PROJECT
COMMENT SHEET _
REr,T+,TZT N,L
AUG 0 9 2004
DATE: August 8, 2004 TO: Technical Svcs.
PROJECT: 432-04 College and Trilby Annexation and
Zoning — 6541 S. College Avenue — Type II
(LUC)
All comments must be received by Steve Olt no later than the staff
review meeting:
September 1, 2004
ote - PLEAsE identify your redlines for future reference
?. R-DT7IG�n/T AnlNExRTioN NR-i✓tE l5 /A/LaR,2EfTL� ,Srlu,.✓nl On/ PGRT,
/i'UTc.OLC)
Name (please print)
=" CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
'[at _Site _Drainage Report _Other
Utility _Redline Utility _Landscape
City of Fort Collins
Project Comments Sheet
Selected Departments
_ i!ti ts i'isf i t olStiti
Department: Engineering
Date: September 2, 2004
Project:
COLLEGE AND TRILBY ANNEXATION AND ZONING - 6541 S. COLLEGE
AVE. - TYPE II
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
September 01, 2004
Note - Please identify your redlines for future reference
Issue Contact: Sheri Wamhoff
Topic: General
Number: 4 Created: 9/2/2004
[9/2/04] Technical Services comments:
1.13oundary and legal close.
2.Adjacent annexation name is incorrectly shown on plat.
3.Please note row dimensions.
4.Vicinity map would be better.
Number: 5 Created: 9/2/2004
[9/2/04] If there is an annexation agreement I would like to see it. Otherwise I have no
comments.
Signature Date
_ / _
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
*" Plat Site Drainage Report Other
Utility Redline Utility Landscape
Page l
FINAL PLAN
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: October 28, 2004 TO: Technical Services
PROJECT: #32-04A College and Trilby Subdivision - FINAL
PLANS
All comments must be received by Steve Olt no later than the staff
review meeting:
November 24, 2004
Note - Please identify your redlines for future reference
3 Lis �9 C iyv T wC-4rAa3 es , 4ZZ- 4t�V5C� 7S "r111 -,,—
yy�lSC.� I l
Name (please print'
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
✓a,
Plat site _Drainage Report _Other
_Utility Redline Utility __Landscape City of Fort Collins
Owqft
Project Comments Sheet
��'" S
City of Fort Collins elected Departments
Department: Engineering
Date: November 26, 2004
Project: COLLEGE AND TRILBY SUBDIVISION - FINAL PLANS
All comments must be received by Steve Olt in Current Planning, no later than the staff
review meeting:
November 24, 2004
Note - Please identify your redlines for future reference
Issue Contact: Sheri Wamhoff
Number: 15
Comments from Technical Services
Boundary and legal close.
This property is not yet annexed into the City.
Easements are not locatable — all easements
Created: 11/26/2004
must be locatable on the plat.
Number: 16 Created: 11/26/2004
1 thought the row on Trilby was supposed to be dedicated to the County with the project. Was it not already
dedicated? If dedicated need to note reception number as did with row on College Ave and not include it in the
plated boundary. If it hasn't been it need to indicate that the row is being dedicated by this plat
Number: 17 Created: 11/26/2004
A 15 foot general utility easement needs to be provided behind the row.
Number: 18 Created: 11/26/2004
Need to dimension the easements shown on the plat so they are locatable.
Number: 19 Created: 11/26/2004
Need an access easement at the northeast corner of the plat where the driveway exist crosses onto the
property.
Number: 20
Created: 11/26/2004
Need to dedicate an access easement across both lots from the access on Trilby to the access on College.
Number: 21 Created: 11/26/2004
The detention pond should really be within its own tract and not a part of lot 2. Need to identify on the plat who
is responsible for the maintenance of the detention pond. Is it just lot 2 or is it both lots. If the pond is in a tract
identifv who is to own and maintain that tract.
//2(D D`f
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other_
Utility Redline Utility Landscape
Page 1
�. Project Comments Sheet
Selected Departments
f „liirs
Department: Engineering
Date: December 29, 2004
Project: COLLEGE AND TRILBY SUBDIVISION - FINAL PLANS
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
December 29, 2004
Note - Please identify your redlines for future reference
Issue Contact: Sheri Wamhoff
Topic: General
Number: 16 Created: 11 /26/2004
[12/28/04] 1 have a call into the County to check and see if this was received and
processed. Even if it has, it will probably work to show it being dedicated on this plat. I
received a call back from the County. The row dedication documentation had not yet been
filed, but they are planning on processing it next week. Please contact Matt Lafferty with the
County if you have questions on that. Once the row is recorded it will not need to be
dedicated on this plat.
I thought the row on Trilby was supposed to be dedicated to the County with the project.
Was it not already dedicated? If dedicated need to note reception number as did with row
on College Ave and not include it in the plated boundary. If it hasn't been it need to indicate
that the row is being dedicated by this plat.
Number: 17 Created: 11/26/2004
[12/28/041 1 need to see a copy of the easement language for Rec # 2004-0044322 to verify
that the right-of-way easement covers/ allows the same uses as a utility easement. Don't
know what a right-of-way easement is without reading the dedication language.
