Loading...
HomeMy WebLinkAboutPROVINCETOWNE PUD SECOND - Filed GC-GENERAL CORRESPONDENCE - 2005-07-28MANHARD CONSULTING � D. May 20, 2002 Basil Harridan City of Fort Collins Engineering P.O. Box 580 Fort Collins, CO 80521 RE: Response to Redlined Plan dated May 10, 2002 Provincetowne PUD, Filing #2 Dear Basil: COLORADO Littleton 8232 E. Park Meadows Drive Littleton, CO 80124 303.708-0500 Fax 303.708.0400 Email: info@manhard.com ILLINOIS Vernon Hills 847.634.5550 Downers Grove 630.515.8500 We have received your redlined drawing for the Provincetowne, PUD Filing #2 Trilby Road sanitary sewer. We have provided the following written response and the enclosed final drawing for your review. A mylar drawing has been sent to Mr. Terry Farrill for approval and will then be forwarded to you. 1. The proposed ground above pipe would leave no cover contrary to your statement in the response letter. Please provide minimum cover above the pipe. Response: The cover shown above the 24" storm pipe has been proposed so that the pipe daylights into the channel. Therefore, no cover is needed at that location (the flared end section). In the future, the sidewalk will be extended and improvements to this area will be required. The future sidewalk will be at approximately 4959.0, while the top of the 24" will be at approximately 4957.0, resulting in a clearance of 2 feet. These proposed future improvements are not shown on this plan since they are not to be constructed at this time. If you should have any questions, please do not hesitate to contact me. Yours truly, MANHARD CONSULTING, LTD. Sean Be' ins, P. . Project Manager SB/jlp cc: Sheri Wamhoff, City of Fort Collins Engineering Terry Farrill, Fort Collins/Loveland Water and Sanitation District P: 0cfcc/documents/review comments/5-20-02 Engineers Surveyors Planners MANHARD CONSULTING April 23, 2002 Sheri Wamhoff City of Fort Collins Engineering 281 North College Avenue Fort Collins. CO 80522 RE: Response to Comments Dated April 17, 2002 Provincetowne PUD, Filing #2 Dear Sheri: C_OLORADO Littleton II232 E Pa,k Moadom,s Dnvr LillIelon, C0 801 11 101.708 0500 F, 305.708A400 Email: Ink,(!n,anhardrum ILLINOIS Vernon Hills 847.614, 5550 Downers Grove 630.111 58500 We have received your comments for the Provincetowne, PUD Filing #2 Trilby Road sanitary sewer. We have provided the following written responses and a revised plan for your review. 1. Need to work with the district on providing easements for this line and the installation of it outside of the row. Response: The sewer will now end at the property line and will no longer need an easement. 2. Show the channel in its existing condition. How much cover is above this line? The culvert will need to be extended in the future. Is there clearance so that this line can be extended in the future? Show where the culvert would sit over the sewer line, the culvert will need to be extended beyond the sidewalk with future improvements. Response: There is adequate clearance for the culvert to be extended in the future. The crossing is shown on the profile. 3. Need to number this sheet as a part of the original set. Response: The sheet number has been changed to 62A of 99. If you should have any questions, please do not hesitate to contact me. Yours truly, MANHARD CONSULTING, LTD. engineers Surveyors Planners Sean Berzins, P.E. Project Manager SB/jlp P: kbcfcc/documents/review comments/4-23-02 Services Engineering Department City of Fort Collins May 17, 2002 Jim Pearson KB Homes Colorado Inc. 8401 East Belleview Ave, Ste 200 Denver, Co 80237 Re: Provincetowne PUD Filing 2 ditch lateral and diversion structure construction. Dear Jim; It was brought to our attention by Steve Dyekman the Superintendent for the North Louden Ditch that some work was occurring on the lateral that extends eastward from the Benson Reservoir that they were not aware of and not all of the work being done is acceptable to them. It appears the work being done is shown on the approved Utility Plans for this project. However, the Utility Plans do not contain the Ditch Companies/ Owners approval as required by Section 1.2.7 of the Storm Drainage Design Criteria and Construction Standards. In accordance with these standards the Developer is responsible for contacting the Ditch Company and obtaining the appropriate ditch company signatures prior to submitting for City review and approval. The City Natural Resources Department has also indicated to me that they told Manhard Engineering (the design consultant) that they needed to work with the Lateral owner and get there approval for all work associated with and/or would impact the lateral. It does not appear that this was done. In order to correct this error KB Homes needs to work with the lateral owner to obtain approval for the work associated with the lateral, correct problems with the diversion structure (correct gate placement and make sure that the water will go into the appropriate ditch when the gate for that ditch is opened) and provide an easement adequate for maintenance of the lateral. Approval can be signatures on the existing plans showing approval of existing designs or signature on revised plans. Any revisions to the plans also need to be reviewed and approved by the City. Let us know within 2 weeks of the date of receiving this letter as to your planed course of action and anticipated timeline. If you have any questions, please contact Sheri Wamhoff at 221-6750. Sincerely, Sheri L. Wamhofi; P.E. cc: Teresa England, KB Homes Colorado Inc. Steve Dyekman, North Louden Ditch Superintendent Cam McNair, City of Fort Collins City Engineer Lance Newlin, City of Fort Collins Engineering Inspection Glen Schlueter, City of Fort Collins Stormwater Utility Mark Sears, City of Fort Collins Natural Resources Doug Moore, City of Fort Collins Natural Resources file 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605