HomeMy WebLinkAboutPROSPECT INDUSTRIAL PARK LOT 6 - Filed CS-COMMENT SHEETS - 2008-02-25T Selected Issues Report
City of Fort Collins
2/7/2008 Date:
LIBERTY COMMON SCHOOL ADDITION SITE PLAN ADVISORY
REVIEW
SELECTION CRITERIA: Status = All
ISSUES:
Department: Engineering Issue Contact: Sheri Langenberger
Topic: General
Number:12 Created:3/13/2002 Pending
The legal description reference does not reference the most current plat. The most current
plat is Vipont at Prospect Park East being a replat of Lot 8, Prospect Park East PUD, and
Lots 1, 2, and a part of Lot 23, Prospect Industrial Park.
Number:13 Created:3/13/2002 Pending
The connection of March Court out to Midpoint Drive is a highly desired connection and is
needed in order to help the traffic congestion associated with the school use and for general
circulation in the area. The problems this site experiences with the drop off and pick up of
children will get worse once the parking is eliminated off of Sharp Point Drive. We would like
to see the dedication of right-of-way across this property for the future extension.
Number:14 Created: 3/1312002 Pending
Will need a street cut permit for the work in the row.
Number:15 Created: 3/1312002 Pending
Need to dedicate easements for the detention pond and water quality area.
Number:16 Created:3/13/2002 Pending
Need a set of Utility plans for approval. The Color erosion control plan is nice, but will not
have the same look when printed on a mylar and reproduced. The utility plans need to have
a cover sheet with General Notes and all applicable construction notes, contain a grading
plan, and City signature blocks.
Number:17 Created:311312002 Pending
Provide curb gutter and sidewalk detail in the plan set. Will need to repair and/or replace all
damage curb gutter and walk.
Department: Transportation Planning Issue Contact: Tom Reiff
Topic: General
Number:10 Created:3112/2002 Pending
Identify and label event parking locations and how people will access the facility from their
car. (i.e. walkways, location of gates, etc...)
Number:11 Created:3/12/2002 Pending
Provide and label bike parking location.
Page 1
PROJECT
COMMENT SHEET
Current Planning
DATE: February 27, 2002 TO: Engineering Pavement
PROJECT: #11-02 Liberty Common School Addition — Site Plan
Advisory Review - Type II (LUC)
All comments must be received by Bob Barkeen no later than the staff
review meeting:
March 13, 2002
Note - Please identify your redlines for future reference
VC' CenV&-;,w ,�,7—
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_Plat _Site _Drainage Report _Other
_Utility _Redline Utility _Landscape
City of Fort Collins
PROJECT
COMMENT SHEET
Current Plannine
DATE: February 27, 2002 TO: Street Oversizing
PROJECT: #11-02 Liberty Common School Addition — Site Plan
Advisory Review - Type II (LUC)
All comments must be received by Bob Barkeen no later than the staff
review meeting:
March 13, 2002
Note - Please identify your redlines for future reference
O 4,e4,5 v, 3 lee S G A--e du i 1-1/ o u I s S cic�"ec
CHECK HERE IF YOIWWISH TO RECEIVE COPIES OF REVISIONS
_Plat _Site _Drainage Report _Other
_Utility _Redline Utility _Landscape
PROJECT
COMMENT SHEET
Current Plannine
DATE: February 27, 2002 TO: Technical Services
PROJECT: #11-02 Liberty Common School Addition — Site Plan
Advisory Review - Type II (LUC)
All comments must be received by Bob Barkeen no later than the staff
review meeting:
March 13, 2002
Note - Please identify vour redlines for future reference
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_Plat _Site _Drainage Report _Other
_Utility _Redline Utility _Landscape