Loading...
HomeMy WebLinkAboutSCENIC VIEWS PUD - Filed GC-GENERAL CORRESPONDENCE - 2005-06-23Transporti—on Services Engineering Department City of Fort Collins February 25, 1998 Karl Nyquist 1777 S. Harrison St., Suite 908 Denver, Co. 80210 Subject: Scenic Views P.U.D. construction plan approval Dear Mr. Nyquist: This letter is in response to your request concerning the status of the City signing the final construction plans fir the above mentioned project. It is standard policy for the City Engineering Department to perform the final signing of a projects mylar drawings for construction plan approval once the other City departments ( ie. Water, Sewer and Stormwater, and other impacted parties ) have signed the mylars, prior to our signature. We have received a memo from Bill Veio on what has been changed on the mylar since our last review and are in agreement with these revisions as stated in the memo.. As long as these are the only changes, we are ready to sign the construction plan mylars but do need enough time to take another look at the plans to verify that the changes have been made and are accurate. As I stated previously Engineering is the last signer of the mylar plans and will not sign until all of the other required signatures have been obtained. In addition, once the mylar plans have been signed by us, we require a copy ofthe mylar plans, and 4 copies ofblueline drawings that must be stamped and signed by the design engineer of the project. These copies are then returned to our department for our use. Sincerely, ` —David Stringer Development Review Supervisor 281 North Collt,c,c N enue • P.O. Boy 580 • Fort Collins, CO 80522-0580 • (970) 21-6605 Transpo,,ition Services Engineering Department City of Fort Collins November 17, 1997 Bill Veio Rocky Mountain Research Institute 6645 East Heritage Place Englewood, Colorado 80111 Re: Scenic Views Dear Bill: Please find attached the revised development agreement for the Scenic Views project with some of your comments incorporated. However, the bulk of the comments are not acceptable to the City. Primarily, those comments that deal with the affordable housing and storm water aspects of the agreement. I did address some of your comments that apply to the "boiler plate" and standard sections, but will not change Page 2,1 - General Condition C. The word private street has been added. However, the 660 foot is a requirement of emergency services and will not change.. Page 3,1 - General Condition E. No changes have been made. When I get confirmation from staff on what portion or portions of this project are designated as affordable housing, I will then add a Special Condition clause to address any special considerations. Page 3, 1 - General Condition F changes are okay Page 4, 1 - General Condition I - no changes made, any items outside of the none will be addressed under Special Conditions sections when applicable. None of your other comments will be addressed, they fall outside the scope of the City Code and/or are not acceptable to the City . At this time the requested changes to the special sections of the agreement are still under consideration and once some form of understanding is made between the City and yourself the agreement will be revised to reflect those changes. In addition, I am returning to you the Sepia set of Utility plans unsigned. Please obtain the necessary ditch company signatures before resubmitting them to me for City signatures. In addition, you will need to submit the final Plat, Site and Landscaping plans to Mr. Bob Blanchard in the City's Current Planning Department Sincerely, ` L���D�aviidd Stringer Develop Development Review Supervisor cc: Scenic Views File: 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605 RMRI ®�►% rocky mountain research institute marketing, real estate and economic consultants DATE: July 23, 1997 TO: Dave Stringer, Engineering Dept. CITY OF FT. COLLINS 281 N. College Ft. Collins, Colorado 80525 FROM: Bill Veio, Manager SOLITAIRE PROPERTIES, LLC 6645 a nerrcage place s¢ - englew.d. m BO 1 1 1 _ 3C3-721-gp54 RE: SECOND FORMAL REQUEST FOR DEVELOPMENT AGREEMENT DRAFT FOR REVIEW & APPROVAL ON SCENIC VIEWS On June 11, 1977 we sent our Draft of the Development Agreement for Scenic Views to Ward Stanford for critique and review. After a month had passed and we had not received a city draft of the Development Agreement nor any response to our request, I called Ward for a status report. He informed me that he had been transferred off the Scenic Views project and that you were now responsible for preparing the Development Agreement. According to the city Development Manual, we are supposed to have received a draft at least two weeks prior to the P & Z hearing, and are supposed to have a signed Development Agreement prior to the Final P & Z I Iearing. I have requested a draft from Kerrie Ashbeck prior to our Final Approval, have requested a draft from Ward Stanford, and also from you in our conversation of a week ago. You told me you don't write the Development Agreement until mylars are requested. I have reviewed all of the comments and question marks on the