Loading...
HomeMy WebLinkAboutSUNSTONE MIXED USE - Filed DCP-DEV. CONSTRUCTION PERMIT - 2005-07-19i iiy of fort Collins Transportation Services 1_n ,iuecring Department City of Fort Collins, Colorado DEVELOPMENT CONSTRUCTION PERMIT Permit Number: ? -1 `� Issuance Date: Project Name: Sunstone Mixed Use Project A. K.A.: Project Location: NE Corner of Timberline Road and Caribou Drive Perntittee: Jonathan Cairns, Hartford Commercial Construction, Inc, 970-674-1109 City and developer contacts: See attached Exhibit `A' for nantes and phone numbers of all contact persons for this project. Fees: Permit Application Fee ($300 00) $ paid Construction Inspection Fee (paid prior to issuance of this permit) $ 11627.20 Total S 12,627.20 Development Bond or other approved security: Amount o!'sccurit} deposited with the City to guarantee the completion of all public mprovements to be constructed as shown on the approved plans for the development. $ 363' 898.80 Form of sccurity deposited with the City._ PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittce shall be responsible to requite their Project Lninecr to incorporate into all design dray,-;ngs and specifications the certification of all materials testing by an Engineer. 'File Pcrmittec 4,all have an Engineer prepare revised desk -pi drawings and secure City approval for all rcvtsions to the I ltilit-v Plans and reiated dOCl:nlentS The Pcrmittee shall have an Fri-ineer represent, as required by the City :n tho Development Agreement. that the improvements are constructed in contormaoec with the approved Utihiy Plans and the standards and specifications of the City. Fhc Perntittee shall provide "as -constructed" plans prepared by an Engineer prior to the Cit�'s acceptance of the constructed public improvem(,'nts. tAlt references aboec to the terms "Project Ent,incer- and " htwincer" snail mca❑ a Professional Engineer licensed in Colorado.) 2 All contractors who perform work on this project must be horded and licensed in conlormance with City requirements. _ � �• P.O.Box.780 • FortCollin5,' 080522-0. 80 • i97o)221-660., • FAX (970)221-637R www.fcgov coin Payment Request HARTFORD CONSTRUCTION CORP. PAYMENT REQUEST — Payable to: — [Address ame Z 4._ c w ti� Date J ) Requested by ity State ZIP Check released hone --- — — by: � C' I 3. Construction time restrictions: N/A 4_ The applicant understands that additional permits may be required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study_ drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the permit fee paid for this permit, whereupon the applicant must re -apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply [or an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permit; and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29-678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. Ifthe Development Agreement does not specify times for completion of public improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction ofall improvements shall be required prior to the time of issuance of the first building permit . 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City ; (2) punch list items from the final inspection are completed and accepted by the City; (3) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans; and (4) the 'as -constructed' plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.] (C)(2), and 3.3.2(C) of the Land Use Code, as applicable. Page 2 of 5 10. The City Erosion Control Inspector must be notified at least twenty four (24) hours prior to any planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP's) that can be installed prior to construction must be in place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. 11. No work (including grading) shall be started in State Highway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: No pavement impact fee will be charged provided the notes on the utilitv Mans are followed to mill and inlay 2 inches on the adjacent streets. Permittec's acknowledgment signature: By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as dchncd in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority. I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary. to enter upon such property to perlorm work required of the applicant if the applicant were to fail to perform the required work. 1 also acknowledge that l have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditions so stated in this permit. Applicant/Project Manager's Signature:,- y. / Date: l - Approval for issuance: City Engineer Approval ! �- ! it v - Date: q11 (PermitIssuc Dale) Page 3 of 5 EXHIBIT `A' DEVELOPMENT PROJECT CONTACT PERSONS Project Name: Sunstone Mixed Use Project A.K.A.: Name, address and numbers City Staff Contact Persons: Development Engineer: Sheri Wamhoff 281 N. College Avenue, Fort Collins, Co 80524 (970) 22 1 -675 0 x7140 Construction Inspector: Jeff Baldwin 281 N. College Avenue, Fort Collins, Co 80524 (970)221-6605 Cell (970) 218-2157 Current Planner: Cameron Gloss 281 N. College Avenue, Fort Collins, Co 80524 (970)221-6750 Water Utilities Engineer: Roger Buffington 700 Wood Street, Fort Collins, Co 