Minor Amendment Application Form
f<
Project Name:
Project location (Street Address)_IIjl �LCTJA L. E:�1/-',—l�'tl Minor Amendment Fee: $192.00
Legal Description: _tA1'!_ 'r Q �: D___
General Information: List al/ property, owners having a legal. equilahle interest in the property f4flarh separate sheets if necessary)_
Owner's Name (s): _ ➢ C.� K _ ��i 9 L_t it Lam_
Street Address: Pity/State/"Lip: Bi�.Lo; I_ W t 535-11
Telephone: (F ii 3L,%-�jccio-kz2.0 _ Fax:-(O�-_.1� OPPcd>---
Applicant's/Consultant's Name: Do`�4 1Le_(_�,� Name of firm: VUC-:ItT F Si4'fR�S__ ._
Street Address: jqy �( 11r�.�c•:a__SS�_.TY�� City/State/Zip: T Cv�i LK i._CC) .��-u -- t Telephone -]L'_(-7_Z-'IL2.5_------Fax:4i?G%��L'l�L_`y+--- f:maiL•'ZYi\Lit.�.._6�V, _L� s-TL-DLCS.,
SUBMITTAL REQUIREMENTS:
1) Six (6) copies of RECORDED plan (i.e. site, landscape, elevation, etc. - whichever is being altered) on
24" x 36" size (usually available at the Technical Services Department at 281 N. College) — RED -LINE
TI IF C11AN6ES ON the six plans or provide six copies of revised drawings showing the changes in
addition to the six originals;
2) Completed and signed application form; and
3) Application fee of $192.00.
MINOR AMENDMENT
Detailed description of the change and reason(s) for the request:
C �VFr— _t_2�4 i�14__ i�rlLoi LsrY's i�C.LS i2E? 1AUZAw,n t c�ct 51>�L
D-j *LGIi�F
i_S _ih-_V�i12- PLAQ-"Lla_u�
Lev �1n��5--dLL_� �<<�t _, :�s;��--L_ F° s� . �� (,.) , i t-1 r• N6_�� tr5 --
CERTIF[CATION
I certify the information and exhibits suhmined are tore and correct to the best of my knowledge and that in filing this application, 1 am acting with
the km... edcr_ consent, and anthorit, of the owners of the prnperte (including all owners having a legal or equitable interest in the real property, as
defined in Section 1-2 of He ( it, C ode: which is the subject of this application) without whose consent and atiIhoritY the requested action should not
iawtulk ha accomphshed. Pursuant to said aulhurit,y, 1 herehy pemtit City Alldals to enter upon the nroperh hor the purpose of inspection, and if
necessary, (o posting a public nonce un the property.
Name (please PRINT):_
Address:_
14
telephone:
Approval Items for MA05088
Subdivision: BOSTON CHICKEN @ LEMAY/PENNO
Site Address: 918 S LEMAY AVE
Department/Description Action Taken Entered By
Comments (if any)
CURRENT PLANNING
07/21/2005 CMNT Anne Aspen
The left and right back elevations show long expanses of
blank walls. These walls must be articulated with
windows, doors, changes in plane, pilasters, changes in
material or some combination thereof.
07/21/2005 CMNT Anne Aspen
Call out materials and colors on elevations. Include colors
of signs.
07/21/2005 CMNT Anne Aspen
Select glazing which will not create glare. Section 3.5.1
(E)(2) and (3).
07/21/2005 CMNT Anne .Aspen
See Section 3.5.3(D) regarding base and top standards.
Provide a base and top on all elevations.
07/21/2005 CMNT Anne Aspen
The four trees slated for removal may require mitigation
on or offsite. Contact Tim Buchanan, City Forester for an
assessment. Refer to Section 3.2.1(I)(7) and 3.2.1(P).
07/21/2005 CMNT Anne Aspen
Both elevations of the front addition and the south
elevation of the rear addition require a minimum of 5-foot
wide foundation planting beds along at least 50 % of the
elevation. Please provide. It may work on the rear
addition to combine this foundation bed with a change in
plane for partial fulfillment of the articulation needed on
the blank wall.
07/21/2005 CMNT Anne Aspen
There needs to be a connecting walkway between the
street sidewalk and the front door. See Section
3.5.3(B)(1) and the definition of connecting walkway in
Division 5. Given that this is an existing condition and we
need to maintain the drive aisle, we will allow an
enhanced crosswalk. It will need to be raised, integrally
colored and scored. See Section 3.2.2 (F_)(5).
10/10/2005 OK Anne Aspen
ENGINEERING -DEVELOPMENT REVIEW
07/21/2005 1 Sheri Wamhoff
Need to show easement lines on the plans.
May be a problem to locate the Dumpsters within the
drainage easement.
An 80 foot wide drainage easement exists from the
Eastern Property line. The building is shown to be
located 79 feet from the eastern property line. The
building can not extend into the easement.
Need to revise the utility plans to show the proposed
changes.
The minor amendment can not be approved until the
revised utility plans are approved.
Where is the grease trap going to be relocated? It is
currently within the addition area.
The parking aisle on the south side that you are changing,
with 17 foot parking stalls the one sided drive isle needs to
be 22 feet in width (Article 3, pg 36). On the approved
plans this drive isle is shown as a 24 foot isle.
