HomeMy WebLinkAboutSHOPKO PUD TRACT B - Filed CS-COMMENT SHEETS - 2006-06-16PROJECT ii COMMENT SHEET City of Fort Collins Current Plannini! DATE: July 30, 2003 TO: Engineering PROJECT: #28-03 SHOPKO P.U.D. PAD B — TYPE I (LUC) AI I comments must be received by Steve Olt no later than the staff review meeting: August 27, 2003 Note - PLEASE identify your redlines for future reference Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report Other Utility Redline Utility _Landscape city of Fort Collins accommodate existing trees. An existing Honeylocust tree, located on the western perimeter of the site, has been relocated due to a proposed water line conflict. Plant counts in the plant schedule have been adjusted to reflect the proposed landscaping. Light & Power 43. Parking lot lighting has been shown on the Site and Landscape Plans. Site Plan 44. Landscaping has been added around trash enclosures to provide screening. A walkway that allows pedestrian traffic from the shops has been added. 45. MESA — Retaining wall system image is included in the re -submittal ( Refer to Sheet A-1 ). 46. Bike racks have been added to the north of the trellis. The potential for bike racks hindering the sidewalk has been taken into consideration. 47. The width of the sidewalk is increased to accommodate for the 4' unobstructed pedestrian movement and the 2' car overhang. 48. This proposed section of sidewalk is now shown on the Landscape Plan and adjusted to accommodate an existing Pear tree. Utility Plan 40. Acknowledged. 41. An agreement will be completed allowing Shopko the ability to use the private storm drain for their runoff. Since it is a private storm drain there will be no easement required. Engineering General 27. The Project Title has been changed to Tract B, Shopko P.U.D. on the Landscape Plan. 10/16/2003A\DLC\DL Net ork\DLC TEXT\LETTERS\PDP - SPRLTR SHOPKO.doc Landscape Plan 15. Contours have been removed from the plan. 16. Existing and proposed easements have been indicated on the Landscape Plan. Site Plan 13. Utilities, contours, and landscaping are removed. 14. Existing and proposed easements will be shown. 19. Pedestrian access ramps match utility and landscape plans. Utility Plan 17. Acknowledged. 18. See resubmittal. Grading will not be phased, it will all be done at one time. 20. Acknowledged. 21. See resubmittal. 22. Acknowledged. 23. Corrected. 24. For phasing, see Sheet 3. 26. See resubmittal. 29. Utility coordination meeting was held. 10/16/2003A\DLC\DL Ndwork\DLC TEXTILET- ERS\PDP - SPRLTR SHOPKO.doc 37. The trellis will not be over a utility easement, but a private use agreement. Light and Power Light and Power 1. Two transformers have been located on both ends of the buildings. The transformer location will meet the clearance criteria. Landscape will be used to screen the transformers. Police General 12. The pines will be spaced adequately at their current size to allow surveillance. As pines grow, they will be limbed up to allow visibility under their canopies. New photometric plan has been developed taking into consideration the 0.7 fc. Stormwater Utility Easements 25. The existing storm drainage easements will be vacated concurrently with the dedication of the relocated line. Grading Plan 11. See Sheet 6. 30. See Sheet 8. Storm Sewer Alignment 10. Storm drainage under trellis will be private line and not a public easement. Utility Plans 28. As discussed in the utility coordination meeting, site constraints require some issues to go unresolved, i.e. moving the manhole requires a stormwater drain to run dangerously close to the building foundation. 10/16/2003MDLCDL Ndw«k\DLC TEX-PLET-MPS\PDP - SPRL7R SHOPKO.doc Transportation Planning Transportation 35. Refer to Issue #47. 36. Refer to Issue #46. Water Wastewater Utility Plan 32. Acknowledged. 36. Utility easements will be completed for all water service lines up to and including the curb stops. Zoning Zoning 2. Topographic contour lines have been removed from the Landscape Plan. 3. A van accessible parking space has been added. 