HomeMy WebLinkAboutBLOCK 6 320 NORTH COLLEGE AVENUE SCHRADER OIL COMPANY - Filed CS-COMMENT SHEETS - 2005-06-24City of Fort Collins
Current
PROJECT
COMMENT SHEET
Building Permit Review
DATE:July 26, 1999 DEPT:Engineering
PROJECT: Schrader Oil Scout Station
320 N College Ave - Rehab of existing C-store, demo exist
restraunt, build car wash
Building Permit Review (old use -by -right)
PLANNER: Peter Barnes, Zoning
ENGINEER: Sheri Wamhoff
All comments must be received by: August 11, 1999
11 Schrader Oil Scout Station
August 9, 1999
?4?p Need signed easements for the waterline and sewer line connection. I need these documents
kJ -<,? before we can sign the mylars.
lrl)The eastern access onto willow, per the stationing, is shown to be 55 feet in width. This is
greater than the approved width of 45 feet. Variance for width of this access point was granted.
A letter will follow.
Ne 11 A vertical curve is needed on Willow for the future design. Please show this.
Nii 11 Add the word "min' to saw cut dimension on the detail sheet.
Date: rSignature:__
Check here if you wish to receive copies of revisions
Plat _ Site _ Drainage Report _ Other:
_ Utility _ Landscape _ Redline Utility
City of Fort Collins
Current
PROJECT
COMMENT SHEET
Building Permit Review
DATE: May 24, 1999 DEPT: Engineering
PROJECT: Schrader Oil Scout Station
320 N College Ave - Rehab of existing C-store, demo exist
restraunt, build car wash
Building Permit Review (old use -by -right)
PLANNER: Peter Barnes, Zoning
ENGINEER: Sheri Wamhoff
All comments must be received by: June 9, 1998
Schrader Oil Scout Station
June 14, 1999
• Modify general notes to reference "City Engineer" and not "Director of Engineering"
• See comments on Sheet 4
• Need to change label for the width of the pavement patch to 6 feet and indicate that the patch
is to be in accordance with City of Fort Collins Street Repair and Reconstruction Standards
and Guidelines.
• The ramp on willow adjacent to the concrete also needs to have a 1:12 slope to meet ADA
requirements.
• The street design for willow does not meet requirements, revise to meet standards.
Provided is a Development Construction Permit Application, the application needs to be filled
out and returned with all the applicable attachments before a meeting can be scheduled.
Information for Development Agreements sheet has been provided - this needs to be filled out
and returned.
r
Date: ' `�'�`` Signature:`
Check here if you wish to receive copies of revisions
Plat Site Drainage Report _Other:
�Utility ,Landscape _Redline Utility
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: February 4, 1999 DEPT: ENGINEERING
PROJECT: Schrader Oil Station
320 N. College Ave.
Rehab of existing c-store, demo exist restrant, build car wash
Bui ng Permit Review (old use -by -right)
PLANNER: Peter Barnes, Zoning
ENGINEER: Sheri Wamhoff
All comments must be received by: February 25, 1999
North College Avenue Schrader Oil Company /Wz) February 22, 1999
Site/Landscape Plan
Ser -7 Z p,u S FOB, GammEA/TS
Utility Plans
• As noted on the previous submittal, provide a soils report for Willow Street.
• As noted on the previous submittal, provide details for the following: Sidewalk detail;
Handicap ramp detail; Additions to existing walk detail
• Revise the Driveway cut detail in accordance with Design and Construction Criteria, Standards
and Specifications for Streets, Sidewalks, Alleys and Other Public Ways Standard Drawing
D-15.
• Multiple inflow and outflow vertical curb and gutter details were provided. Revise these details
to be in accordance with Design and Construction Criteria, Standards and Specifications for
Street, Sidewalks, Alleys and Other Public Ways Standard Drawing D-11.
• Provide a street striping sheet for College Drive and Willow Street.
Date: Signature
PLEASE SEND COPIES OF MARKED REVISIONS: Pleyr
[r SITE
UTILITY
E[' LANDSCAPE
North College Avenue Schrader Oil Company (sheet 2 of 2) March 1, 1999
• Will need to work with CDOT for a state highway access permit for this site.
• Need an off -site easement for removal of asphalt south of the property line.
• Provide a recorded copy of the access easement across the site.
• The first two parking stall closest to Willow will need to be eliminated. A minimum 50 foot
set back is required for parking off of a collector.
• Provide a variance request for having a driveway wider than allowed in the standards.
• Show and label the future walk in the northeast corner.
• Provide additional cross sections for Willow ( add slopes to existing one) The pavement cut
will have to occur at least 8 feet from the flowline as longitudinal joints are not allowed in
bike lanes of in wheel paths.
• Show what pavement is to be added on the north side of Willow. Additional pavement is
needed to accommodate the striping plan.
• On the profile - indicate what grade is being tied into. Provide a preliminary design to the
east for 500 feet. Show the design for the north side of the street also. How do we know the
grades work if we can not see that the requirements will be met for the entire street.
• See Plans for additional comments.