redlines I received on July 9 and can't find one substantial comment that effects the Development Agreement. There are no major design Flaws, issues, or changes in any of the comments. The comments are primarily of a "housekeeping variety", comments addressing legibility, clarity, double notation, and drafting techniques, and completeness, and neatness of notations. We will remedy as much of this as is feasible. Some of the legibility comments can't be fixed because of the multiple overlays, but can be read by referring to a different page of the drawing set. Other comments are just that... comments that have no merit. Some comments are incorrect statements by the reviewer and are clarified by our written responses. In consideration of the type of comments we are responding to and correcting, we would like you to initiate the Development Agreement now to minimize any unnecessary delays in our proposed construction schedule. I will meet this week with each reviewer and have them sign off on the Comments and the Correction Action taken, and ask them to request mylars reflecting all changes. Would you please call me and let me know who the appropriate persons are to meet with on the continents other than Roger Buffington who signed his name. Thanks. innovative ideas for industry since 1972 'd,y ! 11- 1 ; J r:' v f .e 30,-//1-414 [AX 303 //'-/198 n July 14, 1997 j City of Ft Collins City Engineer 281 N College Ave Ft Collins, CO 80522 Re: Scenic Views DUD Dear Sir: am writing to notify you that Civil Engineering Services is not representing Mr. Bill Veio in the approval process for Scenic Views PUD. Any further processing of plans with CES's work or logo is not authorized- I will not be signing this plan. Sincerely / John F. Coats, P.E. Civil Engineering Services X eM,. og)9 South Hnly Circle • Suite 160 • Fo�lewood, CO 80112 • Off,ce: 303-%71-4191 • FAX 303-771-4198 August 7, 1996 Ms. Kerrie Ashbeck City of Ft. Collins Engineering Dept 281 N College Ave yt Collins, CO 80522 Re: Scenic Views PUD - Utility Plans Dear Ms. Ashbeck: We have reviewed the second set of comments for the Scenic Views PUD. We appreciate your allowing us to submit a response to the important issues prior to the August 7 deadline for the August P&Z hearing and follow up with a complete plan submittal addressing all comments. Enclosed is a copy of the Overall Utility Plan showing the proposed solution to the key review comments. A complete set of Utility Plans will be submitted as soon as possible addressing all comments. There have been several outstanding issues of contention between the developer and the City which we would like to resolve at this point in hopes of gaining a favorable recommendation from Staff to the Planning & Zoning Board. They are: The City's requirement that all access easements be public thus precluding the possibility of having a gated community. We will concede to this requirement. 2. Sidewalk along Elizabeth and Overland Trail has been moved to the right of way to conform to the current Street Classification and Typical Section (old standard). The following is an item by item response to the Engineering Dept. review comments: 1/1 'Title Sheet A reference copy of the West Elizabeth and Overland Trail plans prepared by Stewart & Associates has been included in this plan set. 'The sidewalk along W Elizabeth and Overland Trail has been relocated as required. The handicap ramps will be constructed to the City of Ft Collins detail D 12.5 dated 2/96 which has been added to sheet 18 of the Utility Plans. This detail apparently replaces Detail 13 from the previous design standards was shown on sheet 18 of the previous submission of Utility Plans. A 2 foot area at a 2% grade behind the sidewalk has been shown on the typical section and grading. Sheet 1/2 Plat: The dedication statement has been revised. 2. The Right of Way's for W Elizabeth, Overland Trail and Orchard have been labeled as "Existing" on the plat. 3. The Plat has been titled "Plat of the Second Replat of Scenic Views PUD". 4. Note 4 has been revised as required. 5. Note 6 has been eliminated to avoid confusion. Sheet 2/2 Plat I . Tract D has been labeled a private drive. 2. The common Drives have been labeled as "Public Access, Utility and Drainage Easements" as discussed above. I does not apply to "Driveways" on the lots in the Duplex area. 3. Duplicate comment. 4. Tract C is the parking area adjacent to Lot 8. 5. The total right of way widths have been labeled. The current ROW on Overland is 60' east of the section line and 50' west for a total of I10'. The current ROW on Elizabeth is 50' north of center line and 40' south for a total of 90' 6. Duplicate comment. 2/22 Overall Utility Plan Phasing has been revised. There are now 5 phases. Phase I is the detention pond area and the duplex area. Phase 11- Phase IV are the development of the condo area in three stages. Phase V is the Daycare center. 