4. Building envelope, dimensions, distance to property lines are labeled. 5. The Phase lines are clarified. 6. Landscaping has been added around trash enclosures to provide screening. 7. Requested copies have been submitted to Planning Department for distribution. 10/16/2003A\DLC\DL Nework\DLC TEX PLEE=RS\PDP - SPRLTR SHOPKO.doc Enaineerina/Susan Jo 1..Although we do not have an easement exhibit, the easements are clearly outlined on Sheet 4 — Utility Plan. -/ < 'i , , I { 2. The project name is Tract B, Shopko P.U.D. 3. See Comment 1 above. 4. A utility coordination meeting was held. 5. Acknowledged. Stormwater / Basil Hamden 1. See Sheet 4 — Utility Plans. 2. The trellis will be over a private agreement, not an easement- 3. Acknowledged. Should you have any questions regarding this matter, please call me. Thank you for your cooperation. Sincerely, DO ERSTEIN LEMBURG COMMERCIAL, INC. W ' & Daniel fF Bemth, CCIM President 10/16/2003A\DLC\DL Network\DLC TEXr\LETTERS\PDP - SPRLTR SHOPKO.doc Number: ZJY Created: 8/26/2003 Sheet 4 - Update the street cut note to read: Limits of street cut are approximate. Final limits are to be determined in the field by the City Engineering Inspector. All repairs to be in accordance with City street repair standards. You may also place this statement under "NOTES" so that you don't have to put it by each and every street cut. C Number: 21 Created: 8/26/2003 Show and'Iabel all existing and proposed utility easements, both on and off -site. Please dedicate additional utility and drainage easements by separate document. It may be helpful to prepare an easement exhibit showing what's existing and what's proposed so that we can keep it all straight. You will want to vacate the portion of the existing utility easement that is no longer needed, however, that can not be done until the new easement is dedicated and the new line installed. Number: 22 Created: 8/26/2003 May need a temporary construction easement from the property owner to the north. If so, a letter of intent from that property owner is required before going to hearing. Number: 23 Created: 8/26/2003 Sheet 5 - Correct overlapping labeling. ,, tCF4 Number:24 Created: 8/26/2003 Sheet 6 - Phasing? Number: 26 a� n `"n 56_" Created: 8/26/2003 Sheet 9 and 10 -Provide details 707, 1601, 1603, and 1606. Please label all nonstandard on -site curb and gutter details as "on -Site". Number: 29 Created: 8/26/2003 Suggest a utility Coordination Meeting prior to the next submittal to work out the storm sewer alignment in relation to the sidewalk and other utilities. Suggest rotating the manhole away from the sidewalk. Number: 37 Created: 9/2/2003 No structure of any kind allowed in utility easements. Page 2 .;�e..� . 2 roject Comments Sheet cit,otFort Collins Selected Departments Department: Water Wastewater Date: October 27, 2003 Project: SHOPKO P.U.D. PAD B, TYPE I (LUC) All comments must be received by Steve Olt in Current Planning, no later than the staff review meeting: October 29, 2003 Note - Please identify your redlines for future reference Issue Contact: Jeff Hill Topic: General Number: 54 Created: 10/27/2003 [10/27/03] Coordinate site and landscape plans with the civil plans to reflect the same information. See site, landscape and utility plans for other comments. Topic: Utility Plan Number: 32 Created: 8/27/2003 [10/27/03] Maintain 4 feet minimum separation between meter pit and all permaner;t structures (i.e. building envelope, trash enclosure, retaining walls, etc.). Place meter pits and curb stops adjacent to the main when possible. Number: 33 Created: 8/27/2003 [10/27/03] [10/20/031 The power source to this site will be from the S.W. corner of the site. The developer will need to coordinate transformer location(s) with Light & Power Engineering. Transformer(s) will need to be a minimum of 3 ft. from any structure and have a minimum of 8 ft. of clearance to the front side of the transformer. The transformer(s) also must be within 10 ft. of a paved surface for line truck access. Number: 34 Created: 