Page 1 of 3 01/04/2006 1:47:01 PM
Department/Description Action Taken Entered By Comments (if any)
10/10/2005 HLD Sheri Wamhoff The minor amendment can not be approved until the
revised utility plans are approved and the easement is
vacated.
The City General notes need to be added to the plan set
(All but a couple are applicable).
Show existing infrastructure as dashed lines. Unable to
tell what is existing and what is proposed on the utility
plans. Need to show the existing infrastructure around
and on the site. Missing information on the West side of
the building, North side of the building and on the East
side of the building.
Need to note that 5 feet of the 80 drainage easement is to
be vacated by separate document. The way that it is
currently labeled on the site and utility plans it appears
that the entire easement is to be vacated.
Where is the water meter pit for this site?
What is the distance that the curb transitions north on the
south side of the building?
We discussed that the dumpster would be okay located
within the drainage easement because the walls would be
less than 6 feet tall and would not require a building
permit. The site plan shows a shed within the dumpsler
area. What is the height of this shed? If it requires a
building permit - it can not be located within the easement
area. Per Gary if the shed is 120 sq feet and/or over 8
feet tall it will require a permit. The shed is definitely
smaller than 120 sq feet so provided it is not over 8 feet
tall it will be okay.
Water/ Wastewater needs to be routed and review the
utility plans if they were not routed on this last review.
11/03/2005 OK Sheri Wamhoff utiltiy plan mylars signed. Easement vacation AD05-48
STORMWATER ENGINEERING
07/21/2005 CMNT Basil Hamdan Please provide revised grading plans showing the new
addition.
Please document with a letter whether the addition will
cause any increase in the site's impervious area. A
calculation of the added impervious area.. if any, will also
be needed in order to calculate any stormwater fees.
Provide erosion control measures during construction.
10/10/2005 CMNT Basil Hamdan Please use only updated (September 2003) City Of Fort
Collins Erosion Control Notes.
Please call out the ponding elevation and the limits of
ponding in the parking for the 100 year storm.
Please provide a signed and stamped copy of the
drainage letter.
Please show on the plans the extent of ponding during the
100 year storm. Call out 100 year ponding elevation.
Please route mylars for signature once these items are
addressed and the easement vacation in progress has
been processed.
11/01/2005 OK Basil Hamdan MA approved
Page 2 of 3 01/04/2006 1:47:02 PM
Department/Description
Action Taken
Entered By
Comments (if any)
ZONING
07/11/2005
CMNT
Gary Lopez
routed 7111/05
07/22/2005
OK
Gary Lopez
09/27/2005
CMNT
Gary Lopez
resub. routed 9/26/05
Page 3 of 3 01/04/2006 1:47:02 PM
Sheri Warn. -)ff - RE Culvers of Fort Collins
Page 1
From: Basil Harridan
To: Josh Ziliak
Date: 10/4/2005 4:47:18 PM
Subject: RE: Culvers of Fort Collins
Josh,
I looked at your calculations for the ponding elevations on the Culvers of Fort Collins site.
It seems that the 75 foot easement would be able to contain the 100 year water eleavtion so, I would be
OK with vacating the 5 foot easement needed.
Thanks,
Basil
>>> "Ziliak, Josh" <jziliak@stantec.com> 10/04/05 12:31 PM >>>
Hi Basil,
I dropped off two copies of a drainage letter addressing your concerns about the new detention volumes at
the front desk of your office- The detention pond is adequately sized for the future conditions and the
updated rainfall intensities The 100-YR water surface will be contained in the proposed 75' drainage
easement Please contact me if you have any problems or concerns. If everything looks ok, we would
like your approval to resubmit the revised easement vacation to Sheri.
Thank you,
Josh
-----Original Message -----
From. Basil Harridan [mailto:BHamdan@fcgov.com]
Sent Friday, September 30, 2005 1:16 PM
To: Ziliak, Josh
Cc. Sheri Wamhoff
Subject Re Culvers of Fort Collins
Josh,
It looks like the vacated 5 foot will work, provided that you have used
the updated City of Fort Collins rainfall standards to size the volume
of detention needed as the old detention volume was sized usig the old
rainfall standards
Thanks,
Basil
>>> "Ziliak, Josh" <jziliak@stantec.com> 09/30/05 08:55AM >>>
Basil,
I am working on the Vacation of Easement Request for Culvers
Restaurant. We are revising our request to only vacate a 5' portion of
the existing easemen+:. I have attached PDFs of the portion of the
easement to be vacated and the 100 Yr water limit 1 have also attached
the drainage letter for this site. Could you please review the
documents and let me know if this is acceptable. We plan on
resubmitting to Sheri Wamhoff if you have no issues with the easement
vacation
Sheri Wamhoff - RE Culvers of Fort Collins Page 2
Thanks,
Josh
<<plat of boston chicken pdf>> <<drainage easement.pdf>> <<Drainage
Letter8 18 2005.doc>>
Josh Ziliak, EIT
Design Engineer
Stantec
Ph: (970) 482-5922
Fx, (970) 482-6368
jziliak@stantec.com
www, stantec. com
CC: Sheri Wamhoff