2 A Phasing Plan has been added to the plans showing the utilities and site improvements to be constructed with each Phase. Limits of construction for each Phase of utility construction is shown on the appropriate Plan & Profile Sheets. Street improvements will be completed with adjacent phases. The street improvements along Overland Trail north of the out parcel will be completed with Phase I. Parkway improvements along Elizabeth and road improvements along Overland Trail will be completed with the adjacent phase of construction. 2. The entrances will be concrete to property line. 3. The medians have been moved so that the lip of curb is on the ROW. 4. Duplicate Comment. 3/22 Drainage and Erosion Control Plan Duplicate Comment Duplicate Comment Additional field work is being done to show the existing grade and grading will be revised before the next submission. The grading on the property to the north doesn't appear to be a problem since it all drains to the existing drainage swale along the north edge of Scenic Views. This drainage Swale is being filled in with the Scenic Views grading. Local drainage from the north will drain along the toe of the proposed grading. Manhole ST-4, located at the north east corner of Lot 6 will be changed to an area inlet to collect these flows. As we discussed, we will stop curb & gutter at the proposed inlet and slope to existing grade along the Scenic Views property. The existing driveway on the lot to the north is located along the south portion of that lot. Review of the proposed profile of Overland Trail shows that sight distance to the south will be over 1000' and will be 500 feet to the north. 4. The easement for drainage across the Mountainaire Subdivision is in place and a copy is located in an Appendix to the Drainage Report. See attached commitment to grant easements. 5. The Developer still plans to develop the Single Family portion of the site on the adjacent two lots. At that time Orchard Place will be extended to the west and end in a cul-de-sac. A preliminary profile will be prepared and submitted along with the plans to show the proposed grade of this cul-de-sac. 6. Construction fence will be added to the Erosion Control Plan along the north property line adjacent to the lot west of the canal and around the out parcel along Overland. The Erosion Control plan already shows silt fence along the east property line on the west side of the canal and around the detention pond area. This should cover the critical areas. 4/22 Drainage & Erosion Control Plan Duplicate comment. 6/22 Site Improvement & Grading Plan I. Duplicate comment. 2. A sheet has been added to the Utility Plans showing actual details of each driveway entrance. 7/22 Site Improvement & Grading Plan 1. Duplicate comment. 8/22 Site Improvement & Grading Plan I . Duplicate comment. 2. Duplicate comment. 3. Duplicate comment. 13/22 Overland Trail Plan & Profile l . The street name has been revised to Overland Trail from South Overland Trail throughout the Utility Plans. 2. Additional detail has been added to the plans 3. Duplicate comment / 4. Duplicate comment 5. The existing right of way along the out parcel is 50 feet. This is adequate room to construct all road improvements except sidewalk. Mr Matt Baker has committed to fund the improvements in this area. 4 6. The intersection of overland and Elizabeth has already been constructed by Lory Ann Estates. The Plan & Profile of Overland in the Scenic Views plan has been revised to match the design ofLory Ann Estates. � � � . � ( f Af 7. The construction limits will be shaded 8. A legend has been added to the Signing and Striping plan. 9. All lines are shown and adequately labeled. 10. Duplicate comment. 11. Additional copies of the plans will be provided for Street Oversizing and Traffic Operations to review. 14/22 Overland Trail Plan & Profile Duplicate Comment 15/22 Overland Trail Cross Sections Areas of asphalt construction and overlay will be shown on all cross sections. 2. All cross slopes on the proposed section are really intended to have a 2.00% cross Slope. Cross slopes are calculated to the lip of curb as is standard. 3. The requirement that Overland be designed with a 50 mph design speed will P tia.r„ require that major portions of the road be completely rebuilt. The cross sections i Jc will be revised accordingly. 4. The sidewalk will be shown on all cross sections. 5. The required grading behind the right of way will be shown on all cross sections. 16/22 Overland Trail Cross Sections l . Duplicate comment 2. Additional cross sections will be added. 16/22 Overland Trail Cross Sections Duplicate comment. The following is an item by item response to the Stormwater Dept. comments: 2. Additional field work is being done to show the existing grade and grading will be revised before the next submission. The grading on the property to the north doesn't appear to be a problem since it all drains to the existing drainage swale along the north edge of Scenic Views. This drainage swale is being filled in with the Scenic Views grading. Local drainage from the north will drain along the toe of the proposed grading. Manhole ST-4, located at the north east corner of Lot 6 will be changed to an area inlet to collect these flows. Additional field work is being done to show the existing grade. Additional detail \ will be provided on the existing borrow ditch along Elizabeth. 