HomeMy WebLinkAboutSHOPKO PUD TRACT B - Filed CS-COMMENT SHEETS - 2006-06-16PROJECT
ii COMMENT SHEET
City of Fort Collins
Current Plannini!
DATE: July 30, 2003 TO: Engineering
PROJECT: #28-03 SHOPKO P.U.D. PAD B — TYPE I (LUC)
AI I comments must be received by Steve Olt no later than the staff
review meeting:
August 27, 2003
Note - PLEASE identify your redlines for future reference
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other
Utility Redline Utility _Landscape city of Fort Collins
accommodate existing trees. An existing Honeylocust tree, located on the western
perimeter of the site, has been relocated due to a proposed water line conflict. Plant
counts in the plant schedule have been adjusted to reflect the proposed
landscaping.
Light & Power
43.
Parking lot lighting has been shown on the Site and Landscape Plans.
Site Plan
44.
Landscaping has been added around trash enclosures to provide screening. A
walkway that allows pedestrian traffic from the shops has been added.
45.
MESA — Retaining wall system image is included in the re -submittal ( Refer to Sheet
A-1 ).
46.
Bike racks have been added to the north of the trellis. The potential for bike racks
hindering the sidewalk has been taken into consideration.
47.
The width of the sidewalk is increased to accommodate for the 4' unobstructed
pedestrian movement and the 2' car overhang.
48.
This proposed section of sidewalk is now shown on the Landscape Plan and
adjusted to accommodate an existing Pear tree.
Utility Plan
40.
Acknowledged.
41.
An agreement will be completed allowing Shopko the ability to use the private storm
drain for their runoff. Since it is a private storm drain there will be no easement
required.
Engineering
General
27.
The Project Title has been changed to Tract B, Shopko P.U.D. on the Landscape
Plan.
10/16/2003A\DLC\DL Net ork\DLC TEXT\LETTERS\PDP - SPRLTR SHOPKO.doc
Landscape Plan
15.
Contours have been removed from the plan.
16.
Existing and proposed easements have been indicated on the Landscape Plan.
Site Plan
13.
Utilities, contours, and landscaping are removed.
14.
Existing and proposed easements will be shown.
19.
Pedestrian access ramps match utility and landscape plans.
Utility Plan
17.
Acknowledged.
18.
See resubmittal.
Grading will not be phased, it will all be done at one time.
20.
Acknowledged.
21.
See resubmittal.
22.
Acknowledged.
23.
Corrected.
24.
For phasing, see Sheet 3.
26.
See resubmittal.
29.
Utility coordination meeting was held.
10/16/2003A\DLC\DL Ndwork\DLC TEXTILET- ERS\PDP - SPRLTR SHOPKO.doc
37.
The trellis will not be over a utility easement, but a private use agreement.
Light and Power
Light and Power
1.
Two transformers have been located on both ends of the buildings. The transformer
location will meet the clearance criteria. Landscape will be used to screen the
transformers.
Police
General
12.
The pines will be spaced adequately at their current size to allow surveillance. As
pines grow, they will be limbed up to allow visibility under their canopies. New
photometric plan has been developed taking into consideration the 0.7 fc.
Stormwater Utility
Easements
25.
The existing storm drainage easements will be vacated concurrently with the
dedication of the relocated line.
Grading Plan
11.
See Sheet 6.
30.
See Sheet 8.
Storm Sewer Alignment
10.
Storm drainage under trellis will be private line and not a public easement.
Utility Plans
28.
As discussed in the utility coordination meeting, site constraints require some issues
to go unresolved, i.e. moving the manhole requires a stormwater drain to run
dangerously close to the building foundation.
10/16/2003MDLCDL Ndw«k\DLC TEX-PLET-MPS\PDP - SPRL7R SHOPKO.doc
Transportation Planning
Transportation
35.
Refer to Issue #47.
36.
Refer to Issue #46.
Water Wastewater
Utility Plan
32.
Acknowledged.
36.
Utility easements will be completed for all water service lines up to and including the
curb stops.
Zoning
Zoning
2.