8/27/2003 [10/27/03] Provide utility easements for all water service lines up to and including the curb stops. See site, landscape and utility plans for other comments. Signature Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report Other_ Utility Redline Utility X Landscape Page 1 Project Comments Sheet " Selected Departments City of Furl t oljill, .awo Department: Engineering Date: October 28, 2003 Project: SHOPKO P.U.D. PAD B, TYPE I (LUC) All comments must be received by Steve Olt in Current Planning, no later than the staff review meeting: August 27, 2003 Note - Please identify your redlines for future reference Issue Contact: Susan Joy Topic: General Number: 27 Created: 8/26/2003 The Project Title on all plan sets do not match the Project Title on DMS. Topic: Landscape Plan Number: 15 Created: 8/26/2003 Remove the contours. Number: 16 Created: 8/26/2003 Show and label all existing and proposed easements. Topic: Site Plan Number: 13 Created: 8/26/2003 Please remove the utilities, contours and landscaping. Number: 14 Created: 8/26/2003 Show and label all existing and proposed easements. Number: 19 Created: 8/26/2003 Ped Access Ramps do not match the utility or landscape plans. See redlines. Topic: UtiliyPlan Number: ,I Created: 8/26/2003 Sheet 2 - 2 benchmarks are required in Line 40 of the General Notes. Number: 18 Created: 8/26/2003 Sheet 3 - Under notes: 1. Utility phasing? If grading is to be phased, will need a grading plan and erosion control plan for each phase. Signature Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report Other_ Utility Redline Utility Landscape Page 1 Project Comments Sheet Selected Departments Department: Engineering Date: October 30, 2003 Project: SHOPKO P.U.D. PAD B, TYPE I (LUC) All comments must be received by Steve Olt in Current Planning, no later than the staff review meeting: October 29, 2003 Note - Please identify your redlines for future reference Issue Contact: Susan Joy Topic: General Number: 27 Created: 8/26/2003 [10/28/031 All plan sets must be titled as: Shopko P.U.D., Tract B (08126/03) The Project Title on all plan sets do not match the Project Title on DMS. Topic: Utility Plan Number: 21 Created: 8/26/2003 [10!28/03] Sheet 4 is missing portions of the existing stormsewer easement. Please submit all easement dedications and vacations by separate document along with the appropriate exhibits. It may be helpful to submit an overall exhibit sheet (8.5x11) showing all the existing and proposed easements. (08/26/03) Show and label all existing and proposed utility easements, both on and off -site. Please dedicate additional utility and drainage easements by separate document. It may be helpful to prepare an easement exhibit showing what's existing and what's proposed so that we can keep it all straight. You will want to vacate the portion of the existing utility easement that is no longer needed, however, that can not be done until the new easement is dedicated and the new line installed. Number: 23 Created: 8/26/2003 [10128/03] See redlines. (08/26/03) Sheet 5 - Correct overlapping labeling. Number: 24 Created: 8/26/2003 [10/28/03] This sheet will need to show phasing. (08/26/03) Sheet 6 - Phasing? Number: 26 Created: 8/26/2003 [10/28/031 Sheet 9 was not included with this submittal. Comment remains open. Date CHECK HERE LIH YOU WISH TO RECEIVE COPIES OF REVISIONS Plat I Site Drainage Report Other Utility _� Redline Utility i Landscape DF--b Page I S- Ych"V yAeAmotac (08/26/03) Sheet 9 and 10 - Provide details 707, 1601. 