HomeMy WebLinkAboutBLOCK 132 226 REMINGTON STREET LOT 15 - Filed CS-COMMENT SHEETS - 2005-08-10PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: August 11, 1998 DEPT: ENGINEERING PROJECT: Kitchen Design Center - 226 Remington Building Permit Review All comments must be received by Sheri Wamhoff no later than: Monday, August 31, 1998 226 Remington - Kitchen Design Center August 26, 1998 Utility Plans • Add the following note on the overall utility plan and show the old/existing curb. Remove existing curb return, place new curb and gutter at property line. (R) • Label the 8" cinder block wall as existing. This assumes it is. • The elevations on the East side of the alley show a new proposed elevation several inches higher than the existing elevation. How does the raising of this side effect things? Is this in an area that is adjacent to the building? Existing pavement? How can this be done with out affecting other things or doing off -site grading and pavement? May need to provide elevations as necessary to show the x-section can be met and that existing grades are being tied into. (Repeat) • What is the grade in the alley that is being tied into on the north/ • Tlie grade break in the alley design is too great. Use a vertical curve or several grade breaks to meet the design standards. • Provide a driveway cut detail. (Repeat) As it is being shown modify detail D-16 to reflect what is being proposed. Additional comment from Planning: Shingle type is not indicated on the elevations. The shingle type shalt be High Profile Heavy Dimensional Date: � � � i Signature: CHECK HERE IF YOti WISH TO RECEIVE COPIES OF REVISIONS: _ Plat Oksite _ Drainage Report _ Other OCUtility Q!Redline Utility CK Landscape City of Fort Collins PROJECT COMMENT SHEET Building Permit Review Current Planning DATE: ,tune 23. 1998 DEPT: Engineering Pavement PROJECT: Kitchen Design Center - 226 Remington Building Permit Review (old use by right) PLANNER: Peter Barnes, Zoning ENGINEER: Mike Dean/ Sheri Wamhoff All comments must be received by: July 14, 1998 * Note: Even though this development is a "building permit review", it is necessary that all applicable Article 3 and Article 4 standards are satisfied. Please review the site plan, architectural elevations, and landscape plans for compliance and make those relevant comments on this sheet. If alley of street improvements are required a soils and pavement design report will be needed Date: %- l0 Signature: CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat _Site _Drainage Report _Other _Utility _Redline Utility _Landscape City of Fort Collins. PROJECT COMMENT SHEET Building Permit Review Current Planning DATE: June 23, 1998 DEPT: Engineering PROJECT: Kitchen Design Center - 226 Remington Building Permit Review (old use by right) PLANNER: Peter Barnes, Zoning ENGINEER: Mike Dean/ Sheri Wamhoff All comments must be received by: July 14, 1998 * Note: Even though this development is a "building permit review", it is necessary that all applicable Article 3 and Article 4 standards are satisfied. Please review the site plan, architectural elevations, and landscape plans for compliance and make those relevant comments on this sheet_ W ITH iN — PFLVI0c- 5� v CoP� OF I tic PLAT D T e I I S Tttc OTiLIT`' 2 G3`,vctE�iz.os F2�� TNc AAA) f PPOf=I S PaDPi 2T;', IgLAeie- 130 L7- - 1 t�cLvOL 1 Ltr Cz2A.D Iru (r PLC ll� f1 5 "4' Wit= c L�ILI i PLIES it Scc 2tDun t=o2- ADDITiD/<u �,r-�itgn Cbrn�z.a.`t� en, !o�►•C.� — �l��✓//,� Date: - /c/ _ ,�8 Signature: CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS (Plat Site Drainage Report _Other /Utility x.Redline Utility Landscape 226 Remington - Kitchen Design Center Site Plan bTdewalk adjacent to the parking stalls needs to be a min of 6 feet in width per LUC section J (C 1(5) as well as the sidewalk on the south side of the property. The sidewalk on the south side of the property is being shown as a concrete swale on the grading pan. It can be one or the other _ but not hoth. A Swale section does not meet ADA requirements. nor do we want to have 1people walking down a swale. 'Per the alley standards a garage should have a set back of 8 feet from the alley Row. Show the alley improvements on the site plan. Utility Plans j Piiic plans need to be titled "utility plans for .. " and need to include the current month and year. -ne engineering compam that prepared the plans name, address and phone number need to be on Lich sheet. ,^ke changes to the general notes as shown. - - - - - A copy of the existing plat needs to be included as the second sheet of the utility plan set. >ew the limits of'patching on the utility plans. r... ide a detail of how the drainage pan is to tie into the sidewalk on the west side of the i ` operty and label the sidewalk chase on the east and provide a detail. Zconcrete Swale on the south side of the propert:✓ is being shown as a sidewalk on the site . It can not be both. ---.Provide drivewav cut detail D-15 or detail a flared entrance per detail 1 on D-3-b. 1/the drivewav into the garage concrete or asphalt? ' Xe grading plan and allay plan need to be a part of the utility set and numbered as such. ��clete note on plans indicating that alley paving is to be per contractors agreement with City. ,Jiic alley paving will he in accordance with the design provided and approved by the city and in accordance with a City approved Soils Report. ,A soils report is needed for the alley - talk to Rick Richter with Nang in regards to the soil report requirements. -------Provide a flowline profile for the alley and a section cut at the intersection of Olive street. a irc proposed x-section of the allev does not meet either of the alley standards. The standard •needs to be met. A variance on the x-slope of the alley maybe allowed for a x-slope of less than 2.0`%, if needed to work with existing fixed grades. Suggest detail D-3-b is used. -- - - -- Provide elevations as necessary to show that the x-section can be met and that existing grades are tied into.