Topographic contour lines have been removed from the Landscape Plan.
3.
A van accessible parking space has been added.
4.
Building envelope, dimensions, distance to property lines are labeled.
5.
The Phase lines are clarified.
6.
Landscaping has been added around trash enclosures to provide screening.
7.
Requested copies have been submitted to Planning Department for distribution.
10/16/2003A\DLC\DL Nework\DLC TEX PLEE=RS\PDP - SPRLTR SHOPKO.doc
Enaineerina/Susan Jo
1..Although we do not have an easement exhibit, the easements are clearly
outlined on Sheet 4 — Utility Plan. -/ < 'i , , I {
2. The project name is Tract B, Shopko P.U.D.
3. See Comment 1 above.
4. A utility coordination meeting was held.
5. Acknowledged.
Stormwater / Basil Hamden
1. See Sheet 4 — Utility Plans.
2. The trellis will be over a private agreement, not an easement-
3. Acknowledged.
Should you have any questions regarding this matter, please call me.
Thank you for your cooperation.
Sincerely,
DO ERSTEIN LEMBURG COMMERCIAL, INC.
W ' &
Daniel fF Bemth, CCIM
President
10/16/2003A\DLC\DL Network\DLC TEXr\LETTERS\PDP - SPRLTR SHOPKO.doc
Number: ZJY Created: 8/26/2003
Sheet 4 - Update the street cut note to read:
Limits of street cut are approximate. Final limits are to be determined in the field by the City Engineering Inspector. All
repairs to be in accordance with City street repair standards.
You may also place this statement under "NOTES" so that you don't have to put it by each and every street cut.
C
Number: 21 Created: 8/26/2003
Show and'Iabel all existing and proposed utility easements, both on and off -site. Please dedicate additional utility and
drainage easements by separate document. It may be helpful to prepare an easement exhibit showing what's existing
and what's proposed so that we can keep it all straight. You will want to vacate the portion of the existing utility
easement that is no longer needed, however, that can not be done until the new easement is dedicated and the new
line installed.
Number: 22 Created: 8/26/2003
May need a temporary construction easement from the property owner to the north. If so, a letter of intent from that
property owner is required before going to hearing.
Number: 23 Created: 8/26/2003
Sheet 5 - Correct overlapping labeling.
,, tCF4
Number:24 Created: 8/26/2003
Sheet 6 - Phasing?
Number: 26 a� n `"n 56_" Created: 8/26/2003
Sheet 9 and 10 -Provide details 707, 1601, 1603, and 1606. Please label all nonstandard on -site curb and gutter
details as "on -Site".
Number: 29 Created: 8/26/2003
Suggest a utility Coordination Meeting prior to the next submittal to work out the storm sewer alignment in relation to
the sidewalk and other utilities. Suggest rotating the manhole away from the sidewalk.
Number: 37 Created: 9/2/2003
No structure of any kind allowed in utility easements.
Page 2
.;�e..� . 2 roject Comments Sheet
cit,otFort Collins Selected Departments
Department: Water Wastewater
Date: October 27, 2003
Project: SHOPKO P.U.D. PAD B, TYPE I (LUC)
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
October 29, 2003
Note - Please identify your redlines for future reference
Issue Contact: Jeff Hill
Topic: General
Number: 54 Created: 10/27/2003
[10/27/03] Coordinate site and landscape plans with the civil plans to reflect the
same information.
See site, landscape and utility plans for other comments.
Topic: Utility Plan
Number: 32 Created: 8/27/2003
[10/27/03] Maintain 4 feet minimum separation between meter pit and all permaner;t
structures (i.e. building envelope, trash enclosure, retaining walls, etc.). Place meter
pits and curb stops adjacent to the main when possible.
Number: 33 Created: 8/27/2003
[10/27/03]
[10/20/031
The power source to this site will be from the S.W. corner of the site. The developer
will need to coordinate transformer location(s) with Light & Power Engineering.
