Loading...
HomeMy WebLinkAboutSILVERPLUME ESTATES THIRD - Filed GC-GENERAL CORRESPONDENCE - 2005-06-28Develop nt Services Engineering Department June 17, 1991 Mr. Larry Odau P. 0. Box 1149 Fort Collins, CO 80522 RE: Silverplume 3rd Filing - Warranty Work Dear Larry: This letter is a follow up to our conversation last week concerning the infra red repairs on three street patches made over water line repairs covered by warranty. As we discussed, you or the utility contractor will be required to make these repairs on the three locations mentioned above in Silverplume Drive to satisfy the utility warranty requirements for the Silverplume Subdivision 3rd Filing. It has come to my attention that an area inlet at the north east corner of Swallow and Dunbar on Dunbar has problems with spalling and breakage in the gutter section. This will have to be repaired and falls under the warranty for street construction. If you have any questions, please feel free to contact me. Sincerely Steve M. Biegler Construction Inspector SMB/ltg 281 North College ANenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6605 Developrr t Services Engineering Department City of Fort Collins October 15, 1990 Gene Hurrpries First Colorado Lending 375 East Horsetooth Road Fort Collins, Colorado 80525 IIMIMrwSam01 FAIMO TH40--.F. RE: Silverplume Estates, 3rd Filing P.U.D. The City of Fort Collins accepts for perpetual maintenance those public right-of-way constructions which have been initially inspected and approved by the City pending all required guarantee periods. This includes the water main, sanitary sewer mains, storm sewer lines, facilities and street pavements. Yours truly, David Stringer Chief Construction Inspector 300 LaPorte Avenue • P.O. Box 580 • Fort Collins, CO 80�22-0�;80 • (303) 221-660;