HomeMy WebLinkAboutSUNSTONE VILLAGE PUD SIXTH - Filed GC-GENERAL CORRESPONDENCE - 2005-07-19Develo• ent Services
Engineering Department
August 11, 1992
Land Development Services
309 West Harmony Road
Fort Collins, Co 80525
RE: Sunstone Village, 6th Filing
Dear Mr. Donovan:
This letter is to inform you that the utilities to include sanitary sewer and
water only, have been inspected and inspected and initially accepted by the City
of Fort Collins pending the normal contractor's warranty period.
Please be informed that this letter of acceptance does not relieve the developer
or the contractors, lot owners, or their contractors of their responsibility for
the repair of any damage which may occur as a result of the building
construction.
Sincerely,
54X
Lance Newlin
Engineering Construction Inspector
LN/ltg
cc: Schmidt Earth Builder, Inc.
621 Sherry Drive
Fort Collins, CO 80525
2S1 \orth Collei;e A%enue • P.O. Box ';80 • Fort Collins, CO 50522-0�;80 • (303) 221-660�
"hL&wtL,
DEC () : 1992
Ennineprinn Dept
November 30, 1992
David Stringer
Chief Construction Inspector
Engineering Department
City of Fort Collins
281 N. College Ave.
Fort Collins, CO 80524
RE: Sunstone Village PUD Subdivision
Dear Dave,
This letter is written to acknowledge that Geneva Homes, Inc. is committed
to completion of trickle storm drainage pans on the 6th and 5th Filing of the
referenced subdivision.
The contractor's cost for the improvements are as follows:
1. 250 feet of 2 foot wide pan at $5.50 per linear foot =
$1,375.
2. One each curb chase at $650.
We have provided an Erosion Control Bond for the 6th filing of Sunstone in
the amount of $3,108. All of the measures have been completed except a $200
sediment trap. The sediment trap, as well as the concrete pans are scheduled
for completion when weather and ground conditions allow.
We would like to continue to obtain building permits in the 6th filing as
buyers for our homes allow. Therefore, we respectfully request that you
place an additional constraint on our erosion control monies currently on
deposit that none of the security is eligible for release from your accounts
until the above mentioned drainage pan improvements have been completed.
If this arrangement is satisfactory with you, please so indicate by
initialing and returning a copy of this letter to our office. Please call
me at 225-9810 if further information is required.
Sincerely yours,
k'
Gary HmoVer -
Vice-eiresident
GH/jk
Commi ty Planning and Environmental
Engineering Department
City of Fort Collins
October 6, 1992
Geneva Homes, Inc.
344 E. Foothills Parkway
Fort Collins, Colorado 80525
RE: Sunstone 6th
To Whom It May Concern:
rvices
It is standard policy for the City of Fort Collins to accept for perpetual
maintenance those public right-of-way constructions which have been approved by
the City and which have passed all required guarantee periods.
This includes the water main, sanitary sewer mains, storm sewer lines and
facilities, street pavements, street lights, and street signs.
Based upon our limited inspection and to the best of knowledge the subdivision
improvements have also been constructed in accordance to City standards.
Sincerely,
-,,��,-fir
David Stringer
Chief Construction Inspector
DS/ltg
cc: Dennis L. Donovan
Sunstone 6th
'81 Vorth College Avenue • P.U. Boy 780 • Fort Collins, CO 80�2'-0580 • (303) '21-r,oc—