Transformer(s) will need to be a minimum of 3 ft. from any structure and have a
minimum of 8 ft. of clearance to the front side of the transformer. The transformer(s)
also must be within 10 ft. of a paved surface for line truck access.
Number: 34 Created: 8/27/2003
[10/27/03]
Provide utility easements for all water service lines up to and including the curb
stops.
See site, landscape and utility plans for other comments.
Signature
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other_
Utility Redline Utility X Landscape
Page 1
Project Comments Sheet
" Selected Departments
City of Furl t oljill,
.awo
Department: Engineering
Date: October 28, 2003
Project: SHOPKO P.U.D. PAD B, TYPE I (LUC)
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
August 27, 2003
Note - Please identify your redlines for future reference
Issue Contact: Susan Joy
Topic: General
Number: 27 Created: 8/26/2003
The Project Title on all plan sets do not match the Project Title on DMS.
Topic: Landscape Plan
Number: 15 Created: 8/26/2003
Remove the contours.
Number: 16 Created: 8/26/2003
Show and label all existing and proposed easements.
Topic: Site Plan
Number: 13 Created: 8/26/2003
Please remove the utilities, contours and landscaping.
Number: 14 Created: 8/26/2003
Show and label all existing and proposed easements.
Number: 19 Created: 8/26/2003
Ped Access Ramps do not match the utility or landscape plans. See redlines.
Topic: UtiliyPlan
Number: ,I Created: 8/26/2003
Sheet 2 - 2 benchmarks are required in Line 40 of the General Notes.
Number: 18 Created: 8/26/2003
Sheet 3 - Under notes: 1. Utility phasing?
If grading is to be phased, will need a grading plan and erosion control plan for each phase.
Signature Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other_
Utility Redline Utility Landscape
Page 1
Project Comments Sheet
Selected Departments
Department: Engineering
Date: October 30, 2003
Project: SHOPKO P.U.D. PAD B, TYPE I (LUC)
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
October 29, 2003
Note - Please identify your redlines for future reference
Issue Contact: Susan Joy
Topic: General
Number: 27 Created: 8/26/2003
[10/28/031 All plan sets must be titled as: Shopko P.U.D., Tract B
(08126/03) The Project Title on all plan sets do not match the Project Title on DMS.
Topic: Utility Plan
Number: 21 Created: 8/26/2003
[10!28/03] Sheet 4 is missing portions of the existing stormsewer easement. Please submit all easement dedications
and vacations by separate document along with the appropriate exhibits. It may be helpful to submit an
overall exhibit sheet (8.5x11) showing all the existing and proposed easements.
(08/26/03) Show and label all existing and proposed utility easements, both on and off -site. Please dedicate additional
utility and drainage easements by separate document. It may be helpful to prepare an easement exhibit showing
what's existing and what's proposed so that we can keep it all straight. You will want to vacate the portion of the
existing utility easement that is no longer needed, however, that can not be done until the new easement is dedicated
and the new line installed.
Number: 23 Created: 8/26/2003
[10128/03] See redlines.
(08/26/03) Sheet 5 - Correct overlapping labeling.
Number: 24 Created: 8/26/2003
[10/28/03] This sheet will need to show phasing.
(08/26/03) Sheet 6 - Phasing?
Number: 26 Created: 8/26/2003
[10/28/031 Sheet 9 was not included with this submittal. Comment remains open.
Date
CHECK HERE LIH YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat I Site Drainage Report Other
Utility _� Redline Utility i Landscape DF--b
Page I S- Ych"V yAeAmotac
(08/26/03) Sheet 9 and 10 - Provide details 707, 1601. 1603, and 1606. Please label all non standard on -site curb
and gutter details as "on -Site".
Number: 37 Created: 9/2/2003
(10/28/031 No structure of any kind (foundations/footings, etc) are allowed in the utility easements - it appears that the
building to the west may be too close to the prcposed utility easement. The building will need to be moved to
the north slightly so that no part of the building/footings lie with the proposed utility easement.