3. On s' grading has been clarified. 4. Overflow swales have been provided at inlet 3 and 4. Flow calculations will be �ICJpV included in the next submittal. Drainage easements have been provided at these inlets. 5. Additional detail has been added to show how the over flow is conveyed downstream. 6. The SWMM model will be updated. The grading will be revised. 8. The location of the pipe, the actual configuration of the house and the proposed drainage easement will be revised on the next submission of the plans. The actual location of the existing house is approximately 11 feet east of the property line. The storm sewer will be moved to 5 feet east of the property line. This will leave 6' between the storm sewer and the existing house. Additional documentation will be provided on the program. 10. Per the hydraulic grade line calculations, the head required to maintain flow in the pipe is below the water surface used in the orifice calculations. Therefore the orilce is not submerged and will operate as an orifice. 11. A cross .section and calculations will be provided for the drainage swale. 12. The 5 foot inlet at design point 4 has been designed to intercept flows from both the south and future north road improvements. When road improvements are completed to the north the parkway grading required will provide the necessary 1' ponding depth. 6 For the interim condition runoff from the north will continue to flow overland to the Swale described above. The total drainage area to Design Point 4 is 1.32 acres of which 0.55 acres is located south of the inlet. The 100 year runoff from the south is 3.4 cfs. At a 0.5 foot pending depth the capacity of the 5 foot inlet is 50,930.8 = 3.7cfs which will intercept the entire runoff from the south. A temporary asphalt curb will be added at the end of the pavement widening to ensure that the 0.5' ponding depth is obtained. 13. The comments on the plan set and drainage report will be addressed with the next submission. The following is an item by item response to the Water & Wastewater Dept. comments: 1/22 Cover Sheet Please provide a copy of the most current standards if the referenced standards are outdated. 2/22 Overall Utiity Plan Utilities, curb & gutter and centerline of W Elizabeth ST have been clarified. 2. The water line in Elizabeth and the curb & gutter are both existing. 3. The water service to the Clubhouse has been moved to provide a 10' separation fi om the sanitary sewer service for Building 1. 4. Notes have been revised as requested. 5. The easements on the Overall Utility Plan have been revised to match the Plat. 6. Curb stops have been located in landscaped areas and enclosed in easements. 7. The water service sizes have been called out on the plans 8. A legend has been added to the cover sheet 9/22 Sanitary Sewer Plan & Profile 1. The conflict between the sanitary laterals and the storm sewer has been resolved by raising the storm sewer. 2. The grading has been revised to provide a minimum of 4' cover. 7 RMRI rocky mnuntain research institute rnorker_irq. rc• vl ( zrrire :and economic consultants DATE: December 31, 1997 6645 c 1 ritayc pl-acc _,vi cnyltwoo�. co E301 303-721-9054 TO. Dave Stringer, Development Review Supervisor FAX:970-221-6378 CITY OF FF. COLLINS Pages: 1 281 N. College Via Mail Ft. Collins, Colorado 80525 FROM: Bill Veio, Manager SOLITAIRE PROPERTIES, LLC RE: REVISIONS TO THE DECEMBER 18,1997 DRAFT OF DEVELOPMENT AGREEMENT -SCENIC VIEWS Thanks for making the last set of incorporations which were important to us. The four outstanding issues on your 12-18-97 list have been resolved with the respective language clauses found below and on the attached draft of the Development Agreement. 1. The Affordable Housing Commitment. Refer to the attached 25-Year Protective Covenant for Scenic Views. We will be unable to identify the individual units until the purchaser is qualified for a given home. At the time of the buyer's closing the deed restriction will be recorded for the respective unit. 2. Street Oversizing Language. After discussions with Matt Baker, the following additional language is proposed for Page 9, Paragraph 3: "Such reimbursement shall be made to the City after the Developer has completed all oversizing improvements to Overland Trail which shall occur no later than the issuance of the 11th building permit for a total of 88 residential units (excluding permits for garages, the recreation center, pool, and fences), at which time or before, the Developer will submit invoices for the oversizing improvements to the City for repayment. The City may elect at that time to credit the above amount towards repayment of such oversizing improvement invoices presented by the Developer." 3. Wetlands/Natural Resources Language from the City Stormwater Dept. The wetlands commitment has been incorporated into page 1, item number 7 as an improvement, plus page 7, item 7 mentions the requirement to establish an area of wetlands within the detention area. 4. Pleasant Valley & Lake Canal Company Language. We have added their clauses on pages 4, 6, 7, and 12. Page 4, end of paragraph H. Add "the Pleasant Valley and Lake Canal Company". 