Ms. Sheri Wamhoff
City of Fort Collins
Engineering Department
281 North College: Avenue
P.O. Box 580
Fort Collins, CO 80522-0580
Re: Willow Springs P. U.D. - Groundwater Underdrain System
Project No. 10-695-050
Dear Sheri:
January 10, 1996
Enclosed is one (1) mylar and four (4) stamped and signed blueline copies of Sheet 22C for your
files. Sheet 22C is the westerly extension of the groundwater underdrain system for the Willow
Springs P.U.D. project.
The extension of the groundwater underdrain parallels the Mail Creek Ditch and extends in a
westerly direction. The underdrain piping is in a separate trench from other utilities and is
located within open space. There is a possible future street crossing at the south end of Weeping
Way. A 15" sleeve has been added within the possible future Right -of -Way. The Groundwater
Subdrain Analysis by Lidstone & Anderson, Inc. has addressed the extension of the underdrain.
The construction and installation of the underdrain system will follow the City of Fort Collins
Specifications. The underdrain system is a private system and will be owned and maintained by
the Homeowner's Association.
Again, we are providing these plans for your information, files, and inspector. Should you have
any questions or concerns, please contact me at 226-0557.
Respectfully,
TST, INC. CONSULTING ENGINEERS
Sharlene A. Shadowen, P.E.
SAS/Ig
Enclosures
TSTINC. 748 A h:Jcn Wac-Huil0lnpp 10'_Ivvcrnr.. Trmwc Fnl
7 Pn 1 ( II n. (Y) NO„S 1 10j
Cn II �U I I I I Ig I11(4111,,I Ii0 60,,7 1. wwA_(C0 NOII
MOIm1)"', rI3W, P9J 1)10i 14131792 Os,,
I a, IDOi, 226-0201 P:o 1101, 70' Qa Hl)
u
Ms. Sheri Wamhoff
City of Fort Collins
Engineering Department
281 North College Avenue
P.O. Box 580
Fort Collins, CO 80522-0580
September 27, 1995
Re: Willow Springs P. U.D. - Phase One Groundwater Underdrain/Irrigation Pump Station
Project No. 10-695-050
Dear Sheri:
Enclosed are four (4) stamped and signed sheets of the realigned Groundwater Underdrain and Irrigation
Pump Station for your files. The groundwater underdrain and pump station are a part of the Willow
Springs P.U.D. - Phase One project.
The groundwater underdrain is an existing Underdrain which parallels the Harmony Trunk Sewer and
crosses the Willow Springs project between the railroad and Timberline Road. The groundwater
underdrain eventually daylights into McClelland Channel east of Timberline Road. The realignment of
the underdrain will he used as irrigation water for the Willow Springs development and to create a
continuous trickle Clow within the McClelland Channel. The Developer (Mr. Byron Collins) and the
Owner of the existing underdrain (Everitt Companies) have met and agree that the existing groundwater
underdrain will he realigned. Everitt Companies has reviewed and approved the attached construction
plans. The new underdrain, irrigation pipelines & pump station will be privately owned and maintained
by the Homeowners Association.
Again, we are providing these plans for your information and tiles. Should you have any questions or
concerns, please contact me at 226-0557.
Respectfully,
TST, INC. CONSULTING ENGINEERS
^harne A. ua��n11�
SAS/Ig
Enclosures
TSTINC. WhulenWuy-B,Al �D [02hn,.,n„,-T<,�a,,F,,,
7 Puri CaIIIn.,C0 W121 sulw105
Cumllllln� I'.n �inri Tm t1[h�2'_641557 Englcwixul. CO F0]12
�9crta Ucnvcr 13031595-91W 0W,792-0557
Fu, 1301,226 0104 Fa, 603 t 792--9489
u
Ms. Sheri Wamhoff
City of Fort Collins
Engineering Department
281 North College Avenue
P.O. Box 580
Fort Collins, CO 80522-0580
August 21, 1995
Re: Willow Springs P. U.D. - Phase One - Blehm Lateral Irrigation Pipeline
Project No. 10-695-054
Dear Sheri:
Enclosed are three (3) stamped and signed sets of the Blehm Lateral Irrigation Pipeline for your
files. The Blehm Lateral is part of the Willow Springs P.U.D. - Phase One project.
The Blehm Lateral is an existing irrigation ditch which parallels Mail Creek Ditch and
Timberline Road and serves irrigation water to the residents east of Timberline Road. The
Developer (Mr. Byron Collins) and the Ditch Company (Blehm Water Association) have agreed
that the existing irrigation ditch will be realigned and placed within a new pipeline. The new
pipeline is a source of irrigation water for both the residents east of Timberline Road and the
Willow Springs Homeowners Association. The Ditch Company has reviewed and approved the
attached construction plans. The new irrigation pipeline will be privately owned by the
Homeowners Association with an easement provided to the Ditch Company. Usage and
maintenance of the irrigation pipeline will be shared between the Homeowners Association and
the Ditch Company.
Again, we are providing these plans for your information and files. Should you have any
questions or concerns, please contact me at 226-0557.
Respectfully,
TST, INC. CONSULTING ENGINEERS
�'/i��S��8�(�
� S'harlene A. SI owen, P.E.
SAS/Ig
Enclosures
TST INC. �Un�1z�,W�,, NwlA�ngD 102�necrnc..T��,���r�,�
F<�,T C„11"�,.Co80121 ,�,«105
G nuiJ(ing I II,glnccrs �in3)22orO5,7 1',[, — )d,COW112
hcira 0.nvcr [1f111595-9103 OW) 7920557
1j t703,'_26 )204 Fvx(303)792-41N4
P IV
�Ad.!*."
Mr. Michael Herzig, Civil Engineer
City of Fort Collins
281 North College Avenue
Fort Collins, Colorado 80524
Re: EASEMENTS FOR WILLOW SPRINGS P.U.D.
Dear Mr. Herzig:
January 23, 1995
Battle Creek Road is part of the WILLOW SPRINGS P.U.D. and also part of
their Phase I, all of which comes before the Planning and Zoning Board
for final approval January 23, 1995.
The construction of Battle Creek Road will significantly alter the historic
storm drainage flows on the Dusbabek property north of Battle Creek. Our
attorney advises the developers will therefore require a DRAINAGE EASEMENT
from the Dusbabeks in order to construct a small storm drainage swale along
the north side of Battlecreek, on Dusbabek property, for the transport of
storm water into the TIMBERLINE Swale.
The developers for Willow Springs have also designed berms along the north
side of Battle Creek which ei;tend onto Dusbabek property. They will thus
require SLOPE EASEMENTS and will need to provide erosion control.
W, are cuuLiuuiag to negoLiaLe both Drainage and SioleEasements with Lite
Willow Springs developers, but at this date have not been successful.
We have no desire to hold up their project, but do ask the City of Ft. Collins
grant Willow Springs final approval contingent upon their obtaining appropriate
easements, agreeing to build the small swale above mentioned and providing
erosion control along Battle Creek Road.
1 VV truly yours
Al
Gerald J. DVbbabek
Gerald & Se0y Dusbabek • 1613 Trailwood Dr. • Ft. Collins, CO • 80525 • (303) 493-0837