1603, and 1606. Please label all non standard on -site curb and gutter details as "on -Site". Number: 37 Created: 9/2/2003 (10/28/031 No structure of any kind (foundations/footings, etc) are allowed in the utility easements - it appears that the building to the west may be too close to the prcposed utility easement. The building will need to be moved to the north slightly so that no part of the building/footings lie with the proposed utility easement. No private structures such as stormsewer lines, private easements or detention ponds are allowed in the utility easements. Per a discussion between Stormwater/Engineering/Northstar after Staff Review 10/29/03, it was agreed that because of site -.onstraints that the stormsewer will become a public line once it crosses the proposed utility easement. However, the line must be maintained by the developer, not the City. The 10" line for the roof drainage will be rerouted so that it does not fall within the public utility easement. The detention pond, however, will not be allowed in the utility easement and needs to be slightly regraded. (09/02/03) No structure of any kind allowed in utility easements. Number: 62 Created: 10/28/2003 [10128/031 Sheet 4 - Show the existing gas line. Page 2 PROJECT COMMENT SHEET City of Fort Collins Current Planninia REM '83flU6 DATE: July 30, 2003 TO: Technical Services PROJECT: #28-03 SHOPKO P.U.D. PAD B — TYPE I (LUC) All comments must be received by Steve Olt no later than the staff review meeting: August 27, 2003 Note - PLEASE identify your redlines for future reference Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat _Site _Drainage Report Other `` _utility _Redline Utility _Landscape Ctyof Fort Collins C'L Project Comments Sheet Selected Departments City of Fort Collins .�� a Department: Stormwater Utility Date: November 3, 2003 Project: SHOPKO P.U.D. PAD B, TYPE I (LUC) All comments must be received by Steve Olt in Current Planning, no later than the staff review meeting: October 29, 2003 Note - Please identify your redlines for future reference Issue Contact: Basil Harridan Topic: Easements Number: 25 [10/28/031 Created: 8/26/2003 Need to vacate the existing storm drainage easements where the storm line is being removed and dedicate a new easement for the relocated line. Provide an easement vacation and dedication exhibit. Topic: Grading plans Number: 30 Created: 8/26/2003 [10/28/031 Pond area must be contained outside of the public easments. Topic: Utility Plans Number: 28 Created: 8/26/2003 110/28/031 Please move manhole so that it is outside of the easement. the storm sewer manhole along Boardwalk Drive is located in an area that is typically used by Light and Power for their line (behind the walk). Please check with Light and Power to make sure that this location is OK for them. If the manhole is kept at that location, then the lid needs to be offset to keep it away from the walk. The line along JFK could also conflict with gas lines. A utility coordination meeting might be helpfid to clarify these issues. Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat _ Site Drainage Report Otber_ Utility _ Redline Utility Landscape Page I To: Dan Bernth Date: Friday, December 05, 2003 702 West Drake Road Building E, Suite B-102 Fort Collins, CO 80526 Project: Tract B, Shopko P.U.D. Re: City Comments Project No.: 03168.1 Response From: Oussama Abbas Sent Via: Deliver Fax No.: No. of Pages: CC: Attachments: Current Planning Buildings 59- Wall mounted lights are shown on the elevations representing the photometric plan 60- The retaining walls are joined with the building elevation. Liohfim� plan 61- Refer to response # 59 Site plan 55- Bike rack between building 1&2 is labeled. Engineering General 27- Title is corrected. Utility plan 37- No structure of any kind (foundation / footing. etc) will be in the utility easement. The columns on the south side of building 2 will have a straight foundation (not projecting in the utility easement). Light and Power I-ieht and Power 1- 2 transformers have been located on both ends of the buildings. Transformer location takes into consideration the clearance criteria. Landscape is used to screen the transformers. \\Carr\CB Documents\PROJECTS ActivmStrops ® Stlopoo\city comments Architecture response 2.doe Planning 151 West Mounto!n Avenue Fort Collins. Colorado 80524 970-482-8125 FAX 970-482-8450 Police General 63- For internal security reasons, we prefer not to have a window in the rear service door. Nevertheless, there are windows that exist in the back elevation and