No private structures such as stormsewer lines, private easements or detention ponds are allowed in the utility
easements. Per a discussion between Stormwater/Engineering/Northstar after Staff Review 10/29/03, it was
agreed that because of site -.onstraints that the stormsewer will become a public line once it crosses the
proposed utility easement. However, the line must be maintained by the developer, not the City. The 10" line
for the roof drainage will be rerouted so that it does not fall within the public utility easement. The detention
pond, however, will not be allowed in the utility easement and needs to be slightly regraded.
(09/02/03) No structure of any kind allowed in utility easements.
Number: 62 Created: 10/28/2003
[10128/031 Sheet 4 - Show the existing gas line.
Page 2
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planninia REM '83flU6
DATE: July 30, 2003 TO: Technical Services
PROJECT: #28-03 SHOPKO P.U.D. PAD B — TYPE I (LUC)
All comments must be received by Steve Olt no later than the staff
review meeting:
August 27, 2003
Note - PLEASE identify your redlines for future reference
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_Plat _Site _Drainage Report Other ``
_utility _Redline Utility _Landscape Ctyof Fort Collins
C'L
Project Comments Sheet
Selected Departments
City of Fort Collins
.�� a
Department: Stormwater Utility
Date: November 3, 2003
Project: SHOPKO P.U.D. PAD B, TYPE I (LUC)
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
October 29, 2003
Note - Please identify your redlines for future reference
Issue Contact: Basil Harridan
Topic: Easements
Number: 25
[10/28/031
Created: 8/26/2003
Need to vacate the existing storm drainage easements where the storm line is being removed and dedicate a new
easement for the relocated line. Provide an easement vacation and dedication exhibit.
Topic: Grading plans
Number: 30 Created: 8/26/2003
[10/28/031
Pond area must be contained outside of the public easments.
Topic: Utility Plans
Number: 28 Created: 8/26/2003
110/28/031
Please move manhole so that it is outside of the easement.
the storm sewer manhole along Boardwalk Drive is located in an area that is typically used by Light and Power
for their line (behind the walk). Please check with Light and Power to make sure that this location is OK for
them. If the manhole is kept at that location, then the lid needs to be offset to keep it away from the walk. The
line along JFK could also conflict with gas lines. A utility coordination meeting might be helpfid to clarify
these issues.
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _ Site Drainage Report Otber_
Utility _ Redline Utility Landscape
Page I
To: Dan Bernth Date: Friday, December 05, 2003
702 West Drake Road
Building E, Suite B-102
Fort Collins, CO 80526
Project: Tract B, Shopko P.U.D. Re: City Comments Project No.: 03168.1
Response
From: Oussama Abbas Sent Via: Deliver Fax No.:
No. of Pages:
CC: Attachments:
Current Planning
Buildings
59- Wall mounted lights are shown on the elevations representing the photometric plan
60- The retaining walls are joined with the building elevation.
Liohfim� plan
61- Refer to response # 59
Site plan
55- Bike rack between building 1&2 is labeled.
Engineering
General
27- Title is corrected.
Utility plan
37- No structure of any kind (foundation / footing. etc) will be in the utility easement. The columns on the south
side of building 2 will have a straight foundation (not projecting in the utility easement).
Light and Power
I-ieht and Power
1- 2 transformers have been located on both ends of the buildings. Transformer location takes into consideration
the clearance criteria. Landscape is used to screen the transformers.
\\Carr\CB Documents\PROJECTS ActivmStrops ® Stlopoo\city comments
Architecture response 2.doe
Planning
151 West Mounto!n Avenue Fort Collins. Colorado 80524 970-482-8125 FAX 970-482-8450
Police
General
63- For internal security reasons, we prefer not to have a window in the rear service door. Nevertheless, there are
windows that exist in the back elevation and the policeman can view into the building*.
Water Wastewater
General
54- Site plan, Landscape plan, and civil plans are coordinated to reflect the same information.
