Loading...
HomeMy WebLinkAboutCAMBRIDGE PLACE PUD - Filed GC-GENERAL CORRESPONDENCE - 2008-04-17.. CITY OF FOF�r COLLINS 1"0 STORM WATER UTILITY September 13, 1984 Mr. Jack Nichol 2305 Brookwood Fort Collins, Colorado Re: Revised drainage plan for Cambridge Place P.U.D. Dear Mr. Nichol: Phil Robinson of James H. Stewart & Associates has redesigned the drainage plan for Cambridge Place P.U.D., which the City subsequently approved. I have enclosed a copy for your information. Phil's design calls for the existing 6-inch curbing to be replaced by 12-inch curbing, and the detention pond outlet to be through a 3-inch diameter pipe discharged at a point 20-feet west of the original release point. These revisions should alleviate your concerns. I have allowed the owner thirty (30) days to complete the reconstruction. Please feel free to call me if you have any questions. Sincerely, Michael H. Mercer Stormwater Utility Enclosure aw VAW I' r L-- '£1'^•OV�. Ei'IST 6'•/cRT cURr3 ._ A r � I �J1,> O.�p T)f_7. t CITY OF FOR"r COLLINS `4 STORM WATER UTILITY September 14, 1984 Mr. Gordon Murdoff 700 Cambridge Drive Fort Collins, Colorado 80525 Re: Revised drainage plan for Cambridge Place P.U.D. Dear Mr. Murdoff: Phil Robinson's redesign of the drainage plan for Cambridge Place P.U.D. has been approved by the City. It should also alleviate the concerns expressed by Mr. Nichol. The reconstruction must be completed within thirty (30) days of this date. A letter from Phil Robinson verifying that the actual construction matches his design will also be needed at that time. Please let me know if you have any questions, and thanks for your cooperation. Sincerely, Michael H. Mercer Stormwater Utility Engineering Services -,--....,,.-.-..-,— nor-L-re v c.. -i.- y- � -iuiu �u$P a, �uwui nVV VUJCC-IOUJI CC 1-000J Llr James H. Stewart and Associates, Inc. Consulting Engineers and Surveyors 214 North Howes Street P.O. Box 429 Fort Collins, Colorado 80522 (303) 482-9331 October 1, 1984 Mr. Michael H. Mercer Stormwater Utility Engineering Services City of Fort Collins Fort Collins, CO 80522 Dear Michael: Re: Cambridge Place P.U.D. Laboratory: 301 Lincoln Court P.O. Box 429 Fort Collins, Colorado 80522 (303)484-6309 I checked the storm drainage detention area at Cambridge Place P.U.D., and found it to be constructed as per the approved plan. The outflow pipe has been extended to the west to comply with the outlet location shown on the plan, and the bar grate over the pipe inlet has been cut down to allow the correct amount of flow. Sincerely, JAMES H. STEWART AND ASSOCIATES, INC. Phillip Robinson, P.E. Senior Vice President PIR/dm cc: Gordon Murdoff VON F'�C 's b � o A ., N SOON O`v