the policeman can view into the building*. Water Wastewater General 54- Site plan, Landscape plan, and civil plans are coordinated to reflect the same information. Architecture Page 2 of 2 Planning 151 We_;t Mountain Avenue For Collins. Colorado 805221 970-482-8125 FAX 970-482-8450 Project Comments Sheet Selected Departments City of Fort Collins Department: Engineering Date: January 7, 2004 Project: SHOPKO P.U.D. PAD B, PDP AND FINAL PLAN All comments must be received by Steve Olt in Current Planning, no later than the staff review meeting: January 14, 2003 Note - Please identify your redlines for future reference Issue Contact: Susan Joy Topic: General Number: 65 Created: 1 /6/2004 [1/61041 Site/Landscape/Utility -Relabel the private use easement to show that the easement is private north of the utility easement and public south of the utility easement. See the redlines on the Site Plan - I color coded the easement so that it is more clear. Topic: Utility Plan Number: 21 Created: 8/26/2003 [116/041 1 think its safe to submit all the legal does for the proposed easements now that we've reached an agreement on what is required. Please provide an overall exhibit along with the individual exhibits so that we can make sure we've got everything covered. Just a reminder, the private easement is private north of the utility easement and becomes a public easement on the south side of it. See the redlines. Please see the Site Plan redlines - I highlighted what should be public and what should be private. [10/28/031 Sheet 4 is missing portions of the existing stormsewer easement. Please submit all easement dedications and vacations by separate document along with the appropriate exhibits. It may be helpful to submit an overall exhibit sheet (8.5x11) showing all the existing and proposed easements. (08/26/03) Show and label all existing and proposed utility easements, both on and off -site. Please dedicate additional utility and drainage easements by separate document. It may be helpful to prepare an easement exhibit showing what's existing and what's proposed so that we can keep it all straight. You will want to vacate the portion of the existing utility easement that is no longer needed, however, that can not be done until the new easement is dedicated and the new line installed. Number: 24 [1/6/041 Repeat. [10/28/031 This sheet will need to show phasing. (08/26/03) Sheet 6 -Phasing? Created: 8/26/2003 Signature Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report Other_ Utility __ Redline Utility Landscape Page t Number: 26 Created: 8/26/2003 [1/6/04] Looks great....still need detail 707 and you're done. [10/281031 Sheet 9 was not included with this submittal. Comment remains open. (08/26/03) Sheet 9 and 10 - Provide details 707, 1601, 1603, and 1606. Please label all non standard on -site curb and gutter details as "on -Site". Page 2 C i fv Project Comments Sheet Selected Departments Department: Water Wastewater Date: January 13, 2004 Project: SHOPKO P.U.D. PAD B, PDP AND FINAL PLAN All comments must be received by Steve Olt in Current Planning, no later than the staff review meeting: January 14, 2003 Note - Please identify your redlines for future reference Issue Contact: Jeff Hill Topic: Utility Plan Number: 34 Created: 8/27/2003 [ 1 /13/041 The existing water service which occurs in our mapping system can not be located in the field. Therefore a new service will need to be extended into the building on the southwest portion of this project. Provide utility easements for all water service lines up to and including the curd stops. See site, landscape and utility plans for other comments. Signature r Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report Other Utility _ Redline Utility Landscape Page I City of Fort Collins Project Comments Sheet Selected Departments Department: Stormwater Utility Date: January 15, 2004 Project: SHOPKO P.U.D. PAD B, PDP AND FINAL PLAN All comments must be received by Steve Olt in Current Planning, no later than the staff review meeting: January 14, 