Architecture Page 2 of 2
Planning
151 We_;t Mountain Avenue For Collins. Colorado 805221 970-482-8125 FAX 970-482-8450
Project Comments Sheet
Selected Departments
City of Fort Collins
Department: Engineering
Date: January 7, 2004
Project: SHOPKO P.U.D. PAD B, PDP AND FINAL PLAN
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
January 14, 2003
Note - Please identify your redlines for future reference
Issue Contact: Susan Joy
Topic: General
Number: 65 Created: 1 /6/2004
[1/61041 Site/Landscape/Utility -Relabel the private use easement to show that the easement is private north of the
utility easement and public south of the utility easement. See the redlines on the Site Plan - I color coded the easement
so that it is more clear.
Topic: Utility Plan
Number: 21 Created: 8/26/2003
[116/041 1 think its safe to submit all the legal does for the proposed easements now that we've reached an agreement
on what is required. Please provide an overall exhibit along with the individual exhibits so that we can make
sure we've got everything covered. Just a reminder, the private easement is private north of the utility
easement and becomes a public easement on the south side of it. See the redlines. Please see the Site Plan
redlines - I highlighted what should be public and what should be private.
[10/28/031 Sheet 4 is missing portions of the existing stormsewer easement. Please submit all easement dedications
and vacations by separate document along with the appropriate exhibits. It may be helpful to submit an
overall exhibit sheet (8.5x11) showing all the existing and proposed easements.
(08/26/03) Show and label all existing and proposed utility easements, both on and off -site. Please dedicate additional
utility and drainage easements by separate document. It may be helpful to prepare an easement exhibit showing
what's existing and what's proposed so that we can keep it all straight. You will want to vacate the portion of the
existing utility easement that is no longer needed, however, that can not be done until the new easement is dedicated
and the new line installed.
Number: 24
[1/6/041 Repeat.
[10/28/031 This sheet will need to show phasing.
(08/26/03) Sheet 6 -Phasing?
Created: 8/26/2003
Signature Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other_
Utility __ Redline Utility Landscape
Page t
Number: 26 Created: 8/26/2003
[1/6/04] Looks great....still need detail 707 and you're done.
[10/281031 Sheet 9 was not included with this submittal. Comment remains open.
(08/26/03) Sheet 9 and 10 - Provide details 707, 1601, 1603, and 1606. Please label all non standard on -site curb
and gutter details as "on -Site".
Page 2
C i fv
Project Comments Sheet
Selected Departments
Department: Water Wastewater
Date: January 13, 2004
Project: SHOPKO P.U.D. PAD B, PDP AND FINAL PLAN
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
January 14, 2003
Note - Please identify your redlines for future reference
Issue Contact: Jeff Hill
Topic: Utility Plan
Number: 34 Created: 8/27/2003
[ 1 /13/041
The existing water service which occurs in our mapping system can not be located in
the field. Therefore a new service will need to be extended into the building on the
southwest portion of this project.
Provide utility easements for all water service lines up to and including the curd
stops.
See site, landscape and utility plans for other comments.
Signature r Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other
Utility _ Redline Utility Landscape
Page I
City of Fort Collins
Project Comments Sheet
Selected Departments
Department: Stormwater Utility
Date: January 15, 2004
Project: SHOPKO P.U.D. PAD B, PDP AND FINAL PLAN
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
January 14, 2003
Note - Please identify your redlines for future reference
Issue Contact: Basil Hamdan
Topic: Easements
Number: 67 Created: 1 /15/2004
[1115/04] Please provide a copy of the private line easement dedication for the line that goes between the two
buildings.
The area covered by the detention pond should be encompassed within a public easement, any old drainage easement
that is no longer needed f rom the original plat should be vacated. These can be done by separate document.
Topic: Erosion Control
Number: 66 Created: 1 /15/2004
[1/15/041 Please provide erosion control efficiency calculations and ersosion control security calcs in the report.
Topic: Phasing Plan
Number: 68 Created: 1 /15/2004
[1/15/04] Please show the phasing of the buildings on the grading plan or provide a separate phasing plan.
