Loading...
HomeMy WebLinkAboutSOUTH GLEN PUD FIFTH - Filed CS-COMMENT SHEETS - 2005-07-08PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE:10-7-96 DEPT: ENGINEERING PROJECT: South Glen P.U.D. 5th Filing PLANNER: Steve Olt All comments must be received by: No Problems Problems or Concerns (see below or attached) I Please provide complete curve data for all curves on the Plat. 2 Restate "to be; replaced" easement language as shown on the Plat. Date: '< Signature:,' � - / I- / PLEASE SEND COPIES OF MARKED REVISIONS: 0 PLAT [3 SITE 0 UTILITY 0 "LANDSCAPE PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: May 20, 1996 DEPT: Engineering - Ping PROJECT: South Glen PUD, 5th Filing - Final PLANNER: -'S4e ve- o (-I' All comments must be received by: May 31, 1996 ❑ No Problems [Problems or Concerns (see below or attached) • SITE PLAN 1. Show utility easements • COVER SHT. 1. Per Roger Buffington of City Water/Wastewater Dept., this site will be served by the City. Please correct General Note #1 and #12. • PLAT 1. Please label, define and delineate the Tracts. • UTILITY PLAN 1. Please show planned entrance configuration and a detail. See other comments on the plans. Date: 4, Signature:Z� � CHECK IF YOU WISH TO RECEIVE a' PLAT COPIES OF REVISIONS Q`SITE COY LANDSCAPE [a,. -UTILITY