2003 Note - Please identify your redlines for future reference Issue Contact: Basil Hamdan Topic: Easements Number: 67 Created: 1 /15/2004 [1115/04] Please provide a copy of the private line easement dedication for the line that goes between the two buildings. The area covered by the detention pond should be encompassed within a public easement, any old drainage easement that is no longer needed f rom the original plat should be vacated. These can be done by separate document. Topic: Erosion Control Number: 66 Created: 1 /15/2004 [1/15/041 Please provide erosion control efficiency calculations and ersosion control security calcs in the report. Topic: Phasing Plan Number: 68 Created: 1 /15/2004 [1/15/04] Please show the phasing of the buildings on the grading plan or provide a separate phasing plan. Signature i CHECK ]HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report Other Utility _ Redline Utility Landscape Page 1 PROJECT COMMENT SHEET City of Fort Collins DATE: I Feb 1993 DEPARTMENT: ITEM: 1-93A SHOPKO PUD -FINAL Please respond to this project by Friday, February 12,1993 Planner: Steve Olt No Problems Problems or Concerns (see below) P,47— VecrD S ANor1+e= 2 6O,u7-2rylOnly rnzi7IVT 1- "J tn�/k1 Tk-13 (,(fE.1r L/tiJ� d F TFta ��• � �`i /�C'TF2,,,INPr> -IF THeae IS Oc) 1L IDICATIowl 5TA-re 141:,,i1-- FOLLOCa7IN? THLa- �}�Ro�Ef2T� �ESC121�701.i. V/ HA(I-) A"b CC \ J MCA -,I O.,J TH-� PLAT I�Hy iQRE TN6ri& -r-(2A,1S ANo OJZT CNo2o 3tA21Net A.+o �.irgnicc> o^/ CUt%l s . �tJT� 2 /3oUNaAr1� YYIOhIt)WIENTS rU��� ! Date: Signature: CHECK IF REVISIONS REQUIRED: ❑ PLAT ❑ SITE ❑ LANDSCAPE ❑ UTILITY DEVELOPMENT SERVICES 281 NORTH COLLEGE P.O.ROX 580 FORT COLLINS, COLORADO 80522-0580 (303)221-6750 PLANNING DEPARTMENT' PROJECT COMMENT SHEET Citv of Fort Collins DATE: 1 Feb 1993 DEPARTMENT: ; ITEM: 1-93A SHOPKO PUD -FINAL Please respond to this project by Friday, February 12, 1993 Planner: Steve Olt No Problems X Problems or Concerns (see below) Aj, Ave, r�wi����� z4e�e -� Cv�kcti�Ct / Cc>riCtrY1 i� hVw 4e exnq I ft l e"Y-1 Ca � NICE Gil �i(12 ��4 `Ji 2 Date: 2A Signature: A/Ult � CHECK IF REVISIONS REQUIRED: ❑ PLAT ❑ SITE ❑ LANDSCAPE ❑ UTILITY DEN ELOPMEVT SERVICES 281 NORTH COLLEGE P.O.BOS 580 FORT COLLINS, COLORADO 80522-0580 (703)221-6750 PL%NNING DEPAR'rME.Nr Citv of Fort Collins Planning Department PROJECT COMMENT SHEET DATE: 21 February 1995 DEPARTMENT: FNG PROJECT: 1-93B _. RUQY TUESDAY @ SHOPKO PUD -Final PLANNER: Steve Olt All comments must be received by: Friday,_3 March 1995 ❑ No Problems Problems or Concerns (see below) Missing soils report. Site Plan • Add North arrow and scale to the vicinity map. • Indicate existing parking to be removed or new parking to be constructed Need a Plat • Additional FZOW (to the back of curb) and easements are needed on Boardwalk. Utility Plans Overall Utility and Demolition Plan • Easements are needed for all of site work. (continued on back) Date: �����y`' Signature: CHECK IF YOU WISH TO RECEIVE COPIES OF REVISIONS: ❑ PLAT ❑ SITE ❑ LANDSCAPE ❑ UTILITY ,1 COMMUNITY PLANNING and ENVIRONMENTAL SERVICES..281 NORTH COLLEGE, P.O. BOX 580 FORT COLLINS, COLORADO 80522-0580 (303)221 6750' . CURRENT PLANNING DEPARTMENT Project Comments Sheet Selected Departments City of Fort Collins Department: Stormwater Utility Date: August 27, 2003 Project: SFIOPKO P.U.D. PAD B, TYPE I (LUC) All comments must: be received by Steve Olt in Current Planning, no later than the staff review meeting: August 27, 2003 Note - Please identify your redlines for future reference Issue Contact: Basil Harridan Topic: Easements Number: 25 Created: 8/26/2003 Need to vacate the existing storm drainage easements where the storm line is being removed and dedicate a new easement for the relocated line. Provide an easement vacation and dedication exhibit. Topic: Erosion Control Number: 31 Created: 8/26/2003 August 18, 2003 Plan is OK. Thank YOU. Topic: Grading Plan Number: 11 Created: 8/21 /2003 Please provide an interim grading plan showing how the Phase 2 area will be graded prior to