COMMENT SHEET
City of Fort Collins
Current Planning
DATE: July 21, 1998 TO: Mapping& Drafting
PROJECT: #5-97A Wovenheart Assisted Living Facility;
Type I1 PDP
All comments must be received by Leanne Harter no later than the staff
review meeting:
Wednesday, August 5,1998
(111: i 'la.J",
Date:
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_ Plat _ ki _ Drainage Repod _ Oler
Utility — Redline Utility — Landscape
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planninmg
DATE: July 21, 1998 TO: Engineering
PROJECT: #5-97A Wovenheart Assisted Living Facility;
Type II PDP
All comments must be received by Leanne Harter no later than the staff
review meeting:
Wednesday, August 5,1998
COMMENTS:
Include the Plat in the utility plans.
Required easements:
a Offsite construction easement for the vehicular connection between this
property and the property to the west.
b Offsite public access easement for the connection between the two
properties.
c Onsite public access easement for the connection between the two
properties.
On the Plat, the property needs to tie to two section corners.
Please include the Plat with the utility plans.
Date:
CHECK HERE IF YOU 1MH TO RECEIVE COPIES OF REVISIONS
✓ Plat ✓ Silt _ Drainage Report _ Ok
. Utility Redline Utility ✓landscape
DATE: June 15, 1998 TO: Engineering
PROJECT: #5-97A Wovenhearts - Type II PDP
All comments must be received by Mike Ludwic no lat-r than the �+-ff
review meeting:
Wednesday, July 8,1998
GENERAL COMMENTS:
si We will need to see original documents for the easement dedications
before this project is scheduled for the Planning and Zoning Board
hearing. We will not accept any copies or faxes and the signatures must
be original signatures on all documents.
si See the Utility Plans and Site & Landscape Plans for additional comments
and concerns.
Date:
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site _ Drainage Report _ Other
Utility _ Redline Utility Landscape
City of Fort Collins
REVISION
COMMENT SHEET
DATE: May 1, 1998 TO: Engineering
PROJECT: #5-97A Wovenhearts - Type II (LUC) PDP/FC
Review
All comments must be received by Mike Ludwig no later than the staff
review meeting:
Wednesday, May 27,1998
GENERAL COMMENTS:
Sheet 2 of 5: Utility Plan
If the construction of the shared access is not shown in the approved
utility plans for Sterling House PUD, Lot 1, a minor amendment will need
to be submitted to the City for approval.
The travel lanes on the traffic circle will need to be one-way. Therefore,
please reduce the travel lane width to discourage motorists. See the
street standards for the appropriate dimensions.
Rather than providing easement dedication documents, it might be easier
to just replat the site.
There isn't an access ramp being shown at the corner of Rule Drive and
South Lemay Avenue. If there isn't one there, please provide.
Date: sf V /98 Sipature:
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
✓ Plat _✓ Si : _ Drainage Rep
✓ Utility ✓ Redline Utility i Landscape
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: March I I, 1998 TO: Engineering
PROJECT: #5-97A Sterling House PUD, Wovenhearts
Memory Care - Type II Project Development
Plan/Final Compliance
All comments must be received by Mike Ludwig no later than the staff
review meeting:
Wednesday, April 8,1998
GENERAL COMMENTS:
Sheet 1 of 5: Cover Sheet
X Please modify the General Notes as shown on the utility plans.
X Please include a copy of the most recent plat of the Lot/subdivision for our
reference. We need to see existing easements and rights -of -way.
X We would like for you to provide us with copies of any private easements
associated with this development and all original copies of easements
being dedicated to the City.
Please see sheet 2 for additional comments r+
Date:
CIIECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
✓ Plat f Sk _ Drainage Report _ Other
Utility ✓ Refine Utility ✓ landscape
City of Fort Collins
Comments continued from the sheet 1...
Sheet 2 of 5: Utility Plan
X Please enlarge the text on the plan view. It is very difficult to read.
X Please provide a cross-section of both Lemay Avenue and Rule Drive.
X Please show the ROW dimensions for Lemay Avenue and Rule Drive.
X Please reference all details used.
X Please modify the pedestrian connection between Lot 1 and Lot 2. 1 don't
think that the City wants to direct pedestrians into the front of parked cars.
Provide a better pedestrian -friendly connection to the building.
X Please provide curve information to the curb returns at the entrance to the
site.
X You may want to meet with the PFA to discuss the fire truck access into
the :site. Talking with Ron Gonzales, he wasn't too "thrilled" with the traffic
circle feature at the front of the development.
X The portions of the sidewalk that are not contained within the ROW will
need to be contained within a pedestrian access easement.
X The saw -cut lines need to be either in the middle of the travel lane or
along the edge of the travel lane.
Sheet 4 of 5: Drainage and Erosion Control Plan
X It seems as though the cross-section for Lemay (A_A) is missing. Please
provide and label.
