SPRING COURT - Filed CS-COMMENT SHEETS - 2005-07-11
DATE: February 18, 1998 DEPT: Engineering PROJECT: Spring Ct. Subdivision / Ft. Collins Muffler PLANNER: ]Leanne Harter ENGINEER: Michael Coley Utility Plans: Sheet 2: * The waterline work underneath Spring Court will necessitate an asphalt patch as well as some replacement of curb, gutter and sidewalk. Please show patching limits and portions of curb, gutter and sidewalk to be replaced. * If the tapping saddle installation on the west side of Spring Court is not within the ROW, than a temporary construction easement will be needed. * Show portions of curb, gutter and sidewalk to be replaced along Johnson Drive due to storm drainage inlet construction. * Note "Drainage and Utility Easement by seperate document" for new easement on the existing F.C. Muffler Lot. >k Please submit dedication deeds for all new dedications. You have already provided deeds for ROW dedication and drainage easement'C'. ** Gee redline plans for additional comments ** Date: z— / Z. 3 � `� 8 Signature: _ Please send copies of marked revisions _Plat Site �X Utility _Landscape City of Fort Collins i PROJECT COMMENT SHEET City of Fort Collins Current DATE: 16 December, 1997 DEPT: Engineering PROJECT: #24-97 Spring Ct. Sub., F.C. Muffler Type I PDP/FC ENGINEER: Michael Coley No Problems Problems or Concerns (see below or attached) Utility Plans Sheet 2: 39 Please dedicate a utility esmt. for the sanitary sewer on existing FC Muffler lot. Though this cannot be required with the proposed development on lots 9 and 10, this dedication would benifit the water/wastewater utility in the event that any maintainance work had to be done on the sewer line. S- *-8B 17' parking stalls are acceptable provided that T of overhang is allowed for in the design of the adjacent sidewalk. =X Provide profiles of all new storm sewer lines. < a ji-1 P r` t s C- k L i-58 There seems to be a conflict with the proposed sidewalk (?) Adjacent to the parking and the steps shown on the plan. r f"X Make sure that there is an ADA compliant route for a handicapped motorist to get from the: parking stall provided to the waiting room. £- N Dedicate: a drainage/utility easement that encompasses new stormwater facilities (on the existing FC Muffler lot). -) - t,, N Please provide a bike rack for employees. Easement/RONV dedication deed 39 Please seperate the ROW dedication from the esmt. dedication and use the format of the examples I have provided. Date: 1 Z / 1 io /g "7 Signature: PLEASE SEND COPIES OF MARKED REVISIONS: ❑ PLAT , © I SITE UTILITY ❑ LANDSCAPE PROJECT COMMENT SHEET City of Fort Collins Current DATE: 26 September, 1997 DEPT: Engineering PROTECT: 424-97 Spring Court Subdivision, Fort Collins Muffler PLANNER: Leanne Harter ENGINEER: Michael Coley All comments must be received by: 9/24/97 No Problems Problems or Concerns (see below or attached) Utility Pans Sheet 1: • Some minor modifications to the General Notes are needed. • A copy of the plat should be included with the Utility Plans. Sheet 2: • Show the sanitary sewer easement. • The `Final Development Plan' shows a 6' rear lot utility easement. Show all existing easements. • Show all easements and right-of-way lines. If adequate ROW has not already been dedicated for Spring Court and Johnson Drive, then it should be with this development. Final Development Plan Sheet 1: • Sanitary sewer and water service locations are inconsitant with utility plan. • Structures, such as trash enclosures, are not permitted within easements. ** See redline plans for additional comments ** Date: Z9 /C1 7 Signature: PLEASE SEND COPIES OF MARKED REVISIONS: ®' PLA ® SITE Ea UTILITY ® LANDSCAPE