1 innovative ideas for industry since 1972 Water main notes have been removed 4. Stations have been called out on sanitary laterals. Lateral tables have been removed. 5. The storm sewer crossing the water line has been concrete encased. 6. A detailed profile of the water main crossing of the PV&L canal has been added. A Clay cut off wall has been added on the downstream side of the crossing. 7. Cut off walls have not been added to the sanitary sewer at the PV&L canal crossing since there is under drain in this area. A cut ofl'wall is shown at station 1+58 (54' from the center line of the canal) at the point where the underdrain leaves the sanitary sewer alignment. 10/22 Sanitary Sewer Plan & Profile I . The fire hydrant crossing has been plotted 2. Existing & Proposed grades have been called out. 3. Water main notes have been removed. 4. Sanitary lateral stations have been called out. The lateral tables have been deleted. 5. The dimension of the sewer line between MH I-11 and 1-12 has been corrected. 6. Engineering and Stormwater don't have an underdrain standard. 1/22 Sanitary Sewer Plan & Profile Thrust blocks have been shown on the water main. 2. Sanitary lateral stations have been called out. The lateral tables have been deleted. The w/m crossing is an 8" 4. The sanitary sewer has been moved over an additional 2 feet to separate SSMH 3- 2 trom the thrust block some more. 12/22 Sanitary hewer & Water Details The requested details have been added to the plan 2. The cut off walls will be designed in the soils report. 18/22 Road Improvement Details The City of Ft. Collins manhole adjustment detail has been revised to eliminate using bricks to adjust grade. 19/22 Storm Sewer Plan & Profile. The storm sewer has been raised to eliminate the conflict with the sewer laterals. 2. The lines in the plan view have been eliminated. 19/22 Storm Sewer Plan & Profile. Concrete encasement has been specified at the w/m crossing. 2. Sheet 9 has been corrected to show a 30" RCP. 3. The sanitary sewer and water crossings will be added to the profile. This completes our response to the review comments for Scenic Views PUD. If you have any questions or additional comments please call me at 303-771-4191. SinceF* n John F. Coats, [I.E. 9 0 0`) S,i) th Fi,Ly (,- Ici • Surte 160 June 28, 199E Ms. Kerrie Ashbeck City of Ft. Collins Engineering Dept. 281 N College Ave Pt Collins, CO 80522 pttm4. s .a":.4 YF' Englewood, CO 80112 Offic¢ 303-711-4191 FAX 303 771-4198 Re: Scenic Views PUD - Utility Plans Dear Ms. Ashbeck: Attached are 4 copies of the revised Utility Plans and 2 revised copies of the Drainage Report along with the red line sets of plans you returned to us. I would like to apologize for the incomplete nature of the original submittal. It was submitted to meet a very tight deadline in order to be on the agenda for the July P&Z hearing. Although the original submittal was very sketchy, every attempt has been made to make this set of plans as final as possible. It is still very important to us that we be heard at the July meeting. The following is a response to the Engineering and Water and Waste Water comments on the Utility Plans. A response to the Drainage comments and the Site Plan comments are in separate letters. Engineering Title Sheet: The City's requirements for the title sheet have been added. Preliminary Layout This sheet has been renamed to Overall Utility Plan and shows the site layout, utilities and other information as required. Site Improvement Plan Sheets These sheets have been renamed to "Site Improvement & Grading Plan" They show a large scale detailed design of the site. Grading, utilities and other features are as shown on the other required sheets. Sanitary Sewer Plans and Profiles See the response to the Water and Waste Water comments below. West Elizabeth and Overland Trail Plan, Profile and Cross Sections West Elizabeth is going to be constructed along our frontage as part of the construction of Lory Ann Estates which is currently being built across the street. Stewart and Associates is currently revising their plans to reflect this change. They are working with Mr. Malt Baker of your office. The design on Overland trail has been refined. It should be noted that Stewart and Associates is also revising their design on Overland Trail in front of Lory Ann Estates. Our plans will need to be revised to match their design when it is complete. Erosion Control and Drainage Plan See separate letter from JR Engineering addressing Drainage comments. Detail Sheets Detail Sheets have been added. Water & Waste Water: Written Comments: I . The required separations from the water and sewer lines and services will be maintained. A note has been added to the landscape plan requiring a 10 foot separation to trees and a 4' separation to shrubs and the landscape plans have been adjusted to show these separations. 2. Sanitary sewer and water have been routed around the islands at the entrances. 