City of Fort Collins
Current Plannint
PROJECT
COMMENT SHEET
Building Permit Review
DATE: August 24, 1998 DEPT: Engineering
PROJECT: Schrader Oil Scout Station
320 N. College Ave.
Rehab of exist c-store, demo exist restrant, build car wash
Building Permit Review (old use -by -right)
PLANNER: Peter Barnes, Zoning
ENGINEER: Sheri Wamhoff
All comments must be received by: September 18, 1998
North College Avenue Schrader Oil Company September 28, 1998
Site/Landscape Plan
• Show improvements to Willow Street. Define curb cuts, provide detached sidewalk.
• Provide bike parking at the front of the building
• A right turn lane is really needed on College Ave. We would like it if you would move the
curb over to accommodate this.
• Narrow the southern curb cut. Make it 30 feet like the northern access point is. Make
improvements along College Ave here.
• Widen the sidewalk on college Ave to meet the min - 4.5 feet.
Utility Plans
• Improvements to Willow Street need to be made. Curb cuts need to be defined and the street
designed.
• Provide all off -site easements needed for construction. Provide on -site easements for utilities
as needed.
• Reduce the width of the southern access to 30 feet in width (on College) and provide
improvements along the frontage here.
• The sewer connection is being shown under the railroad tracks. This may be difficult to do.
A permit from the railroad will probably be required. May want to consider how you are
proposing to make these connections, since this is the truck route and College Ave I do not
know what type of road closures will be allowed.
(Continued on next page
Date: 9 L'4L'L Signature�L Zz,�tD
Check here if you wish to receive copies of revisions
i Plat X Site _ rt _ Other:
x_utility Landscape Redline Utility
North College Avenue Schrader Oil Company (page 2 of 2) September 28, 1998
• Show the patching areas in College Avenue
• Show the limits of the median that exists in College Ave,.
• The sidewalk on College Avenue needs to be widen to the min sidewalk width of 4.5 feet.
• A right turn lane is really needed on College avenue. We would like it if you would move the
curb over to accommodate it.
• A State Highway .Access Permit may be needed.
• Show all improvements being done.
• Provide details_ Curb, gutter, and sidewalk detail; Handicap ramp detail; Driveway cut detail;
Additions to existing walk detail
• Provide a soils report for Willow Street.
City of Fort Collins
Current Planning
PROJECT
COMMENT SHEET
Building Permit Review
DATE: August 24, 1998 DEPT: Engineering
PROJECT: Schrader Oil Scout Station
320 N. College Ave.
Rehab of exist c-store, demo exist restrant, build car wash
Building Permit Review (old use -by -right)
PLANNER: Peter Barnes, Zoning
ENGINEER: Sheri Wamhoff
All comments must be received by: September 18, 1998
North College Avenue Schrader Oil Company September 28, 1998
Site/Landscape Plan
• Show improvements to Willow Street. Define curb cuts, provide detached sidewalk.
• Provide bike parking at the front of the building
• A right turn lane is really needed on College Ave. We would like it if you would move the
curb over to accommodate this.
• Narrow the southern curb cut. Make it 30 feet like the northern access point is. Make
improvements along College Ave here.
• Widen the sidewalk on college Ave to meet the min - 4.5 feet.
Utility Plans
• Improvements to Willow Street need to be made. Curb cuts need to be defined and the street
designed.
• Provide all off -site easements needed for construction. Provide on -site easements for utilities
as needed.
• Reduce the width of the southern access to 30 feet in width (on College) and provide
improvements along the frontage here.
• The sewer connection is being shown under the railroad tracks. This may be difficult to do.
A permit from the, railroad will probably be required. May want to consider how you are
proposing to make these connections, since this is the truck route and College Ave I do not
know what type of road closures will be allowed.
(Continued on next page 9
Date: y '' Signatures
Check here if you wish to receive copies of revisions
,X Plat X Site _ �crrt _ Other:
KUtility Landscape Redline Utility
North College Avenue Schrader Oil Company (page 2 of 2) September 28, 1998
• Show the patching areas in College Avenue
• Show the limits of the median that exists in College Ave,.
• The sidewalk on College Avenue needs to be widen to the min sidewalk width of 4.5 feet.
• A right turn lane is really needed on College avenue. We would like it if you would move the
curb over to accommodate it.
• A State Highway Access Permit may be needed.
• Show all improvements being done.
• Provide details: Curb, gutter, and sidewalk detail; Handicap ramp detail; Driveway cut detail;
Additions to existing walk detail
• Provide a soils report for Willow Street.
City of Fort Collins
Current
PROJECT
COMMENT SHEET
Building Permit Review
DATE:July 26, 1999 DEPT:Engineering
PROJECT: Schrader Oil Scout Station
320 N College Ave - Rehab of existing C-store, demo exist
restraunt, build car wash
Building Permit Review (old use -by -right)
PLANNER: Peter Barnes, Zoning
ENGINEER: Sheri Wamhoff
All comments must be received by: August 11, 1999
Schrader Oil Scout Station
August 9, 1999
Need signed easements for the waterline and sewer line connection. I need these documents
before we can sign the mylars.
The eastern access onto willow, per the stationing, is shown to be 55 feet in width. This is
greater than the approved width of 45 feet. Variance for width of this access point was granted.
A letter will follow.
A vertical curve is needed on Willow for the future design. Please show this.
Add the word "mid' to saw cut dimension on the detail sheet.
Date: Signature: -
Check here if you wish to receive copies of revisions
Plat _ Site _ Drainage Report _ Other:
Utility _ Landscape _ Redline Utility