Signature
i
CHECK ]HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other
Utility _ Redline Utility Landscape
Page 1
PROJECT
COMMENT SHEET
City of Fort Collins
DATE: I Feb 1993 DEPARTMENT:
ITEM: 1-93A SHOPKO PUD -FINAL
Please respond to this project by Friday, February 12,1993
Planner: Steve Olt
No Problems
Problems or Concerns (see below)
P,47— VecrD S ANor1+e= 2 6O,u7-2rylOnly rnzi7IVT 1- "J
tn�/k1 Tk-13 (,(fE.1r L/tiJ� d F TFta ��• � �`i /�C'TF2,,,INPr>
-IF THeae IS Oc) 1L IDICATIowl 5TA-re 141:,,i1-- FOLLOCa7IN?
THLa-
�}�Ro�Ef2T� �ESC121�701.i.
V/ HA(I-) A"b CC \ J MCA -,I O.,J TH-� PLAT
I�Hy iQRE TN6ri& -r-(2A,1S ANo OJZT
CNo2o 3tA21Net A.+o �.irgnicc> o^/ CUt%l s .
�tJT� 2 /3oUNaAr1� YYIOhIt)WIENTS rU��� !
Date: Signature:
CHECK IF REVISIONS REQUIRED: ❑ PLAT
❑ SITE
❑ LANDSCAPE
❑ UTILITY
DEVELOPMENT SERVICES 281 NORTH COLLEGE P.O.ROX 580 FORT COLLINS, COLORADO 80522-0580 (303)221-6750
PLANNING DEPARTMENT'
PROJECT
COMMENT SHEET
Citv of Fort Collins
DATE: 1 Feb 1993 DEPARTMENT: ;
ITEM: 1-93A SHOPKO PUD -FINAL
Please respond to this project by Friday, February 12, 1993
Planner: Steve Olt
No Problems
X Problems or Concerns (see below)
Aj, Ave,
r�wi�����
z4e�e -�
Cv�kcti�Ct /
Cc>riCtrY1 i� hVw 4e
exnq
I
ft l e"Y-1 Ca �
NICE
Gil �i(12
��4 `Ji 2
Date: 2A Signature: A/Ult �
CHECK IF REVISIONS REQUIRED: ❑ PLAT
❑ SITE
❑ LANDSCAPE
❑ UTILITY
DEN ELOPMEVT SERVICES 281 NORTH COLLEGE P.O.BOS 580 FORT COLLINS, COLORADO 80522-0580 (703)221-6750
PL%NNING DEPAR'rME.Nr
Citv of Fort Collins
Planning Department
PROJECT
COMMENT SHEET
DATE: 21 February 1995 DEPARTMENT: FNG
PROJECT: 1-93B _. RUQY TUESDAY @ SHOPKO PUD -Final
PLANNER: Steve Olt
All comments must be received by: Friday,_3 March 1995
❑ No Problems
Problems or Concerns (see below)
Missing soils report.
Site Plan
• Add North arrow and scale to the vicinity map.
• Indicate existing parking to be removed or new parking to be constructed
Need a Plat
• Additional FZOW (to the back of curb) and easements are needed on
Boardwalk.
Utility Plans
Overall Utility and Demolition Plan
• Easements are needed for all of site work.
(continued on back)
Date: �����y`' Signature:
CHECK IF YOU WISH TO RECEIVE
COPIES OF REVISIONS:
❑ PLAT
❑ SITE
❑ LANDSCAPE
❑ UTILITY
,1
COMMUNITY PLANNING and ENVIRONMENTAL SERVICES..281 NORTH COLLEGE, P.O. BOX 580 FORT COLLINS, COLORADO 80522-0580 (303)221 6750'
.
CURRENT PLANNING DEPARTMENT
Project Comments Sheet
Selected Departments
City of Fort Collins
Department: Stormwater Utility
Date: August 27, 2003
Project: SFIOPKO P.U.D. PAD B, TYPE I (LUC)
All comments must: be received by Steve Olt in Current Planning, no later than the
staff review meeting:
August 27, 2003
Note - Please identify your redlines for future reference
Issue Contact: Basil Harridan
Topic: Easements
Number: 25 Created: 8/26/2003
Need to vacate the existing storm drainage easements where the storm line is being removed and dedicate a new
easement for the relocated line. Provide an easement vacation and dedication exhibit.