3. Fire hydrants have been located at the specified locations. In addition to these locations Fire hydrants have been provided at the end of the water line north of building 3 and at the beginning of the cul-de-sac in the duplex area. 4. Utility locations have been coordinated with the landscape plans. Plan Redlines: Sheet I This was the first shot at a "Final Utility Plan" l hope the second submission is better. 1 apologize for any inconvenience the original incomplete submittal caused. An Index, General Notes and other requirements have been added to the Cover Sheet. Sheet 2 I . The Island at the south entrance on Elizabeth has been moved to provide a 5' separation to the fire hydrant service. 2. The connection to the existing water main at the north entrance on Elizabeth is shown connecting to the existing stub. 3. The water main serving buildings 20 through 24 has been looped. 4. Water main fittings, length of pipe and service sizes have been called out. 5. Sanitary sewer manhole numbering has been shown. Sanitary sewer stationing and service sizes are shown on the sanitary sewer plan and profiles (sheet 7-9). G. ISLANDS 7. A north arrow and other necessary items have been added to the sheet. Sheets 3-5 Water Main and Sanitary Sewer have been revised as is also shown on the Overall Utility Plan (sheet 2) and the Sanitary Sewer Plan & Profiles (sheets 7-9). 2. 0.2' of drop has been provided across all manholes. The sanitary Sewer and Water have been rerouted around the islands at the entrances. This completes my response to the review comments. If you have any questions or additional concerns, please call me at 303-771-4191. Sincerely s John F. Coats, P.E. Page 6, Item 3. Add "and thereafter". Page 7. Item 8. Replace item 8 with these words: "Nothing in this Agreement shall relieve the City, the Developer, its grantee(s), successors, or assigns, or the Homeowners Association from agreeing to approve and support any stormwater facility changes which tie into a developed drainage way and eliminate the necessity of pumping the stormwater into the Pleasant Valley and Lake Canal Company ditch." Page 12, item L. Add these words: "except for the Pleasant Valley and Lake Canal Company." S. Other Changes We Found On Last Review. There is a need to clarify that permits for garages, recreation center, pool, and fences are not included in the permit numbers for residential units. Please add these words to the pages indicated: "excluding permits for garages, and recreation center, pool, and fences" Add to Page .5, item CA. Also change "or" to "for". Add to Page 6, item C.1 in two places and change "or" to "for". Typos and spelling changes are noted on the effected pages. I will check in with you next week to see if these revisions will complete the Development Agreement for signatures. Thanks for your assistance. Rocky Mountain Research Institute 2 _tion Services Engineering Department City of Fort Collins December 18, 1997 Mr. Bill Veio: Rocky Mountain Research Institute 6645 E. Heritage Place South Englewood, Co. 80111 Re: Development Agreement for Scenic Views Dear Bill: I am sending you this latest draft copy of the Development Agreement for your Scenic Views project for your information. However, this is by no means anywhere near a final draft. As I understand them there are still several outstanding issues which need to be addressed and then added to this Agreement. Out standing issues I have recently been aware of are: The affordable housing 25 year commitment Street over sizing language that is agreeable to the City and yourself. Wet lands/ natural resources language from the City Storm Water Department Pleasant Valley and Lake Canal language to be added to the agreement at the request of the PV&L attorney through the City's. As of this date I have not received language from storm water, street over sizing, the City's Affordable Housing, department a copy from the PV&L attorney to be included in the agreement. In addition there may other issues that I am not aware of. Therefore, please be informed that a final Development Agreement for this project will not be drafted until such time as these issues are resolved. 2A1 North CoR000-A%enuc • PO. Ro.,;80 -Fort Col l ins, CO 80522-0580 • (970) 221-6605 RMRI rocky mountain research institute marketingreal estate and economic consultants DATE: December 9, 1997 TO- Dave Stringer, Engineering Dept. CITY OF FT. COLLINS 281 N. College Ft. Collins, Colorado 80525 FROM: Bill Veio, Manager SOLITAIRE PROPERTIES, LLC E645 a hem ge place so - englewo d. cn BO 1 1 1 - 303721 -5054 FAX: 970-221-6378 Pages: 3 Via mail and fax RE: DEVELOPMENT AGREEMENT REVISIONS to YOUR NOV.17 DRAFT - SCENIC VIEWS Attached are the changes requested to your Revised Development Agreement Draft of the November 17, 1997 for Scenic Views. The revisions contain the resolution of issues with the Stormwater Division, and reflect our clearer understanding of the city's repayment of street oversizing funds to developers. The Affordable Housing statements have been omitted because they are covered in the City Code, Ordinances, and Resolutions. Other paragraphs in our previous Draft have also been omitted for similar reasons. Please call and let me know