Loading...
HomeMy WebLinkAboutPROSPECT INDUSTRIAL PARK LOT 6 - Filed CS-COMMENT SHEETS - 2008-02-25T Selected Issues Report City of Fort Collins 2/7/2008 Date: LIBERTY COMMON SCHOOL ADDITION SITE PLAN ADVISORY REVIEW SELECTION CRITERIA: Status = All ISSUES: Department: Engineering Issue Contact: Sheri Langenberger Topic: General Number:12 Created:3/13/2002 Pending The legal description reference does not reference the most current plat. The most current plat is Vipont at Prospect Park East being a replat of Lot 8, Prospect Park East PUD, and Lots 1, 2, and a part of Lot 23, Prospect Industrial Park. Number:13 Created:3/13/2002 Pending The connection of March Court out to Midpoint Drive is a highly desired connection and is needed in order to help the traffic congestion associated with the school use and for general circulation in the area. The problems this site experiences with the drop off and pick up of children will get worse once the parking is eliminated off of Sharp Point Drive. We would like to see the dedication of right-of-way across this property for the future extension. Number:14 Created: 3/1312002 Pending Will need a street cut permit for the work in the row. Number:15 Created: 3/1312002 Pending Need to dedicate easements for the detention pond and water quality area. Number:16 Created:3/13/2002 Pending Need a set of Utility plans for approval. The Color erosion control plan is nice, but will not have the same look when printed on a mylar and reproduced. The utility plans need to have a cover sheet with General Notes and all applicable construction notes, contain a grading plan, and City signature blocks. Number:17 Created:311312002 Pending Provide curb gutter and sidewalk detail in the plan set. Will need to repair and/or replace all damage curb gutter and walk. Department: Transportation Planning Issue Contact: Tom Reiff Topic: General Number:10 Created:3112/2002 Pending Identify and label event parking locations and how people will access the facility from their car. (i.e. walkways, location of gates, etc...) Number:11 Created:3/12/2002 Pending Provide and label bike parking location. Page 1 PROJECT COMMENT SHEET Current Planning DATE: February 27, 2002 TO: Engineering Pavement PROJECT: #11-02 Liberty Common School Addition — Site Plan Advisory Review - Type II (LUC) All comments must be received by Bob Barkeen no later than the staff review meeting: March 13, 2002 Note - Please identify your redlines for future reference VC' CenV&-;,w ,�,7— Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat _Site _Drainage Report _Other _Utility _Redline Utility _Landscape City of Fort Collins PROJECT COMMENT SHEET Current Plannine DATE: February 27, 2002 TO: Street Oversizing PROJECT: #11-02 Liberty Common School Addition — Site Plan Advisory Review - Type II (LUC) All comments must be received by Bob Barkeen no later than the staff review meeting: March 13, 2002 Note - Please identify your redlines for future reference O 4,e4,5 v, 3 lee S G A--e du i 1-1/ o u I s S cic�"ec CHECK HERE IF YOIWWISH TO RECEIVE COPIES OF REVISIONS _Plat _Site _Drainage Report _Other _Utility _Redline Utility _Landscape PROJECT COMMENT SHEET Current Plannine DATE: February 27, 2002 TO: Technical Services PROJECT: #11-02 Liberty Common School Addition — Site Plan Advisory Review - Type II (LUC) All comments must be received by Bob Barkeen no later than the staff review meeting: March 13, 2002 Note - Please identify vour redlines for future reference Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat _Site _Drainage Report _Other _Utility _Redline Utility _Landscape