HomeMy WebLinkAboutTIMBERLINE CHURCH PUD 2908 SOUTH TIMBERLINE ROAD - Filed MA-MINOR AMENDMENT - 2003-01-14Page is too large to OCR.
City of Fort Collins Zoning Department Comments Due By:
281 N. Colleg Ave, PO Box 580 Minor Amendment 4 At6 eFo 4
Fort Collins. CO 80�22 Planner liLiz- awe?
City o£Fort Collins (970) 416-2745 PAX (970) 224-6li4 Effective Date
Minor Amendment Application Form
Date Submitted: k ;., r t i -5
Project Name:
Project Location Street Address
1 (. f ): _�, I 0 S S, �.w��t e.(i r� 2, Minor Amendment Fee: 5192.00
Legal Description: 1 �^^k1Rr l
General Information: List all property owners having a leg l/equitable interest in the property (Attach separate sheets if necessary).
Owner's Name (s): _L � ],cJ'_- (tip h-�
Street Address: l ivKbPTltn G City/State/Zip: co
Telephone: `1 10 LI S J 111 t I Fax:
Applicant's/Consultant's Name: -7sG. A -er _ Name of firm:
cm_�cr¢
�p f ,
Street Address: �t9, r_se�aA �(� City/State/Zip: La1l !S, C_Q i &5
Telephone: c{�G_-�12_J.1=�5_— Fax: %1j=q"169 Email: '�sat�P_,C(�Tlrh ii e.{'�ivl�Ghtl rtrir
ri
ok1 Ot c-PA-0.55eC1a-te_S'CpYY1
SUBMITTAL REQUIREMENTS:
1) Six (6) copies of RECORDED plan (i.e. site, landscape, elevation, etc. - whichever is being altered) on
24" x 36" size (usually available at the Technical Services Department at 281 N. College) — RED -LINE
THE CHANGES ON the six plans or provide six copies of revised drawings showing the changes in
addition to the six originals;
2) Completed and signed application form; and
3) Application fee of $192.00.
MINOR AMENDMENT
Detailed description of the change and reason(s) for the
r
:i
C
ti
i r� ( C1 C
t ( LZ [1k 0. $
�Ilo� I T- C
t J k . L {\1 r r(ti GK S5 1 r
�C\{L,
C:�tG,.'t[�°�"t9
i�R�1�'�n4
r
Y19LJi fk%1 0'1'! -Wn.v fd IWi� df ,
CERWICATION
I certify the information and exhibits submitted are true and correct to the best of my knowledge and that in filing this application, I am acting with
the knowledge, consent, and authority of the owners of the property (including all owners having a legal or equitable interest in the real property, as
defined in Section 12 of the City Codc; which is the subject of this application) without whose oonseni and authority the requested action should not
lawfully be accomplished. Pursuant to said authority. I hereby Permit City officials to enter upon the property for the purpose of inspection, and if
necessary, for posting a public notice on the property
-
Name (please PRINT):
Address:
Telephone:
Approval Items for MA05042
Subdivision: TIMBERLINE CHURCH PUD
Site Address: 2908 S TIMBERLINE RD
Department/Description Action Taken Entered By Comments (if any)
CURRENT PLANNING
04/15/2005
OK
Ted Shepard
ENGINEERING -DEVELOPMENT REVIEW
04/21/2005
CMNT
Sheri Wamhoff
I will defer to stormwater to determine if revisions need to
be made to the utility plans for the proposed changes.
06/10/2005
OK
Sheri Wamhoff
STORMWATER ENGINEERING
04/21/2005
CMNT
Basil Hamdan
Please show how the added parking area will be
connected to the existing detention pond, a swale should
be designed and graded directing flows from the parking
area to the detention pond.
Please revise the grading plan showing the new parking
lot configuration and that Swale.
06/09/2005
OK
Basil Harridan
Approved.
WW W - ENGINEERING
04/18/2005
OK
Jeff Hill
ZONING
04/21/2005
OK
Peter Barnes
Page 1 of 1 09/13/2005 2:05:21 PM
Project: Timberline Church PUD (Minor)
Description: Enlargement of existing parking lot pavement area
Justification: The church now holds 5 services per weekend, in effort to alleviate
pressure on the building and parking. Though services times are spaced in
such a manner as to alleviate "doubling up" of parking requirements, the
occupancy of the building requires that many people park on dirt areas.
The church now has overflow parking areas which has a recycled asphalt
(granular) surface. The overflow of cars typically extends beyond the
recycled asphalt area. The recycled asphalt has also become problematic,
as it tracks into the building and requires additional cleaning of the
facility. The church also facilitates many events such as concerts,
funerals, weddings, etc. which require parking for many more cars than
the current lots will handle.
When moved to this location nearly three years ago it was proposed by the
cAy that the church try the existing allotted number of parking stalls before
adding additional parking capacity. From the time the church moved to
this location, parking has been a consistent problem as the allotted parking
has been insufficient.
Impact: Landscaping will be implemented per the original approved design and
specifications. The configuration will change slightly and is noted on the
Proposed Layout drawing
Storm Drainage will comply with the original approved design.
Additional impervious surface area noted on attached worksheet.
Attachments:
I. Original PUD site drawing with affected area noted
2. Original Landscape design
3. Letter of compliance from civil engineer
4. Proposed layout changes drawing
5. Overall site surface area information sheet (pervious / impervious
surface areas)
6. Site Lighting drawing with lumen schedule
Stantec Consulting Inc.
209 South Meldrurn Street
Pon Collins CO 80521-2603
Tel: (970) 482-5922 Fax: (970) �82-6368
stat1I:2C.CG
November 9, 2004
City of Fort Collins
Planning Department
Development Review Division
281 North College Avenue
P.O. Box 580
Fort Collins CO
80522-0580
RE: Timberline Church Phase 1B Drainage Letter
Dear Ted Shepard
I have reviewed the attached drawing and find that it is fundamentally in compliance with the
drainage report for the Original PUD. There is no increase in hard area therefore the detention
facilities are adequate.
The only difference from the original plans is the configuration of the Church staff and facilities
service area. My understanding is that this area is temporary in nature and may be torn out or
modified when the church expands to the south. Even with this parking the hard surface area
allowance is not exceeded. This area does need to be graded to the south and east and
connected to the existing detention facility with a temporary swale that has a grade of 1-0.5%.
Sincerely,
STANTEC CONSULTING INC.
AW;
Jim Allen -Morley, P.E.
Senior Project Manager
Tel: (970) 482-5922
Fax: (970) 482-6368
ja Ilen mo rl ey@ sta ntec. com
TIMBERLINE CHURCH PUD
SURFACE AREA INFORMATION
GROSS LOT SIZE:
BUILDING
EXISTING/APPROVED BUILDING
COVERAGE:
PAVING
EXISTING/APPROVED PARKING
AND LANE PAVING:
PAVING ADDITION:
TOTAL PAVING:
LANDSCAPE/GREENSPACE
EXISTING GREENSPACE:
DEDUCT FOR PAVING:
LANDSCAPE IMPROVEMENTS:
NET GREENSPACE AREA:
1,428,466 SQ FT
32.793 ACRES
62,430 SQ FT
283,487 SQ FT
176,688 SQ FT
460,175 SQ FT
1,023,227 SQ FT
(176,688 SQ FT)
14,135 SQ FT
860,674 SQ FT