80521 (970)221-6681 Erosion Control Inspector: Bob Zackley 700 Wood Street, Fort Collins, Co 80521 (970)224-6063 Natural Resources: Doug Moore 281 N. College Avenue, Fort Collins, Co 80524 (970)221-6143 Traffic Operations: Eric Bracke 625 Ninth Street, Fort Collins, Co 80524 (970)224-6062 Street closures: Syl Mireles 625 Ninth Street, Fort Collins, Co 80524 (970)221-6815 Transportation Planning: Kathleen Reavis 215 N. Mason St., Fort Collins, Co 80524 (970) 224-6140 Page 4 of 5 Forestry: Tim Buchanan 215 N. Mason St., Fort Collins, Co 80524 (970) 221-6361 Light and Power: Janet McTague 700 Wood Street, Fort Collins, Co 80521 (970)221-6154 Developer's Contact Persons: Project Manager: Jonathan Cairns Hartford Commercial Construction, Inc. 1218 W. Ash Suite H, Windsor, Co 80550 (970)674-1109 Cell (970) 690-3901 Fax (970) 674-5075 ionathan ,hartfordco.com Developer/Owner: Gary Hoover Sunstone Office Park LLC 1218 W. Ash Suite A Windsor, Co 80550 (970)674-1109 Cell (970) 690-3901 Fax (970) 674-5075 Project Engineer: Chris Carlson, Ayres Associates 3665 JFK Pkv y Building 2, Suite 200, Fort Collins, Co 8052 (970)223-5556 Cell (970) Fax (970) 223-5578 General Contractor: Trace Musgrave, Connell Resources, Inc. 4305 E. Harmony Road, Fort Collins, Co 80528 (970)223-3151 Cell (970) 567-5122 Fax (970)223-3191 tmus�rave(cFconnel lresources.com Architect/Planner: Kent Bruxvoort, P.E., Jim Sell Design 153 W. Mountain Ave., Fort Collins, Co 80521 (970) 484-1921 Cell (970) 420-0141 Fax (970) 484-2443 kemb a jimselldesign.com Page 5 of 5 it IIIit � »// 4lI•!!| .§ _ ..�1,,�.!•, |• | ,� |• | |�! ° l H W a W a w U. I r .ter. ii v���✓i�r Vl.� L� �V J.. L� �i ili o o cd Co 8 S 8 o 0 NDCi y q 1� pN tdN� fwV O _N tlJ eN� tpO O O 00 m It'�V N N fV tl9 Y4� g w w H t9 H M» H H~ Vf H H w tlS CDM8n8o C5 o m 001 tl% H 0000Ln n vHHrn_�m [Y w w 0 0 o a o 00 S o o 0 �H m�cm ri w .- M tlf tl a xx JJUU W LJ g000000coo ttppm0000000 o, N i+Nl np M W Y~! N H w a� ggQQg��®oog oot�+�o WHN�I]Yf mj p�p aq w wHHw r{ m G� W N tl f� O OD N y T LL LL LL 4 J JJKW Q W:i1 Li W 3 e w o c � � L U v a ^ T U �moo�a�oo 99w 6c tea% goor8000 00 coo �yy�'jj mM hS QBrn�'a v°no$gx$ rmrpp m va Yf O Y7 pj C!�HWH.02 W H .-0000pop0 L6 C4 tl 07 0�i �n m N Yti LL u. LL u. J tq _.iJJvj Vj U +t. 2� C b 9 m�N W f0'. f a F w pI �w a =� it Oyo\��IV LOTCAPITAL T CORPORATION November 12, 2003 City of Fort Collins. Engineering Department 281 North College Fort Collins, Colorado 80521 Dear Sirs: We hereby establish, at the request and for the account of Sunstone Office Park, LLC in your favor as beneficiary, our Irrevocable Letter of Credit No. SOP,LOC#1511, in the amount of Three Hundred Sixty Three Thousand Eight Hundred Ninety-eight & 80/100s Dollars ($363,898.80) (as more fully described below), effective immediately and expiring at the close ofbanking husiness on November 11, 2004, at our office at 1204 W. Ash St., Suite A, Windsor, CO 80550. This Letter of Credit is intended for the funding required for the Sunstone Mixed Use PDP Development Project ("Development Project') for the assurance of the completion of the construction and the maintenance and repair of the public infrastructure in connection with the aforesaid development project and its associated development agreement and development construction permit. Funds under this Letter of Credit are available to you for one or more drawings prior to the close of business on November 11, 2004, against sight drafts in an aac egate cumulative amount not to exceed $363.898.80. dated the date of presentment, drawn on our office referred to above, referring thereon to the number ofthis Letter of Credit and accompanied by your written certificate si?ned by you and acknowledged as therein provided in the form of Exhibit I hereto. Presentation of such draft and certificate shall be made at our office referred to above. Upon the earlier of (i) our honoring your draft(s) totaling 8363,898.80 in the aggregate presented on or before this Letter of Credit expires pursuant to the terms herein or (it) the surrender to us by you of this Letter of Credit for cancellation, this Letter of Credit shall automatically terminate. It is understood that the amount of this Letter of Credit may be reduced as public improvements are constructed and accepted by the City. As components of the infrastructure are satisfactorily completed in accordance with approved utility plans. the value of the completed components may be established tiom the Development Construction Permit worksheet for determining costs of infrastructure construction and inspection fees, whereupon the amount of this letter of credit may be reduced by the value of the completed component(s), upon execution of a "Request for Amendment to Letter of Credit" in the form attached hereto as Exhibit 2 . This letter of credit shall be subject to the Uniform Commercial Cod tW., hfate ofColorado, and_ to the extent not inconsistent with the terms of this Lett he Uridbrin 120� West Ash Street, Suite A ♦ `Nindscr, .olorsac 30550 ♦ (97C] 886-7800 7sx 970i 896-7C0� -- � @ _- � _ � � ._�- Cv v �. � � � � w, r �� T � r 1�.���. �. ^, o � , � -� I/ �1 