if these modifications are acceptable. Thanks. Page 1, Paragraph 6. Change to read as follows: Whereas, the Parties hereof have agreed that the development of the Property will require municipal services from the City to serve the Property and will require the installation of improvements which will benefit the land to be developed and also benefit the city as follows: 1. by providing Affordable Housing for city residents, 2. by improving arterial streets, 3. by adding bike lanes to the arterial streets, 4. by providing a professionally landscaped site perimeter with detached wide sidewalks, 5. by installing underground utilities, 6. by installing public walkways and bikeways along the Pleasant Valley and Lake Canal and throughout this private development, 7. by creating a public park with trails & facilities including a wetlands area, 8. by creating storm drainage improvements which will significantly reduce the potential of downstream flooding and property damage to downstream lands, residents, and property owners. 1 innovative ideas for industry since 1972 Pages 2,3, Okay as shown. Page 4, I. General Conditions I. Change first sentence only to read: The Developer shall pay storm drainage basin fees in accordance with Chapter 26, Article VII of the City Code in the agreed upon total amount of $16,476.18 as determined by the Stormwater Division on November 7,1997. Page 5, II. Special Conditions C-1. Change to read as follows: The Developer and the City agree that all storm drainage improvements, as shown on the approved utility plans for the development, shall be completed by the Developer in accordance with said approved plans. The City Stormwater Division will allow the Developer to obtain 25% of the proposed project building permits or up to 56 units, providing all on -site storm sewer lines have been installed and certified. Additional building permits will be issued in proportion to the completed area of the total site, to the corresponding acre-feet of storage in the retention pond needed for Site -Only improvements. A simple arithmetic ratio will be satisfactory to compute the area completed and the acre feet of storage required. Total stormwater drainage improvements will be completed and certified on or before the issuance of 88 permits. This time frame provides one full year of pond operation with the improvements and allows time for pond modifications. Completion of the improvements shall include the certification by a professional engineer. The certification will be done by individual building prior to the issuance of a certificate of occupancy and will cover the associated infrastructure per building. i.e., curb and gutter, parking areas, utility plan elevations, etc.. Page 6, II. Special Conditions C-6. Change to read: The Developer and the City agree the Developer is obligated to maintain all on -site storm drainage facilities not accepted for maintenance by the City. The Developer will'transfer this maintenance responsibility to the Homeowners Association when the appropriate number of homes have been occupied by residents. The on -site improvements shall include the detention pond and all facilities associated with the drainage to and from this pond. Page 6, II. Special Conditions C-9. Change last sentence only to read: The purpose of this retention pond is to protect neighboring or downstream properties from adverse storm drainage impacts. Page 7, II. Special Conditions D-1, Streets. Add this sentence to the end of the paragraph: In the event the City repayments fall short of the Developer's Cost of Construction, the City will either rebate and/or waive the Developer's Street Oversizing Fund Fees up to the amount of the Developer's Construction Cost for oversizing of the streets. Rocky Mountain Research Institute 2 Page 8, II. Special Conditions. Add G at the request of the Ditch Company G. Maintenance of the Pleasant Valley & Lake Canal Ditch The Developer and a representative of the Pleasant Valley & Lake Canal Company have discussed maintenance conditions, detention pond and pump maintenance, canal access, public education programs, and the Developer's Stormwater Quality and Management Control Plan. The Developer has a Ditch Crossing Agreement in perpetuity with the Pleasant Valley & Lake Canal Company. A separate Permission to Discharge Controlled Stormwater Agreement will be signed by the Developer and the Pleasant Valley Lake & Canal Company. This separate Agreement allows controlled discharge of stormwater from the site detention pond into the Pleasant Valley & Lake Canal in perpetuity, providing maintenance is conducted regularly and properly and the Stormwater quality is acceptable. The Agreement will be recorded at the Larimer County Clerk and Recorder office with a copy sent to the City prior to issuance of 25% of the certificates of occupancy for the development. The Developer is responsible for the operation and maintenance of the detention pond until such time as all units to be constructed on the property are occupied. At the point in time, the Homeowners Association ("HOA") assumes ownership of the common areas, the HOA