HomeMy WebLinkAboutVISITOR CENTER AT THE ENVIRONMENTAL LEARNING CENTER - Filed CS-COMMENT SHEETS - 2005-08-16PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: October 13, 1998 TO: Engineering
PROJECT: #55-98 CSU Environmental Learning Center -
Special Site Plan Review
- ONE-110-UND.QF RE-NMEM S -
All comments must be received by Bob Blanchard n4 11 zittrlh the staff
review meeting:
Wednesday, November 4, 1998
CSU Environmental Learning Center November 5, 1998
• The plans need to be 24 x 36 in size.
• Provide a cover sheet with the City General notes and index of sheets.
• Provide City Signature block.
• Need to provvide and show the design and improvements for the Frontage Road. As per the
1'IS this should be a connector street with a 36 width (2 - 12 foot travel lanes and 2 - 6 foot
hike lanes) -widening out to 48 feet at the intersection to accomidate the left turn bay. This
needs to he built in accordance with our standards with curb gutter and sidewalk_
• 1 he state does issue the state highway access permit. This permit is issued from Plans
approved by the Citr and can not be issued until said plans are approved for the required
improvements.
• Provide and show the design and improvements for Prospect Road along the frontage of the
property_ phis is construction of the south half of the arterial street with curb, gutter and
sidewalk.
• Provide and show the design of the improvemetns needed for prospect at the intersection of
the f ronta«e road and anN work that is needed on the north leg of the frontage road in order
for the lanes to line up.
(Continued on nest pa =e
Date: /% Signa G� I�
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Olec
P*lalt,�,� 'Site _/Ola We Re;,wlt _
" Vt1utY djllile Iltllllt}' X atds* City of Furt Collins
CSU Environmental Learning Center (page 2 of 2) November 5, 1998
• Provide a sidewalk connection from the Frontage Road to the Site.
• Provide a plat of the property showing the dedication of right -of way for Prospect Road
(57.50 feet from Centerline), 15 foot utility easement along the Row and all other easements
as necessary. May wish to provide easements through the site for future connections to the
water and sewer lines for any construction to the south of this site as it appears that shore
connections will need to go through this site.
• Ifthe temporary parking lot is allowed - this design needs to be apart of the utility plan set
and site plan set.
• See additional comments on the utility plans.
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: 5-27-99 DEPT: Engineering
PROJECT: CSU Environmental Learning Center
PLANNER: Bob Blanchard
ENGINEER: Dave Stringer
All comments must be received by: June 2, 1999
❑ No Problems
❑ Problems or Concerns (see below or attached)
1. All traffic on Prospect Road needs to be coordinated with the City Traffic Engineer.
2. Cut pavement to smooth edge and match existing grades needs to be completed according in -
City of Fort Collins Repair Standards.
3. Desion improvements to Prospect Road may include bridge widening (if needed).
4. A 57.d foot Right -of -Way total is required :o be dedicated from the section line on Prospect
�. The 10 foot sidewalk shown on the upper northwest corner should be connected to the
pavement.
6_ The 28' FL -FL drive needs to be dedicated as emergency, pedestrian. and access easement.
Along with that, are other utility easements needed'
7. Please show a design and cross section of the pan on the south side.
S. A plat needs to be provided of the entire property.
9. Vertical curb and gutter, along with a detached sidewalk along Prospect road needs to be
included on the site plan.
10. In «eneral notes on page C-1 _ note number 13 should say 'traffic engineer rather than
street department'
11. The patch work on page C-3 needs to say. 'as per Cite of Fort Collins repair standards.'
12. On the very south edge. is this Boxelder Creek,'Ditch? Does anvone need to approve this
work?
Date: S'-Z? —�/° Siffnature: �C$
PLEASE. SEND COPIES OF MARKED REVISIONS: ❑ PLAT
❑ SITE
❑ UTILITY