A 15 foot general utility easement needs to be provided behind the row.
Number: 20 Created: 11 /26/2004
[12/28/04] It appears that this is being shown, but the easement area has two different
easement type labels. Clarify what this easement is. Label should read 20 foot access and
emergency access easement.
Need to dedicate an access easement across both lots from the access on Trilby to the
access on College.
Signature
Date ' t
CHECK HERE, IF YOU WISH TO RECEIVE COPIES OF REVISIONS
% Plat Site Drainage Report Other_
Utility Redline Utility Landscape
Page I
STAFF PROJECT REVIEW
Hunt Douglas Real Estate
c/o Dillon Tidwell
113 Coronado Court, A2
Fort Collins, CO. 80525
Dear Dillon,
Date: 1 /3/2005
Staff has reviewed your submittal for COLLEGE AND TRILBY SUBDIVISION -
PROJECT DEVELOPMENT/FINAL COMPLIANCE PLAN, and we offer the
following comments:
ISSUES:
Department: Engineering
Topic. General
Issue Contact: Sheri Wamhoff
Number: 16 Created: 11 /26/2004
[12/28/04] 1 have a call into Larimer County to check and see if this was
received and processed. Even if it has, it will probably work to show it being
dedicated on this plat. I received a call back from the County. The Right -Of -
Way (ROW) dedication documentation had not yet been filed, but they are
planning on processing it next week. Please contact Matt Lafferty with the
County if you have questions on that. Once the ROW is recorded it will not
need to be dedicated on this plat.
[original comment) I thought the ROW on Trilby Road was supposed to be
dedicated to Larimer County with the existing project. Was it not already
dedicated? If dedicated, this plat needs to note the Reception Number as
done with the ROW on South College Avenue and not include it in the platted
boundary. If it hasn't been it needs to indicate that the ROW is being
dedicated by this plat.
Page I
Number: 17 Created: 11 /26/2004
[12/28/04] 1 need to see a copy of the easement language for Reception
#2004-0044322 to verify that the "right-of-way easement" covers/allows
the same uses as a utility easement. Don't know what a "right-of-way
easement" is without reading the dedication language.
A 15 foot general utility easement needs to be provided behind the ROW.
Number: 20
Created: 11 /26/2004
[12/28/04] It appears that this is being shown, but the easement area has
two different easement type labels. Clarify what this easement is. Label
should read 20 foot access and emergency access easement.
[original comment] Need to dedicate an access easement across both lots
from the access on Trilby Road to the access on South College Avenue.
This development request (subdivision plat) is ready to be scheduled for an
administrative public hearing in front of a hearing officer. There is a required
notification letter that must go out to all Affected Property Owners within a
minimum of 500' of the property (in all 4 directions) and the letter must be
in the mail at least 2 weeks prior to the date of the public hearing; therefore,
the earliest that the hearing could be scheduled for is the week of January
17, 2005. We (the Current Planning Department) do have the mailing labels
needed to mail the notification letter.
If you have any questions regarding these issues or any other issues related
to this project, please feel free to call me at 221-6341.
Yours Truly,
z at /l
Steve Olt,
City Planner
Page 2
LM6MdN Project Comments Sheet
)IM Selected Departments
( 1€i 01 l.o i Yi11?t,-
Department: Engineering
Date: January 5, 2005
Project: COLLEGE AND TRILBY SUBDIVISION - FINAL PLANS
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting.
December 29, 2004
Note - Please identify your redlines for future reference
Issue Contact: Sheri Wamhoff
Topic: General
Number: 16 Created: 11 /26/2004
[12/28/041 1 have a call into the County to check and see if this was received and processed. Even if it has, it will
probably work to show it being dedicated on this plat. I received a call back from the County. The row dedication
documentation had not yet been filed, but they are planning on processing it next week. Please contact Matt
Lafferty with the County if you have questions on that. Once the row is recorded it will not need to be dedicated
on this plat.
I thought the row on Trilby was supposed to be dedicated to the County with the project. Was it not already
dedicated? If dedicated need to note reception number as did with row on College Ave and not include it in the
plated boundary. If it hasn't been it need to indicate that the row is being dedicated by this plat.
Number: 17 Created: 11/26/2004
[12128/04] 1 need to see a copy of the easement language for Rec # 2004-0044322 to verify that the right-of-way
easement covers/ allows the same uses as a utility easement. Don't know what a right-of-way easement is
without reading the dedication language.
A 15 foot general utility easement needs to be provided behind the row.
Number: 20 Created: 11 /26/2004
[12/28/04] It appears that this is being shown, but the easement area has two different easement type labels.
Clarify what this easement is. Label should read 20 foot access and emergency access easement.
Need to dedicate an access easement across both lots from the access on Trilby to the access on College.
Number: 26
Created: 1 /512005
[1/5/05] comments from Technical Services
Remove the C.O.L. from the beginning of the title on the plat.
Label what the off -site easement on the north is.
Reference recordation number of the trilby road dedication and do not show it being dedicated on this plat.
Signature
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other_
utility Redline Utility Landscape
Page I