: 303- BCAI- �lal7�_ Fax number: '3-%AQ Email:t]�,A� 5�_rJ�[�9n o✓ti UO�v� If you have no General Contractor, list all other contractors below. Grading contractor: Individual Name: Company Name: — Address: Phone number(s): Office: _ Cellphone: _ Fax number: Email: Utility contractor: Individual Name: _ Company Name: — Address: Phone number(s): Office: Cellphone_ Fax number: Email: Concrete contractor for flat work: Individual Name: Company Name Address: Phone number(s): Office: Cellphone: _ Fax number: Email: Concrete contractor for structures: Individual Name: Company Name: Address: Phone number(s): Office: _ Cellphone: _ Fax number: Email: Paving contractor: Individual Name: Company Name: Address: Phone number(s): Office: Cellphone: _ Fax number: Email: Landscape contractor: Individual Name: Company Name: _ Address: Phone number(s): Office: _ Cellphone: _ Fax number: Email: Other contractors and parties involved in the project: SUBMIT THE FOLLOWING ITEMS (Required for all projects): • 81/2"x11" copy of the Site Plan • Proposed Project Schedule • Project quantities and cost estimate for all of the public improvements to be constructed. In addition, include all private improvements that are required to be inspected by the City Construction Inspectors. This information must be submitted in the format shown on the attached form titled "Project Quantities and Cost Estimate Sheet." ADDITIONAL SUBMITTALS (Required if checked): ❑ Traffic control plan(s) for the project ❑ Proposed haul routes shown on a City map ❑ Shop drawings ❑ Other CONSTRUCTION COORDINATION MEETING: A construction coordination meeting to discuss plans and special requirements for your project, is required for all development projects. The people required to attend the meeting are the Project Manager, Project Engineer, Developer, Architect/Land Planner and General Contractor (if no General Contractor, representatives for each of the contractors expected to work on this project) l People to Attend: List the peoples names and titles for those who will attend the pre - construction meeting: ESTIMATED COST OF INFRASTRUCTURE IMPROVEMENTS: Provide the estimated value of all public infrastructure improvements that will be constructed and accepted by the City to own and maintain. In addition provide the value of all private infrastructure improvements that the City will inspect and require certification for. The estimate shall be in the same format as the attached sheet titled "Project Quantities and Cost Estimate Sheet." Public infrastructure, estimated cost: S S cG@ , SC) Private infrastructure, estimated cost: I certify that the information on this permit application along with the required additional submittals are true and correct to the best of my knowledge, and that in filing this application I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upo the property for purposes of inspection and, if necessary, to enter upon such property to , orl quired of the applicant if the applicant were to fail to perform the required worJsc , .