HomeMy WebLinkAboutTIMBERWOOD DRIVE AT PRESTON CENTER - Filed CS-COMMENT SHEETS - 2005-08-04PROJECT
COMMENT SHEET
City of Fort Collins
DATE: 19 May, 1998 DEPT: Engineering
PROJECT: Timberwood Drive @ Preston Center
ENGINEER: Tim Blandford
All comments must be received by: June 10, 1998
No Problems
Problems or Concerns (see below or attached)
GENERAL COMMENTS:
Sheet 2 of 11: Grading, Drainage, and Erosion Control Plan
Buildings cannot be constructed within the drainage easement. Please modify.
Sheet 3 of 11: Street Plan and Profile
Please provide some sort of enhanced crosswalk feature where indicated on the
plans. Talk with Kathleen Reavis regarding possible design options.
Please modify the note regarding concrete to the property line on Gifford Court.
Sheet 10 of 11: Details
cD Show the enhanced crosswalks.
Provide no parking signs within the traffic circle or note t the curbs will be
painted red or both.
Date: 61z,198 Signature:
PLEASE SEND COPIES OF MARKED REVISIONS: ® PLAT
® SITE
® UTILITY
® LANDSCAPE
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planninu
DATE: March 3, 1998 DEPT: Engineering
PROJECT: Timberwood Drive at Preston Center
ENGINEER: Michael Coley
Utility Plans
N Is this property already platted? If not, either provide a plat or indicate if the ROW
is dedicated be seperate document.
Sheet 2:
X Existing and proposed contours should tie together.
Sheet 3:
* 150' minimum tangent length at the intersection of Timberwood and Corbett needs to
be provided.
* Minimum centerline radius for a Collector is 610'.
• All dead-end driveways and streets need a type 3 barricade.
• A drainage pan between the travel lanes and parallel parking spaces is not allowed.
• Please provide a detail of the traffic circle showing truck movements.
• Please provide a striping plan, typical street section, and utility crossings in profile.
39 A utility easement adjacent to the ROW is needed.
Sheets 5 - 9:
39 All offsite utilty work will require easements.
Date: Signature:
PLEASE SEND COPIES OF MARKED REVISIONS: ❑/PLA '
❑ SITE
UTILITY
LANDSCAPE
PROJECT
COMMENT SHEET
City of Fort Collins
DATE: 21 January, 1998 DEPT: Engineering
PROJECT: Timberwood Drive n Preston Center
ENGINEER: Tim Blandford
All comments must be receiver! by: May 1, 1998
No Problems
Problems or Concerns (see below or attached)
GENERAL COMMENTS:
Sheet i of 11: Cover Sheet
Please modify the General Notes as stated on the utility plans.
Please modify the title.
Please include a north arrow on the vicinity map.
Sheet 2 of 11: Grading, Drainage, and Erosion Control Plan
Please provide documentation of the variance granted regarding the reduced
tangentlength.
Please indicate the street names that Timberwood Drive connects to.
Please see sheet 2 for additional comments &+
Date: ` /. % 1��
i
Signature:(,'�� \--
PLEASE SEND COPIES OF MARKED REVISIONS
®
PLAT
®
SITE
®
UTILITY
®
LANDSCAPE
Comments continued from sheet 1...
O Please update the construction sequence.
Please indicate the location the construction detail is being used and reference the
Beta i I.
Sheet 3 of 11: Street Plan and Profile
Please provide documentation of the variance granted regarding the reduced
tongentlength.
Since: this is not being platted at this time, we will need to see all easement
dedications including temporary easements for utilities, drainage, etc.
Since: Timberwood is a public street, we do not want to be responsible for the
maintenance of the decorative area in the traffic circle. Please indicate as asphalt
only.
The ROW will need to be dedicated by separate document. Please note on the plans
and provide the appropriate documentation.
Please provide a striping plan for the entire length of Timberwood, not just the
traffic circle.
Please provide some sort of enhanced crosswalk feature where indicated on the
plans. Talk with Kathleen Reovis regarding possible design options.
Please refer to sheet 3 for additional comments and concerns.
Sheet 4 of 11: Street Plan and Profile
Please refer to sheet 3 for comments and concerns. They will apply to this sheet