Loading...
HomeMy WebLinkAboutTEFFT ACRES REPLAT OF LOT 9 - Filed CS-COMMENT SHEETS - 2005-07-25L911111111t — —I- Project Comments Sheet Lowe)Selected Departments City'of Fort('olfins Department: Engineering Date: March 17, 2003 Project: TEFFT ACRES, LOT 9 REPLAT - TYPE I (LUC) All comments must be received by Steve Olt in Current Planning, no later than the staff review meeting: March 26, 2003 Note - Please identify your redlines for future reference Issue Contact: Dave Stringer Topic: Plat Number: 3 Created: 3/17/2003 What are street names other then Moore Lane? Number: 4 Created: 3/17/2003 Is all of cul-de-sac existing? Appears some may be new. Needs to meet Poudre Fire Authority requirements for radii Number: 5 Created: 3/17/2003 Need to submit a variance request for not completing street improvements at this time to the City Engineer. Refer to LCUASS 1.9.4 Number: 6 Created: 3/17/2003 Developer is required to enter into a Development Agreement with the City for his obligation towards future street improvements to Moore Lane and Moffet Drive. Number: 7 Created: 3/17/2003 Need to dedicate easements as needed along all lot lines Number: 8 Created: 3/17/2003 Add note to plat that no access to lot 9A shall be taken from Moffet Drive Signature Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report Other_ Utility Redline Utility Landscape Page I