��// Applicant Transportation Development Review Fee Date Received/ Paid.3I dAj. Project Name: WW P5ELlall/M 'FAe*j tglN(� Yk Total Amount Paids14=°O Project Location: 500 GINr4--N h% Date: 3—IS -0(, Type of Submittal Please indicate the type of application submitted by checking the box preceding the appropriate request(s): Fee ❑ Overall Deevelopment Plan (OMS amamt due Find Development Plan 110fee rounds of review $1000Cecil iUUO ❑ Additional mind of review $ 500'each ❑ Amoratim $20 x_aaer=_+$250 = ❑ MinorAmendment S250ach 0 Major Amendment S21S00 each 0 Re-xme Wm each 0 MOMca ion to Lmd Use Code S200 each 0 Wireless Telecommunication Equipment (Wig) $65 each 0 Road Projects _ acres (of roadway) X 5250 = ❑ Vacation of EasrmeWs) ••• tr of vacations _ X $400 = ❑ vacation of Righi(a)-of-way •" I of vaatiws _ X $800 = 0 DediadonofEasement(s)and/or Right(s}of-Way'•• i of dedications _X S250 = "• This fee does not include the cost of filing few. Filing foes shall be ddMoeti datthetineoffinaldocumentsubmittalendwillberequiredPdor to filing. ❑ Pitied Development PlanMR) or Basic Development Review Projed requiring Transportation ServiasReview and/autility pin review. Tlusfee iaclades 3 rounds of review. Ddached Singte Family $160 permit _ A of units X 3160 - y ar olha residual tm8s $115 per unit N of units X S115 - Commercial, lidworial, Retail, and/or Non residentisi building square footage $0.25 per square foot _egSX$0.25= Size of the development (area being platted or if not being Platted size of pared accompanying all development improvements) S250 peracre _ acres X S 250 = Project fee S2,000 each Total of above amounts iea If this fee amount exceeds $30,000 then the fee amount shall be adjusted with the following formula: $30,000+'/a (the amount ova 30,000 The in"== fee for any residential ONLY project shell be $5W per residential unit This check should be used to verify the fee amount (does not apply to mixed -use devdopments) PDP fee Shell -be the lesser of this amount or the above calculated amount. Y of residential units X $500 = Reduction for affordable housing - a copy of the City letter catifying/ snhorizing the affordable housing shall be provided with this application. Amount of reduction to be applied Total owed for PM $ 100 0 F Land Use Information: Total matter of single family detached umitx r/Ih TotalmatberofmnlbfamtlylodwmWcntWunits: Nlk Total number of certified affordable dwelling units (a copy of the letWoutbarirationisrequhad)c WA Non residential building square footeg= sq 8 Gross Acreages a 6 ears General Information: Owners Name(s): k 1 M TCiA-I li Strectaddress: 500 i-IMMAI hT city/Statcaip: Fc� LyL11 "5, .: it $o5a TetePboW- `r O-del 1- 0514 Fax 170 -4, 1-0535 Appficauts/ Consultants; Firm Name: lJ b4A Contact: /,GIBE OL/OENB�'` Streuaddress: 446-� I A-*VVV*V0i/1/ city/Statat Zip: F GOL ....... f 2 S Telephone: 970-,1.2;-•%577 Fax:... - ,-x r - : x' 0"�7 Certification: By signing this permit I acknowledge that I am acting with the knowledge, consent, and authority of the owners of the property (including all rrr-: � having legal or equitable interest in the rem ;,r^r,'tv, as defined in Section 1-2 of the City mac; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished Pursuant to said atdbority, I hereby permit City offivaais to ender upon the property for purposes of inspection. cc: Christie White, Engineering Development Review F_„nne wing %NO M 3. Construction time restrictions: Development Construction Permit, Page 2/6 4. The applicant understands that additional permits maybe required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the aermit fee paid for this permit, whereupon the applicant must re -apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29- 678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the Development Agreement does not specify times for completion of public improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit. 