HomeMy WebLinkAboutUPLANDS PROSPECT BUSINESS PARK PUD REPLAT LOT 5 REPLAT BLOCK 2 - Filed CS-COMMENT SHEETS - 2005-08-11PROJECT
_ COMMENT SHEET
City of Foil Collins
Current Planning
DATE: October 29, 1999 TO: Engineering
PROJECT: #3-84K Uplands Prospect Business Park — PDP —
Final Compliance
All comments must be received by Steve Olt no later than the staff
review meeting:
November 17, 1999
gcto
VVI-
Nc
Date: — Signature,_;
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site _Drainage Report _Other
Utility __Redline Utility Landscape
PROJECT
COMMENT SHEET
City of Fort Collins
Current Plann.inf
DATE: September 8, 1999 DEPT: ENGINEERING
PROJECT: #3-84J Lot 5 of Uplands Business Park Block 2
PDP - Type R LUC
ENGINEER.: Dave Stringer
1. Have not seen Owners and/or Attorneys Certifications, legals
and exhibits for easement vacation and dedications
2. Make surf; easement vacation is large enough to include
stoops/steps, loading docks and etc.
Date: 9.8 - F (� Signature: --* e
PLEASE SEND COPIES OF MARKED REVISIONS: ❑ PLAT
❑ SITE
❑ UTILITY
❑ LANDSCAPE
REVISION
COMMENT SHEET
DATE: August 16, 1999 TO: Stormwater
PROJECT: #3-84J Lot 5 Replat of Uplands Business Park
Block 2- PDP — Type II (LUC)
All comlrients must be received by Steve Olt no later than the staff
review meeting:
Wednesday, September 8, 1999
No Comment
Problems or Concerns (see below or attached)
Thank you for addressing all of the previous comments. Mylars will be accepted as the
next submittal for this project. As a reminder, please have all easements signed when the
submittal is made.
Date:
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat site _ Drainage Report _ Other 7 NG clL
_ Utility _ Redline Utility _ lmdsape
Cite of Fort Collins
UtiIitic,
light fiz }'+7�aer stornnvater wastewater wafer
TRANSMITTAL SHEET
DATE: / 7
TO:
ATTN
FROM: 5 %D,Q%7Gy�L
REFERENCE: 2 AID �fjyj�,✓y���f LOTS
We are sending you Attached Under separate cover via
ITEM
NO. COPIES
DATE
DESCRIPTION
3
9 y
THESE ARE TRANSMITTED AS CHECKED BELOW:
REMARKS
COPY TO:
For approval
For your lase
As requested
For review and comment
Return after loan to us
Make corrections
Revise S resubmit
Rejected
II)l' UJI
hill[,, fon Ji4m one 1�., 1Io rl-colh�,u us`l III IIiS
PROJECT
COMMENT SHEET
City of Fort Collins
i
Current Planninu
DATE: June 7, 1999 TO: Engineering
PROJECT: #3-84J Uplands Prospect Business Park, Lot 5,
Block 2 — Type 1 — PDP (LUC)
All comments must be received by Steve Olt no later than the staff
review meeting,:
Wednesday, July 7, 1999__ -�•
3i�iC. Lf3ei
� � �t01-�:s�� � ;ice .y �-�y���--• \ �r *� _._ef�, "',
/ 7 1
s� XE3
Date: 7 j j. Signature:f k -'
CHECK HERE IF YOLWISH TO RECEIVE COPIES OF REVISIONS
Plat _Site _Drainage Report _Other
_ 6a
Utility _Redline Utility _Landscape c;cyoero�tcomns
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning -
DATE: June 7, 1999 TO: Engineering
PROJECT: #3-84J Uplands Prospect Business Park, Lot 5,
Block 2 — Type 1 — PDP (LUC)
All comments must be received by Steve Olt no later than the staff
review meeting:
Wednesday, July 7, 1999
Lk, t
Date:
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_Plat Site _Drainage Report _ Other
Utility _Redline Utility _Landscape
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE:3-17-99 DEPT: ENGINEERING
PROJECT: Uplands P.U.D. revisions
ENGINEER: Dave Stringer
I .No additional comments
, �Z
Date: 5 -/ 7'��l. Sign_aturer�_ vim, 1.=�
PLEASE. SEND COPIES OF MARKED REVISIONS: ❑ PLAT
❑ SITE
❑ UTILITY
❑ LANDSCAPE
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: April 22, 1998 TO: Engineering
PROJECT: #3-84I Uplands Prospect Business Park, Lot 5 -
Type I (LUC) PDP/FC
All comments roust be received by Steve Olt no later than the staff
review meeting:
Wednesday, May 20,1998
2
Date: "/S'-
CHECK HERE IF YOU MH TO RECEIVE COPIES OF REVISIONS
Plat _ Sile _ Report _ Ok
„Utd�1y Re ne Utility — landscape
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: April 22, 1998 TO: Engineering Pvmnt
PROJECT: #3-84I Uplands Prospect Business Park, Lot 5 -
Type I (LUC) PDP/FC
All comments must be received by Steve Olt no later than the staff
review meeting:
Wednesday, May 20,1998
/\/ o C r -4 rrT
Date: rJ ' /q' `e) Signature: PICK
CHECK HERE IF YOU IV[SH TO RECEIVE COPIES OF REVISIONS
_ Plat _ Site _ Drainage Report _ Ok
Utility _ Reline Utility _ Landscape cty oe For; cou;ng