Loading...
HomeMy WebLinkAboutBLOCK 103 218 WEST MAGNOLIA STREET F J SPENCERS RESUB LOT 20 - Filed CS-COMMENT SHEETS - 2005-08-10PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: September 13, 1999 DEPT: ENGINEERING PROJECT: #26-99 Edwards House PDP — Type I (LUC) PLANNER: Steve Olt ENGINEER: Marc Virata All comments must be received by: October 13, 1999 ❑ No Problems ❑ Problems or Concerns (see below or attached) General Comments • The question was raised regarding the name of the project. The projected was routed as "Edwards House PDP", which appears to duplicate a project with the same name. The project is noted as "218 West Magnolia Street" on the utility and site plans. For future reference, the project should be known by the City as "218 West Magnolia Street" aka (Edwards Residence). • The letter provided to the City from the neighbor to the west to allow work offsite was originally not dated. A dated letter has since been provided which appears to be acknowledged by the property owner to the west and is acceptable. • A letter of intent for the onsite easement dedication is required prior to a hearing. • The easement dedication language should be revised as follows (see redline): ➢ Note who is/are the owner(s) in the dedication statement (after "The undersigned Add "in consideration of Ten Dollars ($10.00) in hand paid, receipt of which is hereby acknowledged, and other good and valuable consideration" (prior to "do hereby dedicate...") i Add "Grantor:" prior to the "By: " sections. Space should be provided below the Signature of the grantor(s) for printing the name, as well as a line for the title ("Title: ") of each signature. The Attorney's Certificate has some minor corrections. Date: `I / .1 3Ao-9 Signature;�" PLEASE SEND COPIES ❑ PLAT OF MARKED REVISIONS: ❑ SITE El UTILITY NO COMMENTS —SUBMIT MYLARS 0 LANDSCAPE • I have no objection to the submission of mylars, so long as other departments are ready. • Enclosed is a Development Construction Permit (DCP) application as well as information needed for the Development Agreement. The DCP application with cost quantities should only be filled out when it is determined that the project is ready for mylars. Utility Plan • General Note 91 should reference the Development Agreement. PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: September 13, 1999 DEPT: ENGINEERING PROJECT: 926-99 Edwards House PDP — Type 1 (LUC) PLANNER: Steve Olt ENGINEER: Marc Virata All comments must be received by: October 13, 1999 ❑ No Problems [r Problems or Concerns (see below or attached) Site Plan • The site plan shows a pathway leading from the sidewalk to the street. This is not shown on the utility plans. (A ramp is needed for this pathway out to the street.) • The site plan notes 3 parking spaces in front of the garage on the concrete driveway. Will this be striped? Utility Plan • Provide details lot the driveway and provide sidewalk ramps and a detail of the sidewalk ramps leading to and from the driveway. • Off -site grading easements are required from the property to the west. A letter of intent is needed for the easement prior to going before a hearing. • Will the porch partially be in the 5' easement on the west edge of the site? • The iron pipe is not allowed to be used to dayligbt into the street. Please look at other conveyance systems. such as a concrete channel within the right-of-way. Date: Signature: d PLEASE SFN COPIES a PLAT OF MARKED REVISIONS: a SITE ❑ NO COMMENTS — SUBMIT MYLARS [a UTILITY 'LANDSCAPE PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: September 13, 1999 TO: Engineering/Pavement PROJECT: #26-99 Edwards House PDP — Type 1 (LUC) Al I comments must be received by Steve Olt no later than the staff review meeting: Wednesday, October 1* 1999 �O l! O v�n� Date: 0, Signature: CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report _Other Utility _Redline Utility _Landscape c,ry oe Foy cou;as IONREVISION COMMENT SHEET DATE: August 27, 1998 TO: Engineering PROJECT: #10-98 Kruger Office Buildinzn g - PDP - Type II All comments must be received by Mike Ludwig no