X I'm concerned with the placing the storm sewer under the building. Can
this lead to problems down the road, i.e. leaks, etc.
Sheet 5 of 5: Details
X Please modify the driveway approach detail. It currently doesn't match
what is being proposed.
PROJECT
COMMENT SHEET
City of Fort Collins
Current Plannint
DATE: A?v j 1 �, 97 DEPT: Engineering
PROJECT: SL-�rU*\ lkeu,afl ?u
PLANNER: (t.�-Gl l cl i
ENGINEER: ����� 1 LtiC�iM` n Ili-
0
o Problems
Problems or Concerns (see below or attached)
;iE::luion,v IkN J 1 1, A;})mill '/, s91a ./
a;d. / ' l.: o➢ LIii1' ^r I., a 11 r:'_ V/ i.. roe �L1 dt: 0`7� r°�, r'j,F;ri wvi�i illoii;a �hiu Fsrt^ 'Hiles
p u� 111 .:a>ur�d}P e�.illo ,i
.':bf�)v llu' .Al Ir;' i t:;;.✓.Ili d.iuPlil.o 1111 A ay1111[ 1 i[ r )i leX;I L vv,I::
"., �'i it r, lr U ire it +I �L�-�-I YiiJLJ LcJU—� l2f'L'C✓ 71�I Z�e rJLL
L, IL Pi16 Flu il.�,. i✓v,pi iii .�_�LI ifr: .0 ,I.,"i �'4/ Div;!:.
^,�. `1 Ile ir: Vdfl ilk' vu u,v r� r ,.� ", , „✓il,i Ill, % io �d'd.d1, )uiu d' ,,..11. , l,x)ii., iyVUp V : ,ii1, c�.961ui
414 c:L 4�1 6-�-
Date: Signature. i
PLEASE SEND COPIES OF MARKED REVISIONS: ❑ PLAT
❑ SITE
❑ UTILITY
❑ LANDSCAPE
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: January 21, 1997 DEPT: Engineering
PROJECT: #5-97 The Sterling House PUD
Preliminary/Final
PLANNER: Mike Ludwig
All comments must be received by: Monday, February 10, 1997
Sterling house PUD - Preliminary/Final
February 6, 1997
Site Plan
1. Label sidewalk (4.5 feet) and parkway width (6 feet). The sidewalk needs to go around the
cul-de-sac bulb and therefor a ramp needs to be provided where the sidewalk intersects the
driveway on the west side.
Plat
Provide additional Row around the bulb of the cul-de-sac to the back of sidewalk.
Provide a 9 foot utility easement behind the Row along Rule Drive.
All other easements needed should be shown on the plat also.
This is considered a final submittal, but this plat is not in final form.
The title should be `Sterling House PUD' as it is not a subdivision.
(Continued on next page)
Date: �19-7 Signatu
CHECK IF YOU WISH TO RECEIVE PLAT
COPIES OF REVISIONS SITE
LANDSCAPE
UTILITY
Sterling house PUD - Preliminary/Final (page 2 of 2) February 6, 1997
Utility Plans
7 Add the following notes to the general notes and make corrections as shown on the plans:
When an existing asphalt street must be cut, the street must be restored to a condition
equal to or better than its original condition. The existing street condition shall be
documented by the City Construction Inspector before any cuts are made. Patching shall
be done in conformance with the City of Fort Collins Street Repair Standards. The
finished patch shall blend smoothly into the existing surface. All large patches shall be
paved with an asphalt lay -down machine. In streets where more than one cut is made, an
overlay of the entire width, including the patched area, may be required. The
determination of need for a complete overlay shall be made by the Director of
Engineering.
THE DEVELOPER IS RESPONSIBLE FOR ALL COSTS FOR THE INITIAL INSTILLATION OF
TRAFFIC SIGNING AND STRIPING FOR THIS DEVELOPMENT RELATED TO THE DEVELOPMENT
LOCAL STREET OPERATIONS. IN ADDITION THE DEVELOPER IS RESPONSIBLE FOR ALL
COSTS FOR TRAFFIC SIGNING AND STRIPING RELATED TO DIRECTING TRAFFIC ACCESS TO
AND FROM THE DEVELOPMENT (E.G. ALL SIGNING AND STRIPING FOR A RIGHT TURN LANE
INTO THE DE=VELOPMENT SITE).
Sheet 3
8. Indicate the width of the driveways and there location in relation to the property line.
9. Label the width of the sidewalk (4.5 feet) and the parkway width (6 feet).
10. Show the patch in the street where the utilities will be taped into.
11. The sidewalk needs to go around the cul-de-sac bulb and therefor a ramp needs to be
provided where the: sidewalk intersects the driveway on the west side.
Sheet 6 - Details
12. Provide driveway detail D-14 or D-15 whichever is applicable.
13 Provide detail D-20, Additions to existing sidewalk.
14. Provide detail D-11, Curb and Gutter Details.