Loading...
HomeMy WebLinkAboutUNIVERSITY SHOPPING CENTER REPLAT - Filed GC-GENERAL CORRESPONDENCE - 2005-08-11D A V S cA - INcRSHI> ■ ■ November 4, 1998 Ms. Sheri Wamhoff Current Planning Department P.O. Box 580 Fort Colins, CO 80522-0580 R. C„ R C H I T E C T S ■ ■ ■ Re: Minor Amendment to P.U.D. CPC/DS 73-120-A4(92) IstBank University Center Architect's Project No. 98206.00 Dear Ms. Wamhoff: This letter is in response to the Minor Amendment comments received from the Current Planning Department dated October 19 and 21, 1998. We have reviewed the comments and have the following responses: Water/Wastewater: The site plan on sheet 1 of 4 has been updated to show utilities, particularly water/sewer services and mains. Engineering: The site plan on sheet 1 of 4 has been revised to include a sidewalk connection between the existing sidewalk along the entrance drive and the new sidewalk north of the building. Please forward this letter and enclosures to Roger Buffington for his review. We look forward to your prompt review of these responses and approval of this project. If you have any further questions or comments, please do not hesitate to contact me. Sincerely, Rob Fink cc: Stephen Alt Ft. Collins Current Planning Department Stan Lee 1 stBank Holding Company Kevin Scott Davis Partnership Craig Dunham Davis Partnership .,V, H I: _ . A -.F��'T K P : )R,3T DAVID M RHYNE MELLON FINANCIAL CENTER 1775 SHERMAN STREET SUITE 3100 DFNVLR, COLORADO 80203-4325 (303) 86 1 -8555 FAX (303i 861-3027 p.A I stbankV95206AodminAletterAsw I I Q398 docAv'r Dl1)1'VIAJ)PMGfV�[' 1F� C'k)0M['/\N1' July 13,1998 Sheri Wamhoff City Of Fort Collins F,ngincering Department/ Development Review Division 281 North College Ave Fort Collins, CO 80522-0580 Dear Sheri, Attached are the final vellum copies of the University Center P.U.D. civil engineering drawings, lhrce copies of the Drainage Report which include changes discussed in our July 9, 1998, meeting with Jeff hill and Basel Hamden and the redlined drawings from the previous submittal. Please have these drawings routed for signatures. I have also include a vellum copy of the Landscape plan showing all utilities. if this sheet is not necessary then please disregard. The unit costs for installation of utilities necessary for the Development Agreement are available from Bucher, Willis & Ratliff if you have not already received them. We are anxious to execute the Development Agreement and begin construction so if you have any questions in this regard please do not hesitate to call. Thank you for your cooperation on this project. P.S. 'file Plat has been submitted to Steve Olt for required signatures. Sincerely, Antholly /P/Kill Project Manager 7uu11 I ;'CI III'I .I I'V II v4 "VI A( I •SI'! I,� IGP Wt "'96-8Rti•I 1A 1 LJ?! 14 i , , , 10h.4115 BUCHER, WILLIS & RATLIFF 1011111111L CORPORATIO N FN(IINFFRS I PLANNERS 1 ARCIiITFCTS June. 4, 1998 Mrs. Sheri Wamhoff City of Fort Collins Engineering Department 281 North College Ave. Fort Collins, CO 80524 Ile: University Shopping Center Dear Sheri: Bucher, Willis & Ratliff Corporation has once again completed a revision to the Utility Plans, Plat and Drainage Report for the University Center PUD. We have prepared the plans and report utilizing the Site Plan provided by Concepts West Architecture, Inc. dated May 26, 1998 and the: City's comments dated May 22, 1998 on our previously submitted plans. We believe that we have comprehensively addressed the issues and concerns to date. Enclosed with this letter are the following: Three copies of the Drainage and Erosion Control Report (including a letter to the City of Fort Collins and the Grading, Drainage and Erosion Control Plan in the back pocket) Three copies of the Utility Plans Three copies of the Plat (inserted into the Utility Plans set) One copy of each of three Landscape drawings from the Amended Development Plan prepared by Concepts West Architecture, Inc. Thank you once again for your favorable consideration of this project. If you have any questions, please call us. Sincerely, BUCHER, WILLIS & RATLIFF CORPORATION Andrew J. Walsh, P.E. Project Engineer AJW/ajw H. A1121I5\ W PCUKPASf I I V IIA Z U(C 171; WV1F sIRFF F,, SU I rF'_O() 1 DENVER, COLORADO 80202-12801 30a/292-50561 FAX :30V292-5668