its construction and after Phase 1 is completed. Please provide tree protection notes on the plans specifying that trees in the area where the new storm sewer is proposed on the east side of the side will be protected in place during construction. Topic: Grading plans Number: 30 Created: 8/26/2003 Please provide cross sections along the east side of the building showing the slope from the building, the swale and the storm line along JFK. Another cross-section along the retaining wall and pond would also be helpful. Add tree protection notes to the grading plan. Show and call out protective construction fencing for trees to remain. Signature Y12-�3 Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report Other_ Utility Redline Utility Landscape Page t • Indicate limits of sidewalk replacement. • Provide ramps where indicated. • Add street patch for H2O line. Detail Sheet • Eliminate drive -over -curb, gutter and sidewalk. doesn't appear to be used anyplace. • Where is the detail for new driveway approach used. • Add detail D-20 additions to existing sidewalk. • Detail for walk should show a 7 foot walk. Topic: Storm Sewer Alignment Number: 10 Created: 8/21/2003 It seems that the storm sewer line coming from the parking area inlet will be crossing under a trellis cover. Please make sure that this line is a private line that would not require a public easement for it to be allowed. If this is a private line and the then the City will not own or maintain such a line and it would thus be allowed. Since this line is carrying flows from the main Shopko parking lot, a private easement may be needed between the owner of this parcel and the owner of the Shopko Parcel A. Please add notes on the plan to that effect. Topic: Utility Plans Number: 28 Created: 8/26/2003 the storm sewer manhole along Boardwalk Drive is located in an area that is typically used by Light and Power for their line (behind the walk). Please check with Light and Power to make sure that this location is OK for them. If the manhole is kept at that location, then the lid needs to be offset to keep it away from the walk. The line along JFK could also conflict with gas lines. A utility coordination meeting might be helpful to clarify these issues. Page 2 Project Comments Sheet I... --if Selected Departments Citvof Fort Collins NM�7 Department: Water Wastewater Date: August 27, 2003 Project: SHOPKO P.U.D. PAD B, TYPE I (LUC) All comments must: be received by Steve Olt in Current Planning, no later than the staff review meeting: August 27, 2003 Note - Please identify your redlines for future reference Issue Contact: Jeff Hill Topic: Utility Plan Number: 32 Created: 8/27/2003 Maintain 4 feet minimum separation between meter pit and all permanent structures (i.e. building envelope, trash enclosure, retaining walls, etc.). Place meter pits and curb stops adjacent to the main when possible. Number: 33 Created: 8/27/2003 Our records indicate an existing water service and fire line stub has been extended into the area of phase 2. Field locate all utilities, show and label on plans. Clearly define weather existing stubs/services are to be used or abandoned. Number: 34 Created: 8/27/2003 Provide utility easements for all water service lines up to and including the curd stops. See site, landscape and utility plans for other comments. IT -? 7-0 3 Date //EHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat _ A� Site Drainage Report Other_ Utility _ Redline Utility < Landscape Page 1 . Project Comments Sheet � Citv of Fort Collins Selected Departments Department: Engineering Date: September 2, 2003 Project: SHOPKO P.U.D. PAD B, TYPE I (LUC) All comments must be received by Steve Olt in Current Planning, no later than the staff review meeting: August 27, 2003 Note - Please identify your redlines for future reference Issue Contact: Susan Joy Topic: General Number: 27 Created: 8/26/2003 The Project Title on all plan sets do not match the Project Title on DMS. Topic: Landscape Plan Number: 15 Created: 8/26/2003 Remove the contours. Number: 