Topic: Erosion Control
Number: 31 Created: 8/26/2003
August 18, 2003
Plan is OK. Thank YOU.
Topic: Grading Plan
Number: 11 Created: 8/21 /2003
Please provide an interim grading plan showing how the Phase 2 area will be graded prior to its construction and after
Phase 1 is completed.
Please provide tree protection notes on the plans specifying that trees in the area where the new storm sewer is
proposed on the east side of the side will be protected in place during construction.
Topic: Grading plans
Number: 30 Created: 8/26/2003
Please provide cross sections along the east side of the building showing the slope from the building, the swale and the
storm line along JFK. Another cross-section along the retaining wall and pond would also be helpful.
Add tree protection notes to the grading plan. Show and call out protective construction fencing for trees to remain.
Signature
Y12-�3
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other_
Utility Redline Utility Landscape
Page t
• Indicate limits of sidewalk replacement.
• Provide ramps where indicated.
• Add street patch for H2O line.
Detail Sheet
• Eliminate drive -over -curb, gutter and sidewalk. doesn't appear to be used
anyplace.
• Where is the detail for new driveway approach used.
• Add detail D-20 additions to existing sidewalk.
• Detail for walk should show a 7 foot walk.
Topic: Storm Sewer Alignment
Number: 10 Created: 8/21/2003
It seems that the storm sewer line coming from the parking area inlet will be crossing under a trellis cover. Please
make sure that this line is a private line that would not require a public easement for it to be allowed. If this is a private
line and the then the City will not own or maintain such a line and it would thus be allowed. Since this line is carrying
flows from the main Shopko parking lot, a private easement may be needed between the owner of this parcel and the
owner of the Shopko Parcel A. Please add notes on the plan to that effect.
Topic: Utility Plans
Number: 28 Created: 8/26/2003
the storm sewer manhole along Boardwalk Drive is located in an area that is typically used by Light and Power for their
line (behind the walk). Please check with Light and Power to make sure that this location is OK for them. If the
manhole is kept at that location, then the lid needs to be offset to keep it away from the walk. The line along JFK could
also conflict with gas lines. A utility coordination meeting might be helpful to clarify these issues.
Page 2
Project Comments Sheet
I... --if Selected Departments
Citvof Fort Collins
NM�7
Department: Water Wastewater
Date: August 27, 2003
Project: SHOPKO P.U.D. PAD B, TYPE I (LUC)
All comments must: be received by Steve Olt in Current Planning, no later than the
staff review meeting:
August 27, 2003
Note - Please identify your redlines for future reference
Issue Contact: Jeff Hill
Topic: Utility Plan
Number: 32 Created: 8/27/2003
Maintain 4 feet minimum separation between meter pit and all permanent structures
(i.e. building envelope, trash enclosure, retaining walls, etc.). Place meter pits and
curb stops adjacent to the main when possible.
Number: 33 Created: 8/27/2003
Our records indicate an existing water service and fire line stub has been extended
into the area of phase 2. Field locate all utilities, show and label on plans. Clearly
define weather existing stubs/services are to be used or abandoned.
Number: 34 Created: 8/27/2003
Provide utility easements for all water service lines up to and including the curd
stops.
See site, landscape and utility plans for other comments.
IT -? 7-0 3
Date
//EHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _ A� Site Drainage Report Other_
Utility _ Redline Utility < Landscape
Page 1
. Project Comments Sheet
�
Citv of Fort Collins Selected Departments
Department: Engineering
Date: September 2, 2003
Project: SHOPKO P.U.D. PAD B, TYPE I (LUC)
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
August 27, 2003
Note - Please identify your redlines for future reference
Issue Contact: Susan Joy
Topic: General
Number: 27 Created: 8/26/2003
The Project Title on all plan sets do not match the Project Title on DMS.
Topic: Landscape Plan
Number: 15 Created: 8/26/2003
Remove the contours.
Number: 16 Created: 8/26/2003
Show and label all existing and proposed easements.