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City; (2) punch list items from the final inspection are completed and accepted by the City; and (3) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans; and the "as -constructed" plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. 10, The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP's) that can be installed prior to construction must be in `rr �%W Development Construction Permit, Page 3/6 place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. 11. No work (including grading and construction access) shall be started in State Highway right-of- way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: Permittee's acknowledgment signature: By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditions so stated in is permit. Applicant/Project Manager' s Signature: Date: o 611 Approval for issuance: Ac-ity. Engineer Approvat�)�,// Date: 61F- � (� (Permit Issuance Date) Development Construction Permit, Page 4/6 EXHIBIT "A" DEVELOPMENT PROJECT CONTACT PERSONS Project Name: City Staff Contact Persons: Development Engineer: Construction Inspector: Lot 1 of New Belgium Brewery 4`h Filing (Packaging Hall) Marc Virata / City of Fort Collins Engineering 281 N. College Avenue / Fort Collins, CO 80524 970 221-6605 Lance Newlin / City of Fort Collins Engineering 281 N. College Avenue / Fort Collins, CO 80524 970 221-6605 Current Planner: Ted Shepard / City of Fort Collins Current Planning 281 N. College Avenue / Fort Collins, CO 80524 970 221-6750 Water Utilities Engineer: Roger Buffington /City of Fort Collins Utilities 700 Wood Street / Fort Collins, CO 80521 970 221-6854 Erosion Control Inspector: Bob Zakely / City of Fort Collins, 700 Wood Street, Fort Collins, CO 80521 970 221-6063 Natural Resources: Doug Moore / City of Fort Collins, 281 North College Avenue, Fort Collins, CO 80522 970 224-6143 Traffic Operations: Eric Bracke, P.E. / City of Fort Collins, 625 Linden Street, Fort Collins, CO 80524 970 224-6062 Street closures: Syl Mireles / City of Fort Collins, 625 Linden Street, Fort Collins, CO 80524 970 221-6815 Development Construction Permit, Page 5/6 Transportation Planning: Dave Averill / City of Fort Collins, 215 N Mason Street, Fort Collins, CO 80524 970 416-2643 Forestry: Tim Buchanan / City of Fort Collins, 281 North College Avenue, Fort Collins, CO 80522 Light and Power: Janet McTague / City of Fort Collins, 700 Wood Street, Fort Collins, CO 80521 970 224-6154 Developer' Contact Persons: Project Manager/ Applicant/Developer: Jim Spencer New Belgium Brewing Company 500 Linden Street Fort Collins, CO 80524 970 221-0524 970 221-0535 (fax) jspencer@newbeigium.com Owner: Kim Jordan and Jeff Lebesch New Belgium Brewing Co. Fort Collins, CO 80524 970 221-0524 970 221-0535 (fax) Permittee/General Contractor: Matt Johnson Swinerton Builders 6890 W. 52 Street Arvada, CO 80002 303 423-9242 303 809-4976 (cell) 303 423-0632 (fax) mjohnson@swinerton.com Project Engineer: Patricia Kroetch North Star Design 700 Automation Drive, Unit I Windsor, CO 80550 970 686-6939 (w) 970 686-1188 (f) tricia@northstardesign.com Development Construction Permit, Page 6/6 Architect/Planner: Angie Milewski BHA Design 4803 Innovation Drive Fort Collins, CO 80525 970 223-7577 970 223-1827 (fax) atnilewski@bhadesign.com (and) Rick Gunter Ware Malcomb 6120 Greenwood Plaza Blvd, Suite 120 Greenwood Village, CO 80111 720 488-2626 720 488-2625 rgunter@waremalcomb.com 4Ai N 0 0 IV 18 8 m J 0 U> W N+ O b U J Q• U Y W N i o> voo m om *T3d cm +�c ;D�0�Aw ..,o �� u°o� <� CD a m a 01�mam m m m=$ M,=mNN�.pCm m N A O m<D d�3�(pQ-3 ° :� D �- > > a�ii7 .. 