16 Created: 8/26/2003 Show and label all existing and proposed easements. Topic: Site Plan Number: 13 Created: 8/26/2003 Please remove the utilities, contours and landscaping. Number: 14 Created: 8/26/2003 Show and label all existing and proposed easements. Number: 19 Created: 8/26/2003 Ped Access Ramps do not match the utility or landscape plans. See redlines. Topic: Utility Plan Number: 17 Created: 8/26/2003 Sheet 2 - 2 benchmarks are required in Line 40 of the General Notes. Number: 18 Created: 8/26/2003 Sheet 3 - Under notes: 2. Utility phasing? If grading is to be phased, will geed a grading plan and erosion control plan for each phase. CHECK HERE-YF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat _ I Site Drainage Report Other_ z Utility _ ,c Redline Utility I Landscape Page 1 Number: 20 Sheet 4 - Update the street cut note to read: Created: 8/26/2003 Limits of street cut are approximate. Final limits are to be determined in the field by the City Engineering Inspector. All repairs to be in accordance with City street repair standards. You may also place this statement under "NOTES" so that you don't have to put it by each and every street cut. Number: 21 Created: 8/26/2003 Show and label all existing and proposed utility easements, both on and off -site. Please dedicate additional utility and drainage easements by separate document. It may be helpful to prepare an easement exhibit showing what's existing and what's proposed so that we can keep it all straight. You will want to vacate the portion of the existing utility easement that is no longer needed, however, that can not be done until the new easement is dedicated and the new line installed. Number: 22 Created: 8/26/2003 May need a temporary construction easement from the property owner to the north. If so, a letter of intent from that property owner is required before going to hearing. Number: 23 Created: 8/26/2003 Sheet 5 - Correct overlapping labeling. Number: 24 Created: 8/26/2003 Sheet 6 - Phasing? Number: 26 Created: 8/26/2003 Sheet 9 and 10 - Provide details 707, 1601, 1603, and 1606. Please label all non standard on -site curb and gutter details as "on -Site". Number: 29 Created: 8/26/2003 Suggest a Utility Coordination Meeting prior to the next submittal to work out the storm sewer alignment in relation to the sidewalk and other utilities. Suggest rotating the manhole away from the sidewalk. Number: 37 No structure of any kind allowed in utility easements. Created: 9/2/2003 Page 2 REVISION COMMENT SHEET DATE: October 15, 2003 TO: Engineering PROJECT: #28-03 SHOPKO P.U.D., PAD B — TYPE I (LUC) All comments must be received by Steve Olt no later than the staff review meetinb: October 29, 2003 No Comment Problems or Concerns (see below or attached) **PLEASE IDENTIFY YOUR REDLINES FOR FUTURE REFERENCE** CI IECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat _Site _Draina.e Report _Other _Utility _Redline. Utility _Landscape ate 702 West Drake Road Building E, Suite B-102 Fort Collins, CO 80526 (970) 221-1965 Office (970) 221-1966 Fax October 16, 2003 Mr. Steve Olt Project Planner 281 North College Avenue P.O. Box 580 Fort Collins, CO 80522-0580 RE: Project No.: Tract B, Shopko P.U.D. Dear Steve: The following is an explanation of issues arising from the Staff Project Review Letter dated September 4, 2003. Current Planning Comments Buildings 42. A new light fixture is proposed ( refer to Sheet E2P ). General 49. The following addresses redline comments indicated on the plans: Trees identified as being moved, that are in question along JFK Parkway, have been reviewed by Tim Buchanan and accepted due to sidewalk encroachment and over crowding issues. A note indicating a storm sewer easement has been added to the plan. Additional landscaping has been provided around trash enclosures and transformer locations. Parking spaces previously indicated as part of Phase 2 have been changed to Phase 1. Proposed sidewalk locations have been modified to 10/ 16/2003A\DLC\DL Network\DLC TEXr\LE=RS\PDP - SPRLTR SHOPKOAd