later than the staff review meeting: Wednesday, September 23,1998 MAJOR COMMENTS: note: refer to the individual sheets for specific comments and concerns Sheet 2 of 4: Copy of Recorded Plat and Survey Map O The alley needs to be vacated by separate document and process. It will need to go to City Council and they will need to approve of the vacation. LNO Comments continued on sheet 2 - Date: ylis Sipature: x� City of Fort Collins Comments continued from sheet 1... Sheet 3 of 4: Grading, Drainage, and Utility Service Plan Please look at regrading the site so that it drains into the alley rather than draining through a sidewalk chase. The City does not want to maintain the chase. Asphalt cuts are not allowed to be along a vehicles tire path. Please make sure that the asphalt cuts are either in the center of the travel lane or along lane line. You will need to provide either an offsite construction easement or a letterfrom the adjoining property owner giving permission: to perform any construction on his/her property. tftheatley-is-vscaet`-d,�oawi}}-need3o�edicate-e�uHfie-ac�c�ess-eesemenF-inrtts-p4aee- PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: February 13, 1998 TO: Engineering Pvmnt PROJECT: #10-98 Kruger Office Building - Type I1 PDP All comments must be received by Mike Ludwig no later than the staff review meeting: Wednesday, March 18,1998 NC- I/ Date: 5- /O -5 CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _ PW _ Site _ Drainage Report _Other _ Utility _ Redline Utility _ Landscape G _4 City of Fort Colfim Date: 5- /O -5 CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _ PW _ Site _ Drainage Report _Other _ Utility _ Redline Utility _ Landscape G _4 City of Fort Colfim DATE: November 11, 1998 TO: Engineering PROJECT: #10-98 Kruger Office Building PDP - Type II (LUC) All comments must be received by Mike Ludwig no]a-terthin the staff review meeting: Wednesday, December 2, 1998 ❑ No Comment [] Problems or Concerns (see below or attached) Sheet 3 of 4: Grading, Drainage, and Utility Service Lines and Erosion Control Plan > The access into the site needs to be paved with concrete up to the property line per standards. Remove the asphalt prior to constructing the 4 foot sidewalk. Pave the alley to the east edge of the alley. Check with the Transportation Planning department regarding sidewalk connections to the 1" National Bank and other surrounding properties. Sheet 4 of 4: Detail Sheet Provide a detail of the driveway access Modify the detail to reflect the actual conditions. Include concrete to the properly line, dimensions, slopes, etc. SEE SITE PLAN FOR ADDITIONAL COMMENTS AND CONCERNS. Date: r2/ %98 Signature CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS ✓ Plat ✓ Site _Drainage Repod ✓Utility ,/Rerliae Utility ✓Landscape PROJECT COMMENT SHEET City of Fort Collins Current Plannint DATE: March 20, 1998 DEPT: Engineering PROJECT: Kruger Office Building ENGINEER: Michael Coley ®No Problems Problems or Concerns (see below or attached) Utility Plans • Include a plat with the utility plans, even if for reference only. • Site plan shows sidewalk along alley, be consistant. • Site plan shows landscaped islands extending into alley ROW, be consistant. • The alley must be improved along the frontage of the property. • Parking lot shape is inconsistant with site plan. • Proposed grade lines and detention pond boundaries must be shown. • The telephone and power poles at the parking lot entrance must be relocated. • The back porch design is inconsistant with that shown on the site plan. 39 Site plan shows window wells on North and East side of the building. Site Plan • Coordinate vault location with Light and Power. • Drive aisle must be 24' minimum. • Stall width must be 9' minimum. • The alley to the East of the property is public ROW. If you would like the City to vacate, contact Mike Coley at 221-6750 to discuss feasibility and coordinate vacation process. ** See redline utility plans for additional comments' Date: 3/ z c� /I 9 8 Signature: PLEASE SEND COPIES OF MARKED REVISIONS: PLAT ® SITE ® UTILITY ® LANDSCAPE