will assume the responsibility for the maintenance of the detention pond and the property along the canal. The HOA will follow Standard Operating Procedures, prepared by the Developer in conjunction with the Pleasant Valley & Lake Canal representatives, to handle grounds and pond maintenance, resident and visitor education regarding the canal as a natural resource, and other water quality and common sense programs for minimizing environmental pollution to their residences, the common areas and canal. The HOA will periodically prepare stormwater samples for testing to monitor the effectiveness of the detention pond design and to ensure water quality continues to be acceptable to the Pleasant Valley & Lake Canal Company. Page 9. Okay Page 10, III. Miscellaneous. Add this new paragraph: L. In the event any site specific development plan condition as reflected in this approved PUD Site Plan and Final Plat were to be determined invalid by a Colorado court, such condition will not invalidate the vested rights of the Developer, nor change the land use, nor the density approved for the site. Page 11. III. Miscellaneous. Correct address typo: Heritage Page 11. III. Miscellaneous. Add the following paragraph "Q": Q. Amendments to Agreement. This Agreement may be amended at any time and from time to time by the Parties subject to the same requirements of the original Agreement. Amendments to documents serving as Exhibits to this Agreement shall be permitted without requiring formal amendment to this agreement. Certain other changes shall not require a formal amendment. The City Planning Director's office shall determine whether a formal amendment is necessary. This Agreement or clauses within this Agreement may be amended or canceled by mutual consent of the Parties to the Agreement, or by their successors -in -interest. Pages 12, 13, and 14. Okay. Rocky Mountain Research Institute 3 November 18, 1997 MEMORANDUM TO: Dave Stringer, Engineering Department FM: Ken Waido, ChiefPlanner;g�c/ RE: Scenic Views Development Agreement and Providing Affordable Housing Units You asked me to review the Scenic Views Development Agreement revisions provided to you by Bill Veio, Manager, of Solitaire Properties, LLC. I spoke to Bob Blanchard, Current Planning Department Director, who is also the Project Planner for the Scenic Views development project. Presented below is a summary of my findings. The Scenic Views PUD was processed and reviewed under the criteria of the Land Development Guidance System (LDGS). The project took residential density bonus points on the LDGS Residential Density Chart for affordable housing. The LDGS has the following requirement of projects utilizing the affordable housing density bonus: The project must be accompanied by covenant documents or other adequate documents (e.g., deed restrictions) to be recorded with the Office of the County Clerk, guaranteeing the use of those dwelling units for low-income families (families earning no more than 80% of the Area Median Income as established by the Department of Housing and Urban Development). The documents shall not be accepted until approved by the City as to legal form and effect, providing that the use restriction be for at least twenty-five (25) years. The above requirement maybe waived if the dwelling units for low-income families are being provided under a contract with a governmental housing authority (e.g., the Fort Collins Housing Authority) which provided assurance that the units will be alordable for at least twenty-five (25) years. I see nothing in the submitted revisions to "Page 2, I. General Conditions B." that meets the above LDGS requirement. Of course, I did not see all of the section, but it appears that Mr. Veio must submit either covenants or deed restrictions for the City's review and approval in order to satisfy the LDGS requirement. I guess the required commitments could be contained in separate documents and just referred to in the Development Agreement, as an option. Regarding "Page 3, 1. General Conditions E." and the reference to " l . the Affordable Housing Fee Waiver for all plan submission fees." I spoke to Felix Lee, Building Permits Department Director, and he indicated the City does not waive plan check fees. Therefore, this sentence should be deleted from the Development Agreement. If the project does make the necessary commitments to housing affordability, as required above, the project would become eligible for the Development Impact Fee Delay Program and the Development Impact Fee Rebate Program assuming the requirements of those programs are met. Regarding "Page 4, I. General Conditions L", I am not aware of any "special payment provisions provided for Affordable Housing" for storm drainage basin fees. I guess the bottom line is, the City does not appear to have the necessary guarantees for housing affordability in the Scenic Views project where I would feel comfortable in approving the execution of the Development Agreement with any references to concessions for providing affordable housing. If you have any further questions, please feel free to contact me cc. Bob Blanchard