3^�Nmnin- c QRe M. of a.N0 °� m °Q N '9, n Om CA J J y p°j x `� _, �. 1 ��m 3 oar�afD CD o� 9CZ >' riD3 O 0 pp 3 TO w x CD �, m ° 0 m m 0 SW »d m D fA ; = ' : cn - 2 C 110 k -� m H m m 0 c � N Mm z m c_ -+ m A m m 0 z y-40 O- p.Z m v�cnrrrfnr rrr C�(�rr in iA N. m 0 1 k ?1 ?1 ? .'<'!o 0000000777 0 0 { T oZ mm==x=x xx a M zi mm m Am om z o N O (Attj�m 05 200 r m o r Z 1 z m m v Zm 0 0000000 Nf-+*OWCfO 0l010oo M0 � AOi ca n ti,c -o m N T (A N �q W A NNN N WfA <y 0-1 3 �C C mz Q fA fA (AO m 040-+/9N 0 A O W W o— o O OOO fT fefAfA 0400000tAN N O O O O O O O O O (T O O W N69[A 0 0 °1 N N W O O O D 1 C = p P.0 i m z O O O I V O O f T � o 0000000 0 0 00000 000 0000000000 000000 000000 = m On < m zr a'r w q {p `Of A V W W N G m w fA A W W 04A Wto 0fA 0 to 0fA 0 0to 10 oEA to<A 2 o O N o 0 0 0 0 0 0• O O O O O O O O O O O c 3 oocno0oo 000' 000000 00000 m T 0- 0000000 000 000000 0 o o o o cc O rnm a a E7 4 WMtA(A40 4+69 omcp v EA W e�*9 fA 00 O W CO W V O V V fA d/ b/ NN(TO W 00000 O O W fA EA fA W W W W 00 z r N CT O O O N 0 0 0 0 0 0 0 0 0 0 O C 01 -l-I O O O O O O T O 1 m O m-i m 4, rD O A ~ o o t oho O: 0 z O N m V O o w v d! W O O P. O O V W fA O f T O O W fA V fA fA fA O A 0 0 0 ui O O O O O O p O O 0 0 p O 00000 G 41 N i O m m J N A N i tJ O O d V N N A V N i p 10 m A 41 N+ O W m J z m0 $Scm0mK K"`L'41 3D10-4 w m�[0NT m c'm"�'!»"3� ®m��o W &'mm� o m_Ssc� <5 O` m cO�m m m fD �� y� m 1pm� m�a n 9 -� d n 3T0 z r v 3 3 -( m O, �A z D' T 0 emu, ' � Z a3i '`m--' _ o<< 0 m 5.0ic C y v ' y C y A O (mC �m O Z m -n0 TC7 �n3�nC A� NlnrrrCnr ���my���rrr ��n(�rr D� Dn �Z j<T?I'n (n xx22xx T'nT ==j TI-n wp m T m z m gm yAm ,6z1O .{ �p3 A z H m m g mo m Ll r -4 W G o r m< m m= G mm N � m m O S 0O0OOOOO AOWON W O1 OwC�Z0 m 4wm1z� � v v O EN (A (QQA QQ N N N N W J y± 0-4 C C Cif 0 m ,�',c4iwwo�o So25 og000cn �pp�"P. �m �'{z� .a 9'*800�00 0000 Soci� oSooe� m _i 0Z(A p yTio m?(JI rn CO A.0WP.00� 5�0000S o��a 9.0 N O O O O O S S O c �' SSoSBSS S88S8S8888 SS$S8 rn T 3 T �Am9 z �oT m w mOS%A� fA (A d1H fA dl W W W v0 J v 00 O W W W W 00 (v-Le �Z AA'll.P 00� O W CC �IJ �I W W W V V Z o mZa m u nr 0 i 0. z x R0 fAWM fA WfA N��qq N��qq W Wd1 pNp W�p fA W f��l W O O O O O O ONO 0 0 0 N N O W (O N O N $SSBSS S8$SBSSSSS $88885 DEVELOPMENT CONSTRUCTION PERMIT APPLICATION (2/16/99) For City use only: Application Number: A I I - � Application Date: Permit application fee: $� " INSTRUCTIONS: 1. Complete this form (some questions may not apply to you) and attach all necessary documents and submit to the Development Engineering Section of the City. 2. If you have any questions contact the Development Engineer at 221-6750. 3. Submit the Application and pay the Application Fee at the fee at the Engineering counter at 281 No. College Avenue. PROJECT INFORMATION: Project Name (as approved by the City): +PLrat.y Project A.K.A. (Marketing name if different from Project Name): Project Location: Property Owner(At the time of this Individual Name: K,,,m Company Name : Address: c tcn L'xv% Phone number(s): Office: C ')C)- 8a 1- C)S Cellphone: Fax nurl!ber: -_ Email: k t e�PcXotn e�i1eJ ClDrn Applicant/Project Manager (The primary contact person for all matters regarding this project, and the person responsible for all matters referencing "the Developer" in the Development Agreement for this project): V. _ _ n n Individual Company Address: Phone number(s): Office: 200 ^ qa k- O5,,;)t4 Cellphone: Fax number: Email: ,�fyi<v)Lj � Oak1�y nn