Topic: Site Plan
Number: 13 Created: 8/26/2003
Please remove the utilities, contours and landscaping.
Number: 14 Created: 8/26/2003
Show and label all existing and proposed easements.
Number: 19 Created: 8/26/2003
Ped Access Ramps do not match the utility or landscape plans. See redlines.
Topic: Utility Plan
Number: 17 Created: 8/26/2003
Sheet 2 - 2 benchmarks are required in Line 40 of the General Notes.
Number: 18 Created: 8/26/2003
Sheet 3 - Under notes: 2. Utility phasing?
If grading is to be phased, will geed a grading plan and erosion control plan for each phase.
CHECK HERE-YF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _ I Site Drainage Report Other_
z Utility _ ,c Redline Utility I Landscape
Page 1
Number: 20
Sheet 4 - Update the street cut note to read:
Created: 8/26/2003
Limits of street cut are approximate. Final limits are to be determined in the field by the City Engineering Inspector. All
repairs to be in accordance with City street repair standards.
You may also place this statement under "NOTES" so that you don't have to put it by each and every street cut.
Number: 21 Created: 8/26/2003
Show and label all existing and proposed utility easements, both on and off -site. Please dedicate additional utility and
drainage easements by separate document. It may be helpful to prepare an easement exhibit showing what's existing
and what's proposed so that we can keep it all straight. You will want to vacate the portion of the existing utility
easement that is no longer needed, however, that can not be done until the new easement is dedicated and the new
line installed.
Number: 22 Created: 8/26/2003
May need a temporary construction easement from the property owner to the north. If so, a letter of intent from that
property owner is required before going to hearing.
Number: 23 Created: 8/26/2003
Sheet 5 - Correct overlapping labeling.
Number: 24 Created: 8/26/2003
Sheet 6 - Phasing?
Number: 26 Created: 8/26/2003
Sheet 9 and 10 - Provide details 707, 1601, 1603, and 1606. Please label all non standard on -site curb and gutter
details as "on -Site".
Number: 29 Created: 8/26/2003
Suggest a Utility Coordination Meeting prior to the next submittal to work out the storm sewer alignment in relation to
the sidewalk and other utilities. Suggest rotating the manhole away from the sidewalk.
Number: 37
No structure of any kind allowed in utility easements.
Created: 9/2/2003
Page 2
REVISION
COMMENT SHEET
DATE: October 15, 2003 TO: Engineering
PROJECT: #28-03 SHOPKO P.U.D., PAD B — TYPE I (LUC)
All comments must be received by Steve Olt no later than the staff
review meetinb:
October 29, 2003
No Comment
Problems or Concerns (see below or attached)
**PLEASE IDENTIFY YOUR REDLINES FOR FUTURE
REFERENCE**
CI IECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_Plat _Site _Draina.e Report _Other
_Utility _Redline. Utility _Landscape
ate
702 West Drake Road
Building E, Suite B-102
Fort Collins, CO 80526
(970) 221-1965 Office
(970) 221-1966 Fax
October 16, 2003
Mr. Steve Olt
Project Planner
281 North College Avenue
P.O. Box 580
Fort Collins, CO 80522-0580
RE: Project No.: Tract B, Shopko P.U.D.
Dear Steve:
The following is an explanation of issues arising from the Staff Project Review Letter dated
September 4, 2003.
Current Planning Comments
Buildings
42.
A new light fixture is proposed ( refer to Sheet E2P ).
General
49.
The following addresses redline comments indicated on the plans:
Trees identified as being moved, that are in question along JFK Parkway, have been
reviewed by Tim Buchanan and accepted due to sidewalk encroachment and over
crowding issues. A note indicating a storm sewer easement has been added to the
plan. Additional landscaping has been provided around trash enclosures and
transformer locations. Parking spaces previously indicated as part of Phase 2 have
been changed to Phase 1. Proposed sidewalk locations have been modified to
10/ 16/2003A\DLC\DL Network\DLC TEXr\